富水砂层中地铁隧道施工降水现场试验研究
(1北京城建设计研究总院有限责任公司,北京 100037;2中国海洋大学,青岛 266100;3青岛海大建科岩土 工程有限公司,青岛 266100)
Field Dewatering Test for Metro Tunnelling in a Water-Rich Sand Stratum
(1 Beijing Urban Engineering Design & Research Institute Co. Ltd., Beijing 100037; 2 Ocean University of China, Qingdao 266100; 3 Jianke Geotechnical Engineering Co. Ltd.of Qingdao Ocean University, Qingdao 266000)
Download: PDF (4380KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 在富水砂层地区修建地铁,降水是施工的关键。文章在总结分析青岛地区含大量粘粒的砂层这一特殊地层的物理力学性质基础上,以河西站—河东站区间典型断面为背景,布设试验断面,对降水效果及对周边环境影响进行了研究。研究结果表明,通过管井降水可基本将水位降至边墙至仰拱位置,但在土岩组合面,降水困难;水位降低3.57~4.73 m,失水引起的沉降约为-5.58~-10.72 mm;地表最终累计沉降为-24.93~-75.72 mm,降水引起沉降约占总沉降的14.15%~24.65%;降水引起建筑物沉降约-5.1~-2.1 mm,建筑物累计沉降为-18.37~-7.25 mm,降水引起建筑物沉降约占总沉降的17.40%~29.05%,降水对周边环境影响不大;相比非降水施工,利用管井降水后采用小导管加固,在秋冬少雨季节,施工效率明显提高,但在多雨季节,施工容易造成地层大范围下沉,需提高地层加固强度。同时,采用FLAC3D数值模拟软件对降水效果进行计算,计算结果与现场试验基本相符。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Considering that dewatering is essential for metro construction in water-rich sand strata, and using a typical section of the running tunnel from Hexi Station to Hedong Station as an example, the dewatering effect and its influence on the surrounding environment were researched in a test section in Qingdao based on an analysis of the physical and mechanical properties of the sand stratum, which had a high number of clay particles. The results show that groundwater can be lowered to a level between the invert and sidewall under normal conditions by tube well dewatering, but this will be difficult in a combined rock and soil stratum; lowering the water level of 3.57~4.73 m may cause ground settlement of-5.58~ -10.72 mm; the total ground settlements are -24.93~-75.72 mm, of which the settlement induced by dewatering is 14.15%~24.65%; the total building settlements are -18.37~-7.25 m, of which the settlement induced by dewatering is 17.40%~29.05% (about -5.1~-2.1 mm), showing that dewatering has little effect on the surrounding environment. Compared to construction with no dewatering, adopting tube well dewatering and condulet reinforcement can improve construction efficiency in dry seasons such as autumn and winter while it may induce a wide range of settlements in rainy seasons, which necessitates enhanced reinforcement strength of the stratum. The dewatering effect was also calculated by FLAC3D software, indicating that the calculated results agree well with the tested ones.
KeywordsWater-rich sand stratum,   Combined rock and soil stratum,   Metro tunnel,   Dewatering construction,   Settlement     
基金资助:基金项目:国家自然科学基金资助项目(41202204);岩土及地下工程教育部重点实验室开发基金(KLE-TJGE-B1107);青岛地铁科研课题(SDSITC-0108310).
作者简介: 作者简介:雷 刚 (1979-),男,硕士,主要从事岩石隧道及地铁工程的理论与设计研究工作,E-mail:taizil@tom.163.com.
引用本文:   
.富水砂层中地铁隧道施工降水现场试验研究[J]  现代隧道技术, 2016,V53(2): 173-181
.Field Dewatering Test for Metro Tunnelling in a Water-Rich Sand Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(2): 173-181
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I2/173
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术