沉管隧道混凝土路面沥青保护层关键性能研究
(1重庆市智翔铺道技术工程有限公司,重庆 400060;2 邯郸市交通运输局公路勘察设计院,邯郸 056004;3 港珠澳大桥管理局,珠海 519060)
Research on the Key Performances of Asphalt Protection Layer for the Concrete Pavement of the Immersed Tunnel
(1 Chongqing Zhixiang Paving Technology Engineering Co., Ltd., Chongqing 400060;2 Highway Survey and Design Institute of Transportation Bureau of Handan City, Handan 056004;3 Hong Kong-Zhuhai-Macao Bridge Authority, Zhuhai 519060)
Download: PDF (4077KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为满足沉管隧道混凝土铺装路面的特殊要求,通过论证分析,设计了AC-10+沥青卷材、GA-10+环氧树脂撒砂和AC-10+应力吸收层3种沥青保护层结构,并针对3种沥青保护层结果的层间粘结性能、抗反射裂缝性能、防水性能和抗水损坏性能进行室内试验。结果表明,前2种方案的常温层间拉拔强度相接近,分别达到2.15MPa 和 2.20 MPa,远高于第 3 种方案的 0.7 MPa,3 种方案的常温层间剪切强度分别达到 0.565 MPa0.145 MPa 和0.745 MPa;采用Overlay tester系统进行抗反射裂缝性能试验,3种方案的疲劳寿命分别为4 587次、5 649次和2 856次;3种方案的渗水系数均较小,其中第2种方案渗水系数接近于0 mL/min;GA-10的抗水损坏性能优于AC-10。因此,GA-10+环氧树脂撒砂结构综合性能最优,可作为沉管隧道混凝土路面沥青保护层方案。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
赵国云 1 吴卫华 2 李书亮 3
关键词:   
Abstract: In order to meet the special requirements for asphalt protection layer of immersed tunnel concrete pave? ment, three kinds of asphalt protection layer of AC-10+asphalt roll, GA-10+epoxy resin with sand and AC-10+ stress absorbing layer are designed, and laboratory tests on the bonding performance between layers, performances of reflective cracking resistance, waterproofing and water damage resistance are conducted based on demonstration and analysis. The results show that the pull strengths between layers under normal temperature of the former two design schemes reach 2.15 MPa and 2.20 MPa respectively, being much higher than that of the third design scheme;the shear strengths between layers under normal temperature of the three design schemes reach 0.565 MPa, 0.145 MPa and 0.745 MPa respectively; the fatigue lives of the three design schemes are 4 587 times, 5 649 times and 2856 times given by reflective cracking resistance performance test using Overlay tester system; water permeability coefficients of the three design schemes are all relatively small and the water permeability coefficient of the second scheme is close to 0 mL/min; water damage resistance performance of GA-10 is better than that of AC-10. It is concluded that the design scheme of GA-10+epoxy resin with sand has the best performance and can be considered as the preferred scheme of asphalt protection layer for the immersed tunnel.
KeywordsImmersed tunnel;Asphalt protection layer;Laboratory test,   Bonding capacity between layers;Reflect? ing cracking resistance performance;Waterproofing performance;Water damage resistance performance     
基金资助:基金项目:广东省交通科技项目(科技-2017-02-016);重庆市科技项目(cstc2018jscx-msybX0300)
作者简介: 作者简介:赵国云(1977-),男,硕士,教授级高级工程师,主要从事沥青路面研究工作,E-mail:lynn5@163.com.
引用本文:   
赵国云 1 吴卫华 2 李书亮 3 .沉管隧道混凝土路面沥青保护层关键性能研究[J]  现代隧道技术, 2020,V57(6): 142-148
ZHAO Guoyun1 WU Weihua2 LI Shuliang3 .Research on the Key Performances of Asphalt Protection Layer for the Concrete Pavement of the Immersed Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(6): 142-148
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I6/142
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181