[an error occurred while processing this directive]
 
       �� ҳ  |  �ڿ�����  |  ��ί��  |  Ͷ��ָ��  |  �ڿ�����  |  ������  |  ���԰�  |  ��ϵ���� |  English
�ִ�������� 2017, Vol. 54 Issue (1) :123-129    DOI:
��������� ����Ŀ¼ | ����Ŀ¼ | ������� | �߼����� << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
����ʩ���Ŷ�Ӱ���µ��������������ѹ�仯��ֵ����
(1 �㽭��ְͨҵ����ѧԺ�� ���� 311112�� 2 �㽭��ѧ����ѧԺ��ľ����ϵ�� ���� 310015��3 ���ݺ��۵������޹�˾�� ���� 310017)
Numerical Analysis of Post-Construction Subway Settlement and Variation of Pore Pressures under the Influence of Construction Disturbance
(1 Zhejiang Institute of Communications, Hangzhou 311112; 2 Department of Civil Engineering, Zhejiang University City College,Hangzhou 310015; 3 Hangzhou MTR, Hangzhou 310017)
Download: PDF (2796KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
ժҪ  Ŀǰ�� ����ʩ������ĵػ������κͿ�ѹ�仯���ܵ��㷺���ӡ���������Henkel���������Ӧ�������µij���϶ˮѹ�����ۣ� ���������ߴ���ʼ����϶ˮѹ���� ͨ��MIDAS-GTS������ά����Ԫģ�ͣ� �Ժ��ݵ�������̽������ֵģ�⣬ ��������ʩ���Ŷ�Ӱ��Ĺ���ͬʱ����ڵػ��������Ϳ�ѹ�ֲ����ɡ���������� ʩ����ɺ� �����еij���ѹ�ֲ������ҶԳƷֲ��� �ҿ�ѹ����ɢ�̶���ػ����̽�Ȼ���һ�£� �̽������Ҫ�����ڶܹ�������ڣ� ���ֵ�����ڵر��� �̽��Խ�ߣ� �ɵ�������������Ŀ�ѹ�仯��ԽС��
Service
�ѱ����Ƽ�������
�����ҵ����
�������ù�����
Email Alert
RSS
�����������
�� �� 1
2 �� �� 2 ������ 3 �� 2 ����� 2
�ؼ�����   
Abstract�� At present, the subsoil deformation and pore pressure variation caused by metro construction have re? ceived extensive attention. Based on the Henkel pore pressure theory under three-dimensional stress conditions, the initial excess pore pressure at a tunnel spring line was obtained. The post-construction consolidation of the Hangzhou metro was simulated through the establishment of a three-dimensional finite-element model by MIDAS-GTS,and the subsoil settlement and distribution of the pore pressure at different time periods due to construction disturbance was analyzed. The results show that: the distribution of excess pore pressure is symmetrical and its dissipation is consistent with the subsoil consolidation degree after construction; consolidation settlement mainly occurs at the beginning of shield tunnelling and reaches a maximum at the ground; and the variation of pore pressure caused by metro operation decreases with an increase of the consolidation degree.
Keywords�� Shield construction disturbance,   Metro operation,   Consolidation settlement after construction,   Distribu? tion of excess pore pressure,   Different consolidation degrees     
��������:������Ŀ�� �㽭ʡ��Ȼ������Ŀ(LQ16E080008)�� ������Ȼ��ѧ����������Ŀ(51278463�� 51508506).
���߼��: ���߼�飺 �� ��(1975-)�� �У� �����ڣ� ��Ҫ���������̵Ľ�ѧ�Ϳ��й����� E-mail�� chenkai_gis@zjvtit.edu.cn.
���ñ���:   
�� �� 1, 2 �� �� 2 ������ 3 κ�½� 2 ����� 2 .����ʩ���Ŷ�Ӱ���µ��������������ѹ�仯��ֵ����[J]  �ִ��������, 2017,V54(1): 123-129
CHEN Kai- 1, 2 Ding- Zhi- 2 Gu-Xiao-Wei- 3 Wei-Xin-Jiang- 2 Ge-Guo-Bao- 2 .Numerical Analysis of Post-Construction Subway Settlement and Variation of Pore Pressures under the Influence of Construction Disturbance[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(1): 123-129
���ӱ���:  
http://www.xdsdjs.com/CN/      ��     http://www.xdsdjs.com/CN/Y2017/V54/I1/123
��
û�б��IJο�����
[1] �޹�ҫ 1 ������ 2 ����� 1 ������ 3 ����� 4.��ά���������������ѧ�����о�����[J]. �ִ��������, 2019,56(3): 1-7
[2] �����.������ߵ�Ӧ�����¶���ȺΧ���ƻ�����Ӧ�Դ�ʩ�о�[J]. �ִ��������, 2019,56(3): 8-17
[3] ԭ�ȷ� 1 �� �� 2.���� GOCAD�� TRT���Գɹ����뷽���о�[J]. �ִ��������, 2019,56(3): 18-24
[4] ��С�� 1 �̽��� 2 ���̿� 2.�ɶ�������Ȫɽ�����˹��������������Ԥ������[J]. �ִ��������, 2019,56(3): 25-30
[5] �� �� 1,2 ף־�� 2 ������ 2 ������ 2 �κ鲨 1.����ȫ��չ��ͼ������������©ˮ���ֻ�ʶ�𷽷���[J]. �ִ��������, 2019,56(3): 31-37
[6] ������ 1,2.�ϳ���˫���� TBM�������̳ﻮ�����о�[J]. �ִ��������, 2019,56(3): 38-44
[7] �Ž�ΰ 1 ��־�� 1 ·��Ȫ 2 ��־ΰ 2.���й����ͨ����BIM����Ӧ���ƹ�ʵʩ�����о�[J]. �ִ��������, 2019,56(3): 45-52
[8] Ѧ �� �� ��.����PSO-BP������ij����ۺϹ��Ⱦ�����̬����ָ����ϵ[J]. �ִ��������, 2019,56(3): 53-58
[9] ������ �� �� �� ��.���������������ĵ���Ѳ����Ϣ��ϵͳ����[J]. �ִ��������, 2019,56(3): 59-64
[10] ��ǿǿ 1 ����ɽ 1,2 ����˧ 3 ����ƽ 2.����Եر���𶯷Ŵ����õ��о�[J]. �ִ��������, 2019,56(3): 65-71
[11] ����� 1,2 ���»� 1.ǿ��������֧��-�ṹһ�廯��ĻԤ�Ʒ�������վ������Ӧ�о�[J]. �ִ��������, 2019,56(3): 72-78
[12] ׿ �� 1 �� ʢ 1 �� �� 2 �� �� 3 ����� 1 �� �� 4.����ʽ����������������ṹ�������Լ���������о�[J]. �ִ��������, 2019,56(3): 79-87
[13] �� �� �ܻ��� л�ѻ�.б���ܹ���ͷ�����������о�[J]. �ִ��������, 2019,56(3): 88-94
[14] ��ѩ�� 1 ���²� 2 ����Ȼ 1 ̷־�� 2 ��־ǿ 2 �Ż��� 2.���������ز㶥�ܶ����������о�[J]. �ִ��������, 2019,56(3): 95-101
[15] �� �� 1 �� �� 2 ����� 2,3 �� ƽ 4.����ǻز�����ɶ�Ȧ֧���Ż�[J]. �ִ��������, 2019,56(3): 102-108
Copyright 2010 by �ִ��������