Pile Foundation Removal and Retaining Structure Reconstruction
1 Shanghai No.2 Municipal Engineering Co., Ltd 2 Xuzhou Communications Planning and Design Institute
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract An existing abutment pile foundation is affected by the Shanghai metro line 11 and needs to be removed. Schemes of pile foundation removal with casing pipe and water pressure and retaining structure reconstruction with type L retaining structure and mixing pile were chosen. The computation of displacement during reconstruction was performed by numerical simulation software and the results indicate that the type L retaining structure can restrain the soil settlement at the back wall and there is little displacement of the retaining structure, meeting the requirements of engineering safety and environmental protection.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: An existing abutment pile foundation is affected by the Shanghai metro line 11 and needs to be removed. Schemes of pile foundation removal with casing pipe and water pressure and retaining structure reconstruction with type L retaining structure and mixing pile were chosen. The computation of displacement during reconstruction was performed by numerical simulation software and the results indicate that the type L retaining structure can restrain the soil settlement at the back wall and there is little displacement of the retaining structure, meeting the requirements of engineering safety and environmental protection.
Keywords:   
Cite this article:   
.Pile Foundation Removal and Retaining Structure Reconstruction[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(5): 155-159
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I5/155
 
No references of article
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY