现代隧道技术 2021, Vol. 58 Issue (3) :52-59    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
一种基于半空间扫描测量模式的隧道坍腔地质雷达三维成像技术
(1昭通市昭泸高速公路投资开发有限公司,昭通 657000;2云南航天工程物探检测股份有限公司,昆明 650217;3云南省交通运输厅工程质量监督局,昆明 650214;4云南交投集团运营管理有限公司,昆明 650228)
A 3D GPR Imaging Technique of Tunnel Cavities Based on the Half-space Scanning Measurement Mode
(1 Zhaotong Zhaolu Expressway Investment and Development Co., Ltd., Zhaotong 657000; 2 Yuannan Aerospace Engineering Geophysical Detecting Co., Ltd., Kunming 650217; 3 Yunnan Provincial Bureau of Transportation and Transportation Engineering Quality Supervision Bureau, Kunming 650214; 4 YCIC Operation Management Co., Ltd., Kunming 650228)
Download: PDF (3489KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 地质雷达作为一种高效、无损的地球物理探测手段,被广泛应用于隧道地质灾害尤其是隧道坍腔的探测中。由于受环境条件的制约,目前隧道中地质雷达探测方式多以二维反射剖面为主,存在空间探测范围局限性较大的问题。为了在尽量不增加工作量、不降低数据采集效率的前提下,尽可能的提高地质雷达的空间探测范围,文章提出了一种基于半空间扫描测量的探测模式,通过对三维数据体的反演实现了隧道掌子面半空间区域30 m范围内的全方位3D成像。通过基于CPML吸收边界条件的三维FDTD数值模拟分析以及对接收信号的频谱分析,验证了该方法的有效性。将该方法应用于河北省荣成—乌海高速公路营尔岭隧道右洞坍腔检测中,成功探测到里程K103+607~K103+567区域内隧道顶部的坍腔危害。此外,将三维地质雷达探测结论与三维地震地质超前预报结果进行交叉验证,吻合效果良好。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
邓海明 1 杨 曦 2 李志山 3 雷红仙 4 唐 侃 1 范明外 2 张寒韬 2 黄 萍 4
关键词:   
Abstract: As an efficient and non-destructive geophysical detection tool, ground penetrating radar (GPR) is wide? ly used in the detection of tunnel geological hazards, especially tunnel cavities. Due to the constraints of environmental conditions, the current GPR measurement methods used in tunnelling are mostly based on 2D reflection profiles,which results in the problem of large limitations on the spatial detection range. In order to improve the spatial detection range of GPR as much as possible without increasing the workload or reducing the efficiency of data acquisition,this paper proposes a detection mode based on half-space scanning measurement, by which it achieves the omnibearing 3D imaging within 30 m range of the half-space area of the tunnel face by the inversion of 3D data volume.The proposed method is verified by 3D FDTD numerical simulation analysis based on CPML absorbing boundary conditions and by spectral analysis on the received signals. The method is applied to the detection of cavities in the right tube of Ying'erling tunnel of Rongcheng-Wuhai Expressway in Hebei Province, successfully detecting the cavity hazards at the top of the tunnel from K103+607 to K103+567. In addition, the 3D GPR detection results are cross-validated with the 3D seismic geology prediction results, with good consistency.
KeywordsHalf-space scanning measurement,   GPR,   3D imaging,   tunnel cavity,   3D FDTD     
基金资助:云南省交通运输厅科技创新示范项目(云交科教便[2020]53).
作者简介: 邓海明(1973-),男,高级工程师,主要从事公路工程地质勘察研究工作,E-mail:380415912@qq.com. 通讯作者:杨 曦(1982-),男,工程师,主要从事地球物理勘探数据正反演研究工作,E-mail:yxkm169@163.com.
引用本文:   
邓海明 1 杨 曦 2 李志山 3 雷红仙 4 唐 侃 1 范明外 2 张寒韬 2 黄 萍 4 .一种基于半空间扫描测量模式的隧道坍腔地质雷达三维成像技术[J]  现代隧道技术, 2021,V58(3): 52-59
DENG Haiming1 YANG Xi2 LI Zhishan3 LEI Hongxian4 TANG Kan1 FAN Mingwai2 ZHANG Hantao2 .A 3D GPR Imaging Technique of Tunnel Cavities Based on the Half-space Scanning Measurement Mode[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(3): 52-59
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I3/52
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术