3D Numerical Analysis of the Effects of Hydraulic Tunnel Construction on Existing Pipelines
Beijing Institute of Water
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction of hydraulic tunnels can occur near existing pipelines, and it is very important to ensure the safety of these existing pipelines. Using the hydraulic tunnel at the Southern Main Canal of the South-North Water Transfer Project as an example, a 3D numerical simulation was carried out and the stress deformation law and stability of the pipeline were studied. The results show that the hydraulic tunnel construction has little impact on the stress and deformation of the pipelines.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: The construction of hydraulic tunnels can occur near existing pipelines, and it is very important to ensure the safety of these existing pipelines. Using the hydraulic tunnel at the Southern Main Canal of the South-North Water Transfer Project as an example, a 3D numerical simulation was carried out and the stress deformation law and stability of the pipeline were studied. The results show that the hydraulic tunnel construction has little impact on the stress and deformation of the pipelines.
Keywords:   
Cite this article:   
.3D Numerical Analysis of the Effects of Hydraulic Tunnel Construction on Existing Pipelines[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(5): 60-65
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I5/60
 
No references of article
[1] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[2] WANG Zaimin1 CHEN Yulin1 XU Mo1 ZHANG Shishu2 YONG Ping1.Study on Water Inflow and Burst in the Hydraulic Tunnel of Hydropower Projects in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 27-32
[3] Einar Broch.Tunnels and Underground Works for Hydropower Projects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
[4] Pan Changping1,2,3, Wu Qing1,2,3, Zhai Mingang1,2,3, Zou Shun1,2,3.Dynamic Response Analysis of the Impact of a Rockfall on a Cantilever Shed Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 155-159
[5] CAI Yan-Yan-1, 2 , ZHANG Jian-Zhi-1, YU Jin-1, 2 , FU Guo-Feng-1, YU Kai-Mu-1.Elastic Solution of Rock Stress and Displacement in a High-Pressure Hydraulic Tunnel Adjacent to a Karst Cavity[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(1): 45-54
[6] Subas Chandra Sunuwar Sandip Shah Ashish Subedi Muna Sharma.Tunnelling Challenges through Weak Tectonised Schist in Nepal - Himalaya Tamakoshi 3 Hrdroelectric Project[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(1): 1-7
[7] YANG Ling-1, 2 , HAN Li-Jun-1, 2 , WEI Li-Yuan-1, 2 .Research on Tunnel Supporting Time Based on Virtual Supporting Force[J]. MODERN TUNNELLING TECHNOLOGY, 2012,49(1): 66-71
[8] WANG De-Yun-1, Yuan-Hong-Hu-1, Wang-Zhi-Yin-2, Zhang-Qi-Wei-1.Study of In-situ Monitoring of a Shallow-Buried Hydraulic Tunnel in Loose Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2011,48(6): 94-98
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY