[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (1) :117-126    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
富水地层盾构管廊工程岩土体参数反演与掌子面稳定性分析
(1 沈阳工业大学建筑与土木工程学院,沈阳 110870;2 兰州理工大学甘肃省土木工程防灾减灾重点实验室,兰州 730050;3 中铁十九局集团第五工程有限公司,大连 116100)
Soil Parameters Inversion and Working Face Stability Analysis for a Shielddriven Utility Tunnel in Water-rich Strata
(1 School of Architecture and Civil Engineering, Shenyang University of Technology, Shenyang 110870; 2 Key Laboratory of Disaster Prevention and Mitigation in Civil Engineering of Gansu Province, Lanzhou University of Technology, Lanzhou 730050; 3 The Fifth Engineering Co., Ltd, China Railway 19th Bureau Group, Dalian 116100)
Download: PDF (4477KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章以沈阳富水地层盾构管廊工程为研究背景,对土压平衡盾构开挖引起的地表竖向位移和水平位移进行监测,并分析位移的变化规律。以现场测量得到的位移监测值为基础,基于粒子群优化的BP神经网络算法建立PSO-BP参数反演分析方法,利用Fortran语言编制位移反分析程序,并采用正交设计和ABAQUS数值计算进行参数反演。考虑静止土压力、主动土压力和被动土压力对掌子面稳定性的影响,根据反演的参数对盾构廊道掌子面的支护压力进行分析。研究结果表明:所建立的PSO-BP参数反演分析方法是一种可行、有效的反分析方法。当支护压力比λ =0.4时,掌子面处于极限状态;随着支护压力比的减小,地表沉降呈增大趋势。当考虑地下水作用时,为了保证掌子面的稳定需要增加支护压力;当支护压力比λ =0.6时,掌子面处于极限状态。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王军祥 1 徐晨晖 1 董建华 2 陈四利 1 寇海军 3 王 鑫 1
关键词:   
Abstract: Taking the Shenyang utility tunnel project in water-rich strata as the research background, which is ex? cavated by a EPB shield machine, the vertical displacement and horizontal displacement of the ground surface caused by the EPB shield tunnelling are monitored, and the displacement development law is analyzed. According to the actual measured displacement data, the PSO-BP parameter inversion analysis method is established based on the particle swarm optimization algorithm. The displacement inverse analysis program is compiled using Fortran language, and the parameter inversion is performed using orthogonal design and ABAQUS numerical calculation method. Considering the effects of static earth pressure, active earth pressure and passive earth pressure on the working face stability, the limit supporting pressure on the shield-driven utility tunnel face is analyzed according to the inversed soil parameters. The results show that the PSO-BP parameter inversion analysis method is a feasible and effective method. When the supporting pressure ratio is 0.4, the working face is in the limit state; and with the decrease of the supporting pressure ratio, the ground surface settlement maintains an increase trend. When the effect of groundwater is considered, larger supporting pressure should be needed to ensure the stability of the working face;and the working face is in the limit stat when the supporting pressure ratio is 0.6.
KeywordsUtility tunnel,   EPB shield,   PSO-BP algorithm,   Parameter inversion,   Back analysis of displacement,   Support pressure     
基金资助:基金项目:国家自然科学基金项目(51608332,51774066);辽宁省自然科学基金项目(2019-MS-242);辽宁省教育厅重点攻关项目(LZGD2020004);中国博士后科学基金(2018M630293).
作者简介: 作者简介:王军祥(1985-),男,博士,副教授,博士生导师,主要从事隧道及地下工程灾害预警及防治机理方面的研究工作,E-mail: w.j.xgood@163.com.
引用本文:   
王军祥 1 徐晨晖 1 董建华 2 陈四利 1 寇海军 3 王 鑫 1 .富水地层盾构管廊工程岩土体参数反演与掌子面稳定性分析[J]  现代隧道技术, 2021,V58(1): 117-126
WANG Junxiang1 XU Chenhui1 DONG Jianhua2 CHEN Sili1 KOU Haijun3 WANG Xin1 .Soil Parameters Inversion and Working Face Stability Analysis for a Shielddriven Utility Tunnel in Water-rich Strata[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(1): 117-126
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I1/117
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术