大断面黄土偏压隧道开挖侧向边坡稳定性影响分析
(1兰州理工大学土木工程学院,兰州 730050; 2兰州理工大学西部土木工程防灾减灾教育部工程研究中心, 兰州 730050)
Analysis of Lateral Slope Stability During Construction of a Loess Tunnel with a Large Section
(1 School of Civil Engineering ,Lanzhou University of Technology, Lanzhou Gansu 730050; 2 Key Laboratory of Disaster Prevention and Mitigation in Civil Engineering of Gansu Province, Lanzhou University of Technology, Lanzhou Gansu 730050;3 Northwest Center for Disaster Mitigation in Civil Engineering of Ministry of Education, Lanzhou University of Technology, Lanzhou Gansu 730050)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  大断面黄土偏压隧道穿越边坡时,由于隧道开挖断面大,施工频繁扰动土体,容易诱发滑坡、崩塌等工程风险。文章结合对隧址边坡进行预先加固的具体工程试验段,以边坡的稳定性计算为核心,选用改进的强度折减法,同时考虑抗拉强度指标与抗剪强度指标的折减;利用FLAC3D建立三维数值模型,模拟分析短台阶、CD、CRD三种施工方法对边坡稳定性的影响。工程实践表明:在大断面偏压黄土隧道开挖侧边坡潜在滑面不明确情况下,用改进后的强度折减法,分析开挖对侧向边坡稳定性的影响,其结果与实际情况比较符合;隧道连续开挖对侧向边坡稳定性影响明显;在边坡支护情况下,综合各项因素,大断面偏压黄土隧道宜采用CRD法开挖。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
陈思阳1
2
朱彦鹏1
2
忠1
2
黄丽华1
张浩亮1
关键词 隧道开挖   边坡稳定性 强度折减法   数值模拟     
Abstract: For a loess tunnel with a large section passing through a lateral slope, some engineering risks like landslide or collapse are easily induced by tunneling construction, which frequently disturbs the soil mass. Based on a test section of a specific project, the lateral slope was reinforced before tunnel construction. With stability calculation for the lateral slope and using the improved strength reduction method, as well as reductions to the tensile strength index and shear strength index, the impacts of the three tunneling methods of short bench, CD, and CRD on lateralslope stability were simulated and analyzed using the FLAC3D numerical model. Engineering practice shows that the analytical results by improved strength reduction method generally agree with the actual ones under the condition of the undefined potential sliding surface of the lateral side slope, the effects on stabilityof the lateral slope is evident under continuous excavation, and the CRD method is most suitable for the construction of a unsymmetrical loading loess tunnel with a large section once the lateral side slope is reinforced.
Keywords:   
出版日期: 2013-12-04
基金资助:基金项目:国家科技支撑计划项目 (2011BAK12B07);甘肃省自然科学基金(1107RJYA276) .
作者简介: 作者简介: 陈思阳(1983-),男,博士研究生,主要从事岩土力学、隧道工程方面的研究工作,E-mail:chensyeu@126.com
引用本文:   
陈思阳1, 2, 朱彦鹏1等 .大断面黄土偏压隧道开挖侧向边坡稳定性影响分析[J]  现代隧道技术, 2014,V51(1): 82-89
CHEN Si-Yang-1, 2 , ZHU Yan-Peng-1 etc .Analysis of Lateral Slope Stability During Construction of a Loess Tunnel with a Large Section [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(1): 82-89
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I1/82
 
没有本文参考文献
[1] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[2] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[3] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[4] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[5] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[6] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[7] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[8] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[9] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[10] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[11] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
[12] 王帅帅1 傅一帆2,3 徐 勇1 史经峰1 郭 春2,3.通过接力风机进行风量分配的隧道施工风仓式通风参数研究[J]. 现代隧道技术, 2025,62(3): 240-248
[13] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[14] 李 敬1 罗禄森1 张柏林2 胡浩然2.辅助隧道封闭后隧道内瓦斯运移富集规律研究[J]. 现代隧道技术, 2025,62(2): 201-211
[15] 郭 盈 彭文庆 陈世强 张 琼 王佳伟.隧道行车道通风模型试验当量长度计算方法与验证[J]. 现代隧道技术, 2025,62(2): 230-240
Copyright 2010 by 现代隧道技术