双线盾构隧道近接下穿既有隧道结构沉降变形与施工节点控制分析
(北京市地铁运营有限公司,北京 100044)
Analysis of Settlement Deformation and Construction Node Control of a Double-Line Shield Tunnelling Passing under Existing Tunnel in Close Distance
(Beijing Mass Transit Railway Operation Corporation Limited, Beijing 100044)
Download: PDF (5105KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 城市新建地铁隧道穿越引起既有隧道变形的规律是工程领域研究的热点。文章依托某新建盾构隧道近接下穿既有盾构隧道工程,对施工全过程的实测数据进行整理,结合数值模型计算结果,重点分析了新建左、右线依次穿越过程中既有双线隧道沉降变形规律,进一步对阶段受扰动土体稳定性进行分析。结果表明:(1)时间维度上,穿越过程中既有结构竖向变形趋势与施工阶段具有一一对应关系;(2)距离维度上,隧道结构变形随着距穿越中心距离减小而增大,规律与模拟结果一致;(3)根据既有隧道变形量及变形速率,穿越开始阶段可作为沉降控制的关键节点;(4)既有隧道穿越中心区域沉降量远小于模拟值,实际沉降变形实现重新分布,验证了施工关键节点控制的有效性和结论的准确性。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
高利宏
关键词:   
Abstract: The deformation pattern of existing tunnels caused by the crossing construction of new urban rail proj? ects is a popular research topic in the engineering field. Based on a new shield tunnel passing under an existing one in close distance, this paper collates the actual measured data during the whole construction process. And in combination with the calculation results of the numerical model, it mainly analyzes the settlement deformation pattern of the existing double-line tunnel during the crossing construction process of the new left and right line tunnel tubes in turn, and further analyzes the stability of the disturbed soils in each construction stage. The results show that: (1)from the time dimension, there is a one-to-one correspondence between the vertical deformation trend of the existing structure and the construction stage during the crossing process; (2) from the distance dimension, the deformation of the tunnel structure increases as the distance from the crossing center decreases, and the pattern is consistent with the simulation results; (3) based on the amount and rate of deformations in the existing tunnel, the start stage of the crossing construction can be taken as a key node for controlling the settlement; (4) the settlement of the center area crossing the existing tunnel is much smaller than the simulated value, with achieving the actual redistribution of the settlement deformation, which verifies the effectiveness of construction key node control and the accuracy of the conclusions.
KeywordsDouble-line shield tunnel,   Crossing under existing tunnel in close distance,   Settlement deformation pattern,   Construction control,   Numerical simulation     
作者简介: 高利宏(1984-),男,硕士,工程师,主要从事地铁建设及运营的安全管理工作,E-mail:1427179970@qq.com.
引用本文:   
高利宏 .双线盾构隧道近接下穿既有隧道结构沉降变形与施工节点控制分析[J]  现代隧道技术, 2021,V58(4): 194-202
GAO Lihong .Analysis of Settlement Deformation and Construction Node Control of a Double-Line Shield Tunnelling Passing under Existing Tunnel in Close Distance[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 194-202
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I4/194
 
没有本文参考文献
[1] 王志杰 1 李金宜 1 蒋新政 1 李 振 1 曾 青 2 王 宁 2.浅埋偏压双侧近接隧道影响分区及对策研究[J]. 现代隧道技术, 2021,58(4): 1-11
[2] 王文娟 高 鑫.高水压作用下深埋隧道双层叠合衬砌稳定性影响因素研究[J]. 现代隧道技术, 2021,58(4): 12-20
[3] 于 丽 1,2 孙 源 1,2 王明年 1,2.寒区隧道抗冻设防长度的计算方法研究[J]. 现代隧道技术, 2021,58(4): 21-28
[4] 秦尚友 1 陈佳耀 2 张东明 2 杨同军 1 黄宏伟 2 赵 帅 2.基于深度学习的隧道工作面岩石结构自动化判别[J]. 现代隧道技术, 2021,58(4): 29-36
[5] 李鹏举 1 郑方坤 2 吕建兵 3 吴维俊 3 刘 锋 3 陈贡发 3.基于大数据迁移学习的灰岩地区排水孔淤堵自动识别技术[J]. 现代隧道技术, 2021,58(4): 37-47
[6] 宋福彬 1 杨 杰 1 程 琳 1 吕 高 1, 2 宋 洋 1.地质雷达正演在隧洞衬砌病害识别中的应用[J]. 现代隧道技术, 2021,58(4): 48-56
[7] 翟 强 顾伟红 荆肇秦.地铁联络通道冻结法施工安全风险评价[J]. 现代隧道技术, 2021,58(4): 57-66
[8] 叶 飞 1 何 彪 1 田崇明 1 王思宇 1 王 坚 1 宋桂锋 2.三乙醇胺早强剂研究进展及在隧道工程中的应用展望[J]. 现代隧道技术, 2021,58(4): 67-78
[9] 谢 军 1,2 倪雅静 2 胡英飞 2 包淑贤 2 李延涛 1.振动台试验模型箱的研究进展[J]. 现代隧道技术, 2021,58(4): 79-85
[10] 惠 强 1 张 军 2 姜海波 1.深埋高地应力水工隧洞节理岩体开挖塑性区特征及分布规律研究[J]. 现代隧道技术, 2021,58(4): 86-94
[11] 张莉莉 1 郎松军 1 邓 林 2 臧 程 3.季冻区隧道砂岩三轴压缩力学特性及损伤本构模型研究[J]. 现代隧道技术, 2021,58(4): 95-103
[12] 李心熙 1 禹海涛 2 李春元 3 于晓东 4 徐 磊 5.沉管隧道暗埋段三维大规模地震响应分析[J]. 现代隧道技术, 2021,58(4): 104-108
[13] 冯 义.基于动荷载的交叠盾构隧道两阶段安全分析[J]. 现代隧道技术, 2021,58(4): 109-116
[14] 王 博 1 郑鹏飞 1 胡江洋 1 刘军勇 1 刘 硕 2.近距离平行盾构隧道施工数值模拟及影响因素分析[J]. 现代隧道技术, 2021,58(4): 117-124
[15] 张 宏 1,2 刘海洋 1,3.地铁隧道盾构掘进对上跨地道基坑稳定性影响研究[J]. 现代隧道技术, 2021,58(4): 125-132
Copyright 2010 by 现代隧道技术