[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2014, Vol. 51 Issue (5) :108-113    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
软弱隧道围岩锚杆支护效应的落门试验研究
1同济大学道路与交通工程教育部重点实验室,上海 200092;2同济大学岩土及地下工程教育部重点实验室,上海 200092;3云南省交通规划设计研究院,昆明 200093;4深圳市交通公用设施建设中心,深圳518040;5上海市政工程设计研究总院(集团)有限公司,上海 200092)
A Study of the Trapdoor Test of the Bolt-Support Effects in a Soft Rock Tunnel
(1 Key Laboratory of Road and Traffic Engineering of the State Ministry of Education, Tongji University, Shanghai 200092; 2 Key Laboratory of Geotechnical and Underground Engineering, Ministry of Education, Tongji University, Shanghai 200092; 3 Yunnan Broadvision Engineering Consultants, Kunming 650011; 4 Shenzhen Traffic Utilities Construction Center, Shenzhen 518040; 5 Shanghai Municipal Engineering Design Institute Group Co. Ltd., Shanghai 200092)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  在软弱围岩中进行隧道开挖,往往因岩体变形过分或局部应力集中而导致围岩失稳破坏,在实际工程中大多采用锚杆作早期支护。文章以Ⅳ级软弱围岩为参照对象,利用相似模型试验进行了锚杆支护条件下的隧道施工过程模拟,对开挖过程中围岩的渐进破坏特征、破坏模式以及锚杆的支护效应进行了研究。试验结果表明,隧道开挖将会在隧道周边形成一应力扰动区,而真正塌落成拱的只是该扰动区的一部分;由于有锚杆的支承作用,拱顶岩体的破坏呈分区破坏模式;岩体的破坏范围主要集中在隧道两侧与水平面成45°+φ/2的扇形区域内;在隧道开挖后,拱顶上方岩体的切向应力升高形成承载压力拱,主要位于距拱顶约1.0~1.25B处(B为隧道跨度)。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
徐前卫1
朱合华2
丁文其2
李志厚3
罗云4
朱道建5
关键词:   
Abstract: Instability and even failure of surrounding rock are often caused by excessive rock deformation or local stress concentration when tunneling in soft surrounding rocks, and the anchor bolt is mainly used in practical engineering for initial support. Based on soft surrounding rock of grade IV, tunnel construction with bolt support was simulated by a similarity model test, and the progressive failure feature, failure mode of the surrounding rock, and supporting effects of an anchor bolt were studied. The results show that a stress disturbance area will be formed around the tunnel by excavation, but only a part of the disturbance area really will be damaged. Because of the support of the anchor bolt, rock damage on the crown presents a partitional failure mode, and the failure area of the rock is mainly concentrated in the sector formed by two tunnel sides with an angle of 45°+φ/2 to the horizontal plane. After excavation, a pressure-bearing arch, which is mainly located approximately 1.0-1.25B (B= tunnel span) away from the crown, is formed with increasing tangential stress of the rock mass above the crown.
Keywords Soft rock tunnel,   Progressive failure,   Bolt support,   Trapdoor test     
出版日期: 2014-08-17
基金资助:基金项目:国家自然科学重点基金项目(41130751);国家高技术研究发展计划(No.2012AA112502);西部交通建设科技项目(2011ZB04);深圳市交通运输委员会建设科技项目.
作者简介: 作者简介: 徐前卫(1973– ),男,副教授,硕士生导师,主要从事隧道及地下结构工程领域的教学与研究工作,E-mail: xuqwtju@126.com.
引用本文:   
徐前卫1, 朱合华2, 丁文其2等 .软弱隧道围岩锚杆支护效应的落门试验研究[J]  现代隧道技术, 2014,V51(5): 108-113
XU Qian-Wei-1, ZHU He-Hua-2, DING Wen-Qi-2 etc .A Study of the Trapdoor Test of the Bolt-Support Effects in a Soft Rock Tunnel [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(5): 108-113
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I5/108
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术