[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2014, Vol. 51 Issue (6) :50-57    DOI:
分析与试验 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
扩底抗拔桩极限承载力半经验半理论计算方法与试验验证
(1 同济大学土木工程学院地下建筑与工程系,上海 200092;2 上海地固岩土工程有限公司,上海200092)
An Empirical-Theoretical Calculation Method and Full-Scale Verification Test for the Ultimate Bearing Capacity of an Expanded Pedestal Uplift Pile
(1 Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2 Shanghai Geo-anchor Co. Ltd., Shanghai 200092)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  文章考虑了土体力学特性, 以及桩身材料性质、桩长与桩径(含扩底直径)、桩顶埋深、桩顶卸载与加载、群桩效应等诸多因素的影响,结合工程经验给出了计算扩底抗拔桩极限承载力的半经验半理论方法;根据扩底抗拔桩破坏面位置不同,将扩底抗拔桩破坏模式分为三类(即破坏面延伸至地表的整体剪切破坏、破坏面介于地表与扩孔段之间的局部剪切破坏与破坏面位于扩孔段附近的冲剪破坏),推导出了整体剪切破坏模式的极限平衡状态方程;并依据扩底抗拔桩轴对称条件与土体抗拉强度小的力学特征,给出了求解整体破坏面的微分筒数值解法;利用经验法估算了局部剪切破坏、冲剪破坏模式下的端阻力,进而给出了任意土层中扩底抗拔桩承载力计算步骤与方法;最后,结合一足尺试验的计算分析与承载力测试比较,验证了计算方法的可靠性与精确度。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张继红1
2
朱合华1
关键词:   
Abstract: Considering the influences of such factors as soil mechanical characteristics, pile material properties, pile length and pile diameter (including the expanded pedestal diameter), depth of the pile top, and unloading and loading around the pile top and pile group effect, combined with engineering practices, an empirical-theoretical calculation method for the ultimate bearing capacity of an expanded pedestal uplift pile is proposed in this paper. Based on different positions of the failure surface of the expanded pedestal uplift pile, the failure mode of the expanded pedestal uplift pile is divided into three types: entire shearing failure from the failure surface extending to the ground surface, local shearing failure of the failure surface between the ground surface and borehole-expanded section, and punching shear failure of the failure surface near the borehole-expanded section. An ultimate equilibrium state equation under the entire shearing failure mode is derived. According to the axial symmetry conditions of the expanded pedestal uplift pile and the mechanical characteristics of the lower soil tensile strength, a differential cylinder numerical solution is given regarding the entire failure surface. By using the empirical method to estimate the end resistances under the local shearing failure mode or punching shear failure mode, the calculating procedure and method for the ultimate bearing capacity of the expanded pedestal uplift pile in any soil layer is put forward. Finally, the reliability and accuracy of the calculating method is verified through a comparison between the calculated ultimate bearing capacity and the measured one in a full-scale test.
Keywords Expanded pedestal uplift pile,   Ultimate bearing capacity,   Ultimate equilibrium equation,   Differential     
出版日期: 2014-09-21
作者简介: 作者简介: 张继红(1975- ),男,高级工程师,博士,主要从事岩土工程与环境岩土工程领域的科研、咨询、设计与施工工作, E-mail: digusky@163.com.
引用本文:   
张继红1, 2, 朱合华1 .扩底抗拔桩极限承载力半经验半理论计算方法与试验验证 [J]  现代隧道技术, 2014,V51(6): 50-57
ZHANG Ji-Hong-1, 2 , Zhu-He-Hua-1 .An Empirical-Theoretical Calculation Method and Full-Scale Verification Test for the Ultimate Bearing Capacity of an Expanded Pedestal Uplift Pile[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(6): 50-57
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I6/50
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术