[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2016, Vol. 53 Issue (5) :168-175    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
强风化花岗岩隧道水平旋喷桩预加固效果分析
( 1中铁第一勘察设计院集团有限公司,西安 710043; 2长安大学陕西省公路桥梁与隧道重点实验室,西安710064; 3福州市城乡建设发展总公司,福州 350004; 4 中国有色金属工业西安勘察设计研究院,西安 710054)
On the Effects of Horizontal Jet Grouting Pile Pre-Reinforcement of Tunnels in a Strong Weathered Granite Stratum
(1 China Railway First Survey and Design Institute Group Co. Ltd., Xi′an 710043; 2 Shaanxi Provincial Major Laboratory for Highway Bridge & Tunnel, Changan University, Xi′an 710064; ; 3 Fuzhou Urban Construction and Development Co. Ltd.,Fuzhou 350004;4 Xi′an Engineering Investigation and Design Research Institute of China National Non-Ferrous Metal Industry, Xi′an 710054)
Download: PDF (2754KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要      福州市湖东东路隧道暗挖段穿越砂土状强风化花岗岩地层, 地表沉降控制要求高, 设计采用水平旋喷桩预加固辅助措施。为指导实际施工、 确定施工的监测重点, 文章采用三维弹塑性有限元方法, 对水平旋喷预加固效果及隧道结构体系位移变化规律进行了研究。结果表明, 与无旋喷桩加固工况相比, 采用旋喷桩加固后, 隧道拱顶的最终沉降值减少了 63.45%, 掌子面的最终纵向位移值减少了 69.6%, 掌子面的塑形应变区范围也明显减小。水平旋喷桩预加固措施能够有效地控制变形, 加固效果十分明显。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: In Fuzhou, the bored section of the Hudongdonglu tunnel passes through a sandy strong weathered granite stratum and therefore requires strict control of surface deformation. Horizontal jet grouting piles pre-reinforcement technology was adopted in its design. In order to guide construction and identify the key points for tunnel construction monitoring, a study on the pre-reinforcement effect of horizontal jet grouting piles and the law of tunnel structure displacement was performed using the 3D elasto-plastic finite element method. Study results show that with reinforcement with horizontal jet grouting piles, compared to construction with no horizontal jet grouting piles,the final settlement of the arch crown was reduced by 63.45%, the longitudinal displacement of the tunnel face was decreased by 69.6% and the plastic strain area of the tunnel face was reduced dramatically. The pre-reinforcement by horizontal jet grouting piles effectively controls the deformation and has a remarkable reinforcement effect.
KeywordsTunnel,   Strong weathered granite stratum,   Horizontal jet grouting piles,   Numerical simulation,   Dis? placement,   Plastic strain     
基金资助:

基金项目: 陕西省科技厅工业科技攻关项目 (2015GY185) .

作者简介: 作者简介: 汪 珂(1989-), 男, 硕士, 主要从事地铁结构设计及科研工作, E-mail: 372836091@qq.com.
引用本文:   
.强风化花岗岩隧道水平旋喷桩预加固效果分析[J]  现代隧道技术, 2016,V53(5): 168-175
.On the Effects of Horizontal Jet Grouting Pile Pre-Reinforcement of Tunnels in a Strong Weathered Granite Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(5): 168-175
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2016/V53/I5/168
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 杨绍玉1 王啸天2 张培元1 刘胜臣1 李树忱2 李洛宁2.钻爆法隧道喷膜防水技术研究综述[J]. 现代隧道技术, 2025,62(4): 1-14
[4] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[5] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[6] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[7] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[8] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[9] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[10] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[11] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[12] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[13] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[14] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[15] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
Copyright 2010 by 现代隧道技术