[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (4) :21-28    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
寒区隧道抗冻设防长度的计算方法研究
(1 西南交通大学土木工程学院,成都 610031;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031)
Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions
(1 College of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (3151KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要      目前寒区隧道抗冻设防长度的设计多靠工程类比,且要求隧道内温度场已知。为了明确设计时设防长度选取标准,解决无实测洞内温度资料的问题,文章基于寒区隧道温度场理论求解方法,根据衬砌层不出现排水管冻结和围岩不发生冻胀两个条件,在调研资料分析和隧道围岩温度场数值分析的基础上,给出了衬砌层不出现冻害和围岩不出现冻害的临界洞内温度;分析了洞内通风和围岩条件对隧道洞内温度场的影响,获得了入口风温、断面面积、入口风速和初始岩温相关的隧道洞内温度回归公式;进而提出了一种寒区隧道抗冻设防长度的计算方法。以杀虎口隧道为例,计算得到其抗冻设防长度,并分析了风温及隧道断面面积对抗冻设防长度的影响。结果表明,设防长度分别随入口风温的降低、入口风速的升高和断面面积的增加而逐渐增大,随围岩温度的升高而逐渐减小。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
于 丽 1
2 孙 源 1
2 王明年 1
2
关键词:   
Abstract: At present the design of frost-resistance fortification lengths of tunnels in cold regions mainly relies on engineering analogies and requires the known temperature field inside the tunnel. In order to clarify the design criteria for the fortification length and to solve the problem of no actual temperature data in the tunnel, the critical temperatures in the tunnel are proposed under two preconditions of no freezing in the drainage pipe of the lining layer and no frost heave in the surrounding rocks, based on the theoretical solutions to temperature fields of tunnels in cold regions, as well as the investigation data analysis and numerical analysis of the temperature fields in tunnel surrounding rocks; the influence of tunnel ventilation and surrounding rock conditions on the temperature field in the tunnel is analyzed and a regression formula for calculating the temperature in the tunnel is obtained depending on the inlet wind temperature, section dimension, wind velocity and initial rock temperature; furthermore, a method for calculating the frost-resistance fortification length of tunnels in cold regions is put forward. Taking the Shahukou Tunnel as an example and using the calculated frost-resistance fortification length of the tunnel, the effects of wind temperature and tunnel section size on the frost-resistance fortification length are analyzed. The results show that the fortification length gradually increases as the inlet wind temperature decreases, the inlet wind velocity increases and the section size increases, and gradually decreases as the temperature of the surrounding rock increases, respectively.
KeywordsTunnel engineering,   Tunnels in cold regions,   Fortification length,   Temperature field,   Fortification stan? dard     
作者简介: 于 丽(1978-),女,博士,教授,主要从事隧道及地下工程研究工作,E-mail: 22643123@qq.com.
引用本文:   
于 丽 1, 2 孙 源 1, 2 王明年 1等 .寒区隧道抗冻设防长度的计算方法研究[J]  现代隧道技术, 2021,V58(4): 21-28
U Li1, 2 SUN Yuan1, 2 WANG Mingnian1 etc .Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 21-28
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I4/21
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术