高压富水碎裂状岩层小半径曲线盾构隧道施工技术
(1 北京工业大学北京城市交通协同创新中心,北京 100124;2中铁十七局集团第六工程有限公司, 福州 350014 )
Construction Techniques for the Small-radius Curved Shield Tunnels in Water-rich Fractured Stratum with High Pressure
(1 Beijing Collaborative Innovation Center for Metropolitan Transportation, Beijing University of Technology, Beijing 100124; 2 The 6th Engineering Co., Ltd. of China Railway 17th Bureau Group Co., Ltd., Fuzhou 350014)
Download: PDF (2019KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 在不良岩土工程条件下,盾构施工将会遇到刀具切削效果差、掘进参数设置不合理以及喷涌等技术难题。文章针对福州地铁高压富水、碎裂状岩层和长距离小半径曲线等施工难点,通过对滚刀切削力的理论计算,分析了刀具的力学性能,提出了合理的刀具配置、掘进参数和刀具更换时机;通过实践探索,采用了螺旋输送机改造、出碴控制和地面降水相结合的防喷涌措施;通过数值模拟方法分析了小半径曲线段盾构掘进开挖面稳定情况,并总结出了长距离小半径曲线段盾构掘进以及姿态控制措施。结果表明:(1)盾构机在碎裂状岩层中掘进时,岩块对于刀具的侧向冲击力很大,需对滚刀采取加固措施;(2)在总推力上升4 000~7 000 kN、扭矩上升1 000~1 500 kN·m、掘进速度小于 10 mm/min时,应结合碴样情况,考虑在合适的时机进行换刀;(3)采用所研发的螺旋输送机防喷涌装置,结合地面降水和出碴控制措施,可有效减少喷涌的发生;(4)本工程盾构机在小半径曲线上长距离掘进过程中,轴线最大偏移量、管片安装高程偏差均满足盾构施工规范要求。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: A variety of construction problems, such as bad cutting effects of cutters, unreasonable boring parame? ters and blowout, are often encountered during shield tunnelling under unfavorable geological conditions. Aimed at these construction difficulties of high pressure, abundant underground water, fractured rock stratum, long distance and small-radius curves of Fuzhou metro, the mechanical behaviors of cutting tools were analyzed through theoretical calculations of cutter cutting force, then the reasonable cutter configuration, tunneling parameters and the proper time for cutter replacement were presented. Some measures, such as screw conveyor renovation, mucking control and lowering of groundwater, were adopted for controlling blowout based on practice. The stability of excavation face was analyzed by numerical simulation, and the measures for shield boring and posture control in the long distance and small radius curved tunnels were summarized. The conclusions are as follows: 1) when shield machine is driven in fractured stratum, the effect of lateral impact force produced by spalling rock on cutter will be very large and reinforcement is needed for cutter; 2) cutter replacement should be taken at proper time based on muck samples in conditions of increasing of total shield thrust by 4 000-7 000 kN, cutter torque by 1 000-1 500 kN·m and driving speed smaller than 10 mm/min; 3) adopting screw conveyor device with innovative anti-blowout devices and control measures for ground precipitation and mucking, it controls blowout effectively; 4) the maximum axis offset and the height offset of segment meet the requirements of shield construction specifications during shield construction of long distance small-radius curved tunnel.
KeywordsShield machine;Fractured stratum,   High-pressure and abundant underground water;Small-radius curved tunnel;Configuration of cutting tools,   Replacement of cutting tools,   Driving parameters,   Innovation of screw conveyor,   Blowout     
基金资助:

基金项目:国家科技支撑计划子课题(2013BAB10B01-05);国家自然科学基金资助项目(51738010)

作者简介: 作者简介:张明聚(1962-),男,博士,教授,主要从事城市地下工程科研工作,E-mail:Zhangmj@bjut.edu.cn. 通讯作者:张振波(1990-),男,博士研究生,主要从事地下结构及岩土工程科研工作,E-mail:zzb759619047@126.com.
引用本文:   
.高压富水碎裂状岩层小半径曲线盾构隧道施工技术[J]  现代隧道技术, 2018,V55(6): 197-203
.Construction Techniques for the Small-radius Curved Shield Tunnels in Water-rich Fractured Stratum with High Pressure[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(6): 197-203
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I6/197
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术