[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (6) :68-76    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法
(1 武汉工程大学兴发矿业学院,武汉 430074;2 武汉工程大学土木工程与建筑学院,武汉 430074;3 中南大学土木工程学院,长沙 410075)
Superposition Principle Based Numerical Estimation Method of Jacking Force of Vertical Curved Jacking Pipes with Large Rectangular Section
(1 Xingfa School of Mining Engineering, Wuhan Institute of Technology, Wuhan 430074; 2 School of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan 430074; 3 School of Civil Engineering, Central South University, Changsha 410075)
Download: PDF (2254KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 根据大尺寸矩形截面竖向曲线顶管的坡度,将顶管划分为几个区段,针对每个区段分别建立基于位移控制的有限元分析模型,通过设置起始边界条件,建立起各区段模型之间的力学联系。通过在不同的顶进位置对顶管起始截面施加一个管节宽度的位移得到顶管和围岩的应力场,进而计算每个区段模型各顶进位置的顶进力和侧阻力。将各区段对应数值模型计算得到的顶进力和侧阻力适当叠加,得到整个竖向曲线顶管顶进力与顶进距离的拟合关系。计算结果显示:对于浅埋顶管,顶管侧壁摩擦系数、管土接触范围与穿越土层的性质密切相关;对于砂性土层,减阻浆液容易漏浆、冒浆,顶管周围很难形成稳定的泥浆套,管土通常为全接触,侧壁摩擦系数可以取0.4。该计算条件下得到顶进力与顶进距离之间的拟合公式可以作为相同施工条件下浅埋竖向曲线矩形顶管顶进力的计算通式。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
肖尊群 1
2
3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1
关键词:   
Abstract: The jacking pipes are divided into several sections according to the slopes of vertical curved jacking pipes with large rectangular section. Based on the displacement control method, the finite element analysis model is established for each section, and the mechanical relationship among the models is set up by setting the initial boundary conditions. The stress field of jacking pipes and surrounding rocks is obtained by applying a displacement value as a pipe length to the initial section of pipe jacking at different jacking positions, and then the jacking force and lateral resistance at each jacking position in each model are calculated. The jacking force and lateral resistance calculated as per the corresponding numerical models are properly superimposed to obtain the fitting relationship between the jacking force and the jacking distance in the whole vertical curved pipe jacking. The calculation results show that the lateral friction coefficient and pipe-soil contact range during shallow pipe jacking are closely related to the properties of the soil layer. In the sandy soil layer, the resistance-reducing slurry is easy to leak and it is diffi? cult to form a stable mud screen around jacking pipes. In this context, the pipes are usually in full contact with soils,of which the lateral friction coefficient can reach 0.4. The fitting formula regarding the relationship between the jack?ing force and the jacking distance obtained under this calculation condition can be used as the general formula for calculating the jacking force of shallow-buried vertical-curved rectangular pipe jacking under the same construction conditions.
KeywordsRectangular pipe jacking,   Jacking force,   End resistance,   Lateral friction coefficient,   Displacement con? trol,   Finite element     
基金资助:基金项目:国家自然科学基金项目(51804222)
作者简介: 作者简介:肖尊群(1982-),男,博士,副教授,主要从事岩体力学、土动力学方面的研究工作,E-mail:547309418@qq.com. 通讯作者:许彩云(1986-),女,硕士,工程师,主要从事地下工程方面的研究工作,E-mail:350035863@qq.com.
引用本文:   
肖尊群 1, 2, 3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1 .基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法[J]  现代隧道技术, 2021,V58(6): 68-76
XIAO Zunqun1, 2, 3 CAO Tongtong1 XU Caiyun1 YANG Kai2 DONG Qiongying1 JIANG Yinan1 .Superposition Principle Based Numerical Estimation Method of Jacking Force of Vertical Curved Jacking Pipes with Large Rectangular Section[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 68-76
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/68
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术