近距离下穿盾构隧道对上覆运营地铁隧道的影响研究
(1广州市市政工程设计研究总院,广州 510060; 2华南理工大学土木与交通学院,广州 510641)
Influence of the Approaching Construction of Underlying Shield Tunnels on Overlying Metro Tunnels
(1 Guangzhou Municipal Engineering Design & Research Institute, Guangzhou 510060; 2 School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641)
Download: PDF (1025KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 盾构隧道掘进对邻近建筑物影响问题一直是个工程难题。文章采用有限元法对近距离下穿盾构隧道施工进行模拟,分析了新建隧道动态掘进时既有隧道的位移变化规律。基于双面弹性地基梁理论与盾构隧道纵向等效连续化模型,推导了既有地铁隧道受新建盾构隧道开挖影响管片张开量的计算公式,计算分析了管片张开量分布规律。分析结果表明:盾构掘进时对上覆斜交隧道影响区域主要在新建隧道轴线两侧2D(盾构直径)范围内;既有地铁的竖向位移主要分布在盾构掘进面前方2D和盾尾后1.5D范围内产生;既有地铁盾构隧道管片在新建隧道轴线正上方左右两个接头处张开显著,出现塑性变形。工程中需以既有地铁与下穿隧道相交处为轴,对既有地铁隧道侧向2D范围及两隧道间土层进行局部加固,以防新建隧道掘进引起既有地铁隧道纵向变形与张开过大。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: The effects of shield tunnelling on adjacent buildings have long been a serious problem. In this paper, the approaching construction of an underlying shield tunnel was simulated by the finite element method and the displacement variation law of the existing metro tunnel during construction of the underlying shield tunnel was analyzed. Based on the double-sided elastic foundation beam theory and the shield tunnel longitudinal equivalent continuous model, a calculation equation for the segment openings of the existing metro tunnel affected by construction of the new shield tunnel was deduced and the distribution law for the segment openings was analyzed. The analysis results show that: 1) the area of the overlying, obliquely crossing metro tunnel affected by shield tunnel construction is mainly located in the range of 2D (D=tunnel diameter) on both sides of the new shield tunnel axis; 2)the vertical displacement distribution of the existing metro tunnel is mainly within the range of 2D ahead of the working face and 1.5D behind the shield tail; 3) the segment opening of the existing metro tunnel appears obviously at the two joints(left and right) directly above new the shield tunnel axis and is accompanied by plastic deformation; and 4) the area within 2D of the sides of the existing metro tunnel and the soil layer between the two tunnels should be locally reinforced to prevent longitudinal deformation and excessive segment opening of the existing metro tunnel associated with the new shield tunnelling.
KeywordsShield tunnel,   Approaching construction under existing tunnel,   Displacement influence,   Segment opening,   Numerical analysis,   Double-sided elastic foundation beam,   Equivalent continuous model     
基金资助:

基金项目:国家自然科学基金资助项目(51108190);华南理工大学亚热带建筑科学国家重点实验室自主研究课题资助项目(2012ZC27).

作者简介: 作者简介:杨春山(1986-),男,博士后,主要从事隧道与地下结构研究工作,E-mail:soildoctor@163.com.
引用本文:   
.近距离下穿盾构隧道对上覆运营地铁隧道的影响研究[J]  现代隧道技术, 2015,V52(5): 145-151
.Influence of the Approaching Construction of Underlying Shield Tunnels on Overlying Metro Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(5): 145-151
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2015/V52/I5/145
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术