[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (2) :111-117    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
浅埋暗挖软岩隧道管棚预注浆加固效果分析
(1 内蒙古交通职业技术学院,赤峰 024000;2 长安大学公路学院,西安 710064)
Analysis on Pre-grouting Reinforcement Effect of Pipe Roofs for the Shallowburied Mined Tunnel in Soft Rocks
(1 Inner Mongolia Vocational and Technical College of Communications, Chifeng 024000; 2 College of Highway, Chang′an University,Xi′an 710064)
Download: PDF (3747KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究浅埋破碎软岩隧道采用管棚预注浆超前支护后的加固效果,以某隧道工程为依托,采用MI?DAS/GTS有限元软件,建立了管棚预注浆超前支护、仅采用管棚支护以及无任何超前支护作用下的三种开挖模型并进行了数值模拟分析。结果表明:管棚预注浆超前支护措施在隧道拱顶上部形成加固带,承受了隧道拟开挖区域大部分的围岩荷载,改善了地层成拱能力,有效控制了地表下沉、拱顶沉降和应力集中现象,使地表下沉减小52.7%,拱顶沉降减小58.9%,拱脚收敛减小61.4%,仰拱隆起减小63.8%,竖向应力减小79.2%。管棚支护显著支承隧道上覆围岩压力,有效减小衬砌弯矩,阻止喷射混凝土的开裂破坏,降低土层变形过程中锚杆所承受的拉力;且相比于管棚预注浆超前支护,仅采用管棚支护对控制隧道边墙收敛及隧道仰拱隆起的效果同样显著。对于该软弱破碎围岩浅埋暗挖隧道下穿既有重要管线的施工,采取管棚加预注浆超前支护手段,确保了工程安全顺利进行,研究结果可为类似工程提供一定参考。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
岳洪武 1 苗 苗 2
关键词:   
Abstract: In order to study the pre-grouting reinforcement effect of the pipe roof support for the shallow-buried mined tunnel in broken soft rocks, taking a certain tunnel project as the background, the MIDAS/GTS finite element software is adopted to establish three excavation models: pipe roof support with pre-grouting, single pipe-roof support and no pre-support, and then numerical simulation analysis is carried out accordingly. The results show that taking the pipe-roof pre-grouting measures, a reinforcement zone could be formed above the tunnel vault, which can bear most loads of the surrounding rocks in the area to be excavated, improve the arching ability of the ground, effectively control the surface subsidence, vault subsidence and stress concentration, and reduce surface subsidence by 52.7%, vault subsidence by 58.9%, arch foot convergence by 61.4%, invert heave by 63.8% and vertical stress by 79.2%. The pipe-roof support can significantly bear the pressure of overlying rocks, effectively decrease the bending moment of the lining, prevent the shotcrete from cracking failure and reduce the tensile force of the anchor bolt during the soil layer deformation; moreover, compared with the pipe-roof pre-grouting support, the single pipe-roof support has the same significant effect on controlling the convergence of side walls and invert heaving of the tunnel.For a shallow-buried tunnel underneath the existing important pipelines in weak and broken rocks, the pipe-roof pre-grouting support method could be adopted to ensure safe and smooth progress of the project, providing a certain reference for similar projects.
KeywordsTunneling,   Broken soft rock,   Pipe roof support,   Pre-grouting reinforcement,   Numerical analysis     
基金资助:基金项目:自然资源部地质信息技术重点实验室开放课题资助项目(项目编号:663)
作者简介: 作者简介:岳洪武(1983-),男,讲师,主要从事岩土与隧道工程教学及科研工作,E-mail:1103455479@qq.com. 通讯作者:苗 苗(1996-),男,硕士研究生,主要从事岩土与隧道工程研究工作,E-mail:1172304722@qq.com.
引用本文:   
岳洪武 1 苗 苗 2 .浅埋暗挖软岩隧道管棚预注浆加固效果分析[J]  现代隧道技术, 2021,V58(2): 111-117
YUE Hongwu1 MIAO Miao2 .Analysis on Pre-grouting Reinforcement Effect of Pipe Roofs for the Shallowburied Mined Tunnel in Soft Rocks[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 111-117
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I2/111
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术