近溶腔高压水工隧洞围岩应力位移弹性解
(1 华侨大学岩土工程研究所,厦门 361021; 2中国矿业大学深部岩土力学与地下工程国家重点实验室,徐州 221008)
Elastic Solution of Rock Stress and Displacement in a High-Pressure Hydraulic Tunnel Adjacent to a Karst Cavity
(1 Institute of Geotechnical Engineering, Huaqiao University, Xiamen 361021; 2 State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221008)
Download: PDF (1376KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 考虑开挖及渗流影响的水工隧洞围岩稳定是一个重要课题,而近溶腔高压水工隧洞围岩应力位移研究是该课题的难点。据此,文章基于弹性假设理论,引入反溶腔作用系数,采用复势理论求解近溶腔水工隧洞开挖问题,获得围岩应力及位移解析表达式。将水工隧洞内水外渗的各影响因素简化为轴对称情况,并将渗流场以渗透体积力方式作用于应力场,采用平面应变理论求得正常运行期的过水公式,最后通过叠加原理求得弹性解。在满足挪威准则条件下,对比内水外渗前后的计算结果,依次探讨反溶腔作用系数、岩石孔隙水压力及埋深等的影响规律。分析结果表明:初次充水对围岩稳定起决定作用;反溶腔作用系数及埋深增大有助于围岩稳定;在岩石孔隙水压力影响下,溶腔一侧环向应力场出现大小值交换现象,而径向应力场并不出现该现象;近溶腔水工隧洞围岩偏压效应随着反溶腔作用系数的增大而弱化。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
蔡燕燕1
2
张建智1
俞缙1
2
傅国锋1
俞凯木1
关键词:   
Abstract: The stability of surrounding rocks in hydraulic tunnels under the effects of excavation and seepage is an important subject, for which the study on rock stress and displacement in high-pressure hydraulic tunnels adjacent to karst cavities is tough. In this paper, based on the elastic hypothetical theory, the karst cavity action coefficient and the complex potential theory are used to solve problems during excavation of the hydraulic tunnel adjacent to a karst cavity so that the analytical formula of rockmass stress and displacement is obtained. Each influential factor of water seepage out of the hydraulic tunnel is simplified to an axisymmetric case, and the effects of seepage fields are taken as a seepage body force acting on the stress fields. The plane strain theory is used to obtain a calculation formula to solve the water-filling problem during a normal operation period. Finally, an elastic solution is obtained by using the superposition principle. Based on the prerequisite of being in conformity with the Norway Criterion, the effects of the karst cavity action coefficient, rock-pore water pressure, and overburden are successively discussed by comparing the calculation results before and after water seeping out the tunnel. The analytical results show that the initial water filling plays a decisive role in rock stability; the increment of the karst cavity action coefficient and depth contributes to rock stability; under the influence of rock-pore water pressure, the circumferential stress field adjacent to the karst cavity presents a phenomenon of alternating higher values and lower values, which is not the case for the radial stress field; and the rock bias effect of the hydraulic tunnel adjacent to a karst cavity decreases with the increasing of the karst cavity action coefficient.
KeywordsKeywords High-pressure hydraulic tunnel,   Rock stability,   Karst cavity,   Seepage,   Complex potential theory,   Norway criterion     
出版日期: 2014-09-10
基金资助:

基金项目:国家自然科学基金项目(51374112);福建省自然科学基金资助(2014J01160);中国矿业大学深部岩土力学与地下工程国家重点实验室开放基金项目(SKLGDUEK1304).

作者简介: 作者简介:蔡燕燕(1982-),女,博士,副教授,硕士生导师,主要从事岩土力学与试验方面的研究及教学工作,E-mail: yycai@hqu.edu.cn.
引用本文:   
蔡燕燕1, 2, 张建智1等 .近溶腔高压水工隧洞围岩应力位移弹性解[J]  现代隧道技术, 2015,V52(1): 45-54
CAI Yan-Yan-1, 2 , ZHANG Jian-Zhi-1 etc .Elastic Solution of Rock Stress and Displacement in a High-Pressure Hydraulic Tunnel Adjacent to a Karst Cavity[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(1): 45-54
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I1/45
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术