[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2020, Vol. 57 Issue (2) :176-183    DOI:
施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
百丈隧道穿越流塑状富水破碎带施工措施及其安全性评价
(1四川省交通运输厅公路规划勘察设计研究院,成都 610041;2西南交通大学交通隧道工程教育部重点实验室,成都 610031)
Engineering Measures and Safety Evaluation of Baizhang Tunnel Passing through Flow Plastic Water-rich Fracture Zone
(1 Sichuan Highway Planning Survey, Design and Research Institute Ltd., Chengdu 610041; 2 Southwest Jiaotong University,MOE Key Laboratory of Transportation Tunnel Engineering, Chengdu 610031)
Download: PDF (2777KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 百丈隧道左洞ZK152+433~ZK152+463段穿越流塑状富水破碎带施工时反复出现变形侵限、塌方等情况,给工程施工带来前所未有的挑战。文章详细阐述了施工过程中采取的各种处治措施,总结了不同处治方案和效果,并采用数值分析方法对隧道结构安全性进行了分析。结果表明:(1)对于流塑状富水破碎带,加密超前支护是防止开挖时围岩出现较大变形或者坍塌的最有效措施。百丈隧道流塑状富水破碎带最终采用了每榀钢架(钢架间距50 cm)都打设一环3.5 m长?51自进式锚杆的超前支护方式,即每个断面都有7层超前支护,最终有效控制了开挖后围岩变形,避免衬砌侵限与塌方;(2)对于流塑状富水破碎带,加固围岩尤其是边墙与基底处围岩非常重要,可有效减少开挖过程中衬砌的整体式下沉。采用抛石挤淤+注浆的方式进行边墙与基底围岩加固,其效果比采用单纯注浆方式好得多;(3)对于外部荷载较明确的隧道,采用计算分析结合工程经验的方式确定衬砌支护参数,既能保证隧道结构安全,又使其经济合理;(4)在双车道隧道施工中,采用三台阶法施工,应尽量缩短台阶长度,使初期支护及时封闭成环,从而可以较好地控制围岩变形。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
田志宇 1 田尚志 1 杨 枫 1 张兆杰 1 汪 波 2
关键词:   
Abstract: Collapse and clearance invasion events occurred repeatedly during the construction at the section of ZK152+433-ZK152+463 of left tube of Baizhang tunnel passing through a flow-plastic fracture zone with abundant water, which brought unprecedented challenges to the engineers. The various measures adopted in the construction are described in detail, and an analysis on structure safety is conducted by numerical method. The results show that:(1) as for the flow-plastic water-rich fracture zone, dense advance support is the most effective measure to prevent large deformation or collapse of surrounding rocks during excavation, a ring of ?51 self-drilling anchor bolts with unit length of 3.5 m are installed between steel arches (with the steel arch interval of 50 cm), that is to say there are 7 layers of advance support for each tunnel section, effectively controlling the rock mass deformation after excavation, avoiding collapse and clearance invasion of tunnel lining; (2) it is significant to reinforce the surrounding rocks,especially at sidewall and tunnel floor, since it can effectively decrease the integral subsidence of tunnel lining during construction. A combination of jackstone treatment and grouting is adopted to reinforce the surrounding rocks at sidewall and tunnel floor and the effect is much better than that only with grouting; (3) as for the tunnel with explicit external load, the parameters of lining support should be determined by both calculation analysis and engineering experience, which will guarantee the safety of tunnel structure and also make it economical and reasonable; (4) as for the two-lane tunnel, three-bench method is taken and the bench length should be shortened as much as possible in order to form an enclosure of primary support in time so as to control the deformation of surrounding rocks better.
KeywordsTunnel,   Flow-plastic water-rich fracture zone,   Clearance invasion,   Collapse,   Treatment measure,   Nu? merical analysis,   Experience summarization     
基金资助:基金项目:四川省交通科技项目(2013C10-3);国家自然科学基金项目(NO.51804261;NO.51378434;NO.51578456);四川省科技计划项目(19YYJC0413).
作者简介: 作者简介:田志宇(1981-),男,硕士,高级工程师,主要从事隧道与地下工程的设计与研究工作,E-mail: 76453607@qq.com.
引用本文:   
田志宇 1 田尚志 1 杨 枫 1 张兆杰 1 汪 波 2 .百丈隧道穿越流塑状富水破碎带施工措施及其安全性评价[J]  现代隧道技术, 2020,V57(2): 176-183
TIAN Zhiyu1 TIAN Shangzhi1 YANG Feng1 ZHANG Zhaojie1 WANG Bo2 .Engineering Measures and Safety Evaluation of Baizhang Tunnel Passing through Flow Plastic Water-rich Fracture Zone[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(2): 176-183
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I2/176
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术