超大直径泥水式盾构施工地层变形规律研究
(1 北京交通大学隧道及地下工程教育部工程研究中心, 北京 100044; 2 北京城建集团有限责任公司, 北京100088; 3 北京城建设计发展集团股份有限公司, 北京 100037; 4 中交公路规划设计院有限公司, 北京100088)
Characteristics of Ground Deformation Induced by Large-Diameter Slurry Shield Construction
(1 Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044; 2Beijing Urban Construction Group Co. Ltd., Beijing 100088; 3 Beijing Urban Construction Design & Development Group Co. Ltd.,Beijing 100037; 4 CCCC Highway Consultants Co. Ltd., Beijing 100088)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  文章以南京市纬三路过江通道大直径双线盾构 (?14.5 m) 工程为背景, 结合现场监测数据, 对超大直径泥水式盾构在砂、 砂卵石地层中掘进引起的地表变形过程和分布规律进行分析。研究结果表明: 盾构隧道地表纵向变形分为四个不同阶段, 分别为隆起、 快速沉降、 缓慢沉降和最后稳定阶段; 单线隧道施工地表变形可用 Peck公式描述, 拟合得到Vl值平均为1.856%, K值平均为0.423, 整体呈现单峰状; 双线隧道施工地表变形呈不对称双峰状,这是因为后建隧道的施工增加了地表最大沉降值以及沉降槽宽度, 进而改变了沉降槽的形状; 双线隧道施工地表变形可用双Peck公式进行描述, K值与隧道数量、 施工历史情况无明显关联, Vl值与施工方法、 质量控制及双线隧道施工顺序有关。研究结果可为类似工程提供指导及参考。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: Based on the large-diameter (?14.5 m) double-tube river-passing shield tunnel at Weisalu of Nanjing city and on-site monitoring data acquired there, the process and distribution law of surface deformation induced by the construction of a large-diameter slurry shield in sand and sandy cobble strata was studied. The results indicate that vertical surface deformation of the shield tunnel includes four stages: heaving, rapid settlement, slow settlement and stabilization. Surface deformation of single-tube tunnel construction can be described by the Peck formula, with an average Vl value of 1.856% and K value of 0.423 by fitting a unimodel shape; Surface deformation of the doubletube tunnel is of a bimodal asymmetrical shape since the later tunnel construction causes the maximum surface settlement and the trough width to increase, thus the trough shape is changed. Surface deformation of the double-line tunnel can be described by a double Peck formula, and there is no obvious correlation between the K value and the number of tunnels and the construction history, and the Vl value is related to the construction method, quality management and construction procedure.
KeywordsShield construction,   Ground deformation,   Peck formula     
基金资助:基金项目: 国家自然科学基金 “面上” 项目 (51678035); 基本科研业务费项目 (2016JBZ009) .
作者简介: 作者简介: 房 倩(1983-), 男, 副教授, 博士, 主要从事隧道工程方面的研究工作, E-mail: qfang@bjtu.edu.cn.
引用本文:   
.超大直径泥水式盾构施工地层变形规律研究[J]  现代隧道技术, 2017,V54(3): 120-125
.Characteristics of Ground Deformation Induced by Large-Diameter Slurry Shield Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(3): 120-125
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2017/V54/I3/120
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104
Copyright 2010 by 现代隧道技术