豆砾石回填灌浆层缺陷的工程影响研究
(1黄河勘测规划设计研究院有限公司,郑州 450003;2 成都理工大学地质灾害防治与地质环境保护国家重点实验室,成都 610059)
Study on Engineering Influence of Defects in Pea Gravel Backfilling and Grouting Layer
(1 Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003; 2 State Key Laboratory of Geological Disaster Prevention and Geological Environment Protection, Chengdu University of Technology, Chengdu 610059)
Download: PDF (6226KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 豆砾石回填灌浆层是护盾式TBM施工隧洞衬砌体系的重要组成部分,研究豆砾石回填灌浆层中不同类型的施工缺陷对工程带来的影响具有理论价值和工程应用价值。文章以一双护盾TBM施工的引水隧洞为工程依托,归纳总结了豆砾石回填灌浆层中常见的缺陷类型及其分布规律;针对不同缺陷类型在不同工程条件下对管片应力及位移产生的影响,进行了系统的模拟分析。结果表明:常见的缺陷类型主要包括空洞、灌浆不密实、纯水泥以及灌浆体岩粉含量过高;空洞缺陷的影响最大,过程中应尽量做到满填满灌;管片竖向位移对施工缺陷比较敏感,有压隧洞中受内水压力作用,管片水平向和竖向位移差异减小;Ⅱ类围岩条件下各种缺陷的影响均较小,除空洞缺陷需要尽量避免外,其余缺陷的影响可忽略;Ⅳ类围岩对管片位移及受力起控制作用,同时会放大缺陷的影响效应,需要采取应对措施;内水压力与地质条件综合作用进一步放大了施工缺陷的影响,Ⅳ类围岩下管片的位移约为相应的Ⅱ类围岩条件下量值的2~3倍,其中空洞缺陷的影响效应尤为凸显。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张金良 1 黄秋香 2 汪雪英 1 胡 超 2 张少轩 2
关键词:   
Abstract: The pea gravel backfilling and grouting layer is an important part of the shield TBM tunnel lining system, and it is of great theoretical and practical significance in studying the impact of different defects in the pea gravel backfilling and grouting layer on construction works. In this paper, common defect types and its distribution law in the pea gravel backfilling and grouting layer are summarized on the basis of a diversion tunnel constructed by the double shield TBM. Then, the effects of different defect types on segment stress and displacement under different engineering conditions are systematically simulated and analyzed. The results show that common defect types mainly include cavity, non-dense grouting, plain cement and high rock powder content in cemented grouts; among others,cavity has the greatest impact, and the fully filling should be performed as much as possible; the vertical displacement of segments is sensitive to construction defects, the difference between horizontal and vertical displacements of segments might decrease under the action of internal water pressure in the pressurized tunnel; under the condition of Class Ⅱ surrounding rock, the influence of various defects is small, while that of other defects might be ignored ex? cept that cavity should be avoided as far as possible; in the Class Ⅳ surrounding rock the displacement and stress of segments are governed by the geological conditions, which would amplify the effect of defects, so that countermeasures should be taken accordingly; interaction of the internal water pressure and geological conditions would further amplify the influence of construction defects, the displacement of segments in Class Ⅳ surrounding rock is about 2~ 3 times of that in the Class Ⅱ surrounding rock, with especially prominent influence effect of cavity defect.
KeywordsShield TBM,   Pea gravel backfilling and grouting layer,   Segment lining,   Construction defects,   Hydraulic tunnel,   Cavity,   Non-dense grouting     
作者简介: 作者简介:张金良(1963-),男,博士,正高级工程师,研究员,博士生导师,主要从事洪水泥沙管理、水利水电工程设计等工作,E-mail:jizhangy? rec@126.com. 通讯作者:黄秋香(1980-),女,博士,副教授,主要从事岩土工程方面的教学与研究工作,E-mail:qiuxiang.huang@foxmail.com.
引用本文:   
张金良 1 黄秋香 2 汪雪英 1 胡 超 2 张少轩 2 .豆砾石回填灌浆层缺陷的工程影响研究[J]  现代隧道技术, 2021,V58(6): 163-172
ZHANG Jinliang1 HUANG Qiuxiang2 WANG Xueying1 HU Chao2 ZHANG Shaoxuan2 .Study on Engineering Influence of Defects in Pea Gravel Backfilling and Grouting Layer[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 163-172
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/163
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术