[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2022, Vol. 59 Issue (2) :159-166    DOI:
试验与监测 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
岩溶隧道排水管结晶堵塞试验与数值模拟研究
1.中交路桥建设有限公司,北京 101100;2.河海大学地球科学与工程学院,南京 211100;3.南京水联天下海水淡化技术研究院,南京 210046;4. 南京大学地球科学与工程学院,南京 210046)
Experimental Study and Numerical Simulation of Crystallization-induced Blockage in Drainage Pipes in Karst Tunnels
1. CCCC Road and Bridge Construction Co., Ltd., Beijing 101100; 2. School of Earth Sciences and Engineering, Hohai University,Nanjing 211100; 3. Nanjing Aqua-World Institute of Seawater Desalination, Nanjing 210046; 4. School of Earth Sciences and Engineering, Nanjing University, Nanjing 210046)
Download: PDF (2769KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为实现岩溶区隧道排水系统堵塞过程的精准刻画和预警防控,开展了与现场1∶1等比例的排水系统堵管室内试验,探讨了仿真现场水动力、水化学和干湿循环条件下管道结晶沉淀量的变化规律,构建了考虑水动力和碳酸盐岩组分溶解-沉淀化学反应耦合驱动过程的数值模型,结合室内试验数据,对所建立的隧道排水管结晶堵塞模型进行验证。模拟结果表明,随着时间的推移,模拟值与试验观测值之间的误差逐渐减小,至15 d左右,二者拟合决定系数R2为0.67,证明在相对较长时间尺度下,所构建的数值模型在一定程度上能够较好地预测隧道排水管道内的结晶生成过程,模型能为隧道排水系统堵塞问题的防治提供理论指导,进而为岩溶隧道地质灾害的早期识别与安全评价提供保障
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
程咏春 1 曾祥纪 1 王振佳 1 王 栋 1 杨 蕴 2 吴咏敬 3 董 平 3
4
关键词公路隧道   数值模拟   排水系统   动网格   结晶堵塞     
Abstract: In order to realize the accurate description, early warning and control of the blockage process of the tun? nel drainage system in the karst area, the laboratory test on blockage in the drainage pipe system is carried out at the 1∶1 scale, and the variation law of the crystal precipitation is discussed under the conditions of field hydrodynamics,hydrochemistry and wetting-drying cycle. The numerical model of crystallization-induced blockage in tunnel drainage pipes in karst areas is constructed considering the coupled driving process of hydrodynamic force and dissolution-precipitation reaction of carbonate components, and is verified combined with the laboratory test data. The simulation results show that the error between the simulated values and the experimental observation values is gradually decreased as time goes by, and the determination coefficient of fitting (R2) reaches 0.67 at about 15 d, proving that the numerical model can predict the crystallization process in the tunnel drainage pipes in a relatively long time scale. The proposed model can provide theoretical guidance for the prevention and control of blockage in the tunneldrainage system, and further guarantee the early identification and safety assessment of geological hazards of karst tunnels.
KeywordsHighway tunnel,   Numerical simulation,   Drainage system,   Dynamic mesh,   Crystallization-induced block? age     
基金资助:国家重点研发计划(2019YFC1804304);河海大学中央高校基本科研业务费专项资金(B200202014)
作者简介: 程咏春(1976-),男,高级工程师,主要从事路桥施工技术工作,E-mail:1139384377@qq.com. 通讯作者:杨 蕴(1985-),男,博士,副教授,主要从事地下水数值模拟研究工作,E-mail:yy_hhu@hhu.edu.cn.
引用本文:   
程咏春 1 曾祥纪 1 王振佳 1 王 栋 1 杨 蕴 2 吴咏敬 3 董 平 3, 4 .岩溶隧道排水管结晶堵塞试验与数值模拟研究[J]  现代隧道技术, 2022,V59(2): 159-166
CHENG Yongchun1 ZENG Xiangji1 WANG Zhenjia1 WANG Dong1 YANG Yun2 WU Yongjing3 DONG Ping3, 4 .Experimental Study and Numerical Simulation of Crystallization-induced Blockage in Drainage Pipes in Karst Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 159-166
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I2/159
 
没有本文参考文献
[1] 石钰锋 1,2 曹成威 1,2 谈亦帆 3 徐长节 1,2,4 章立辰 5 黄 勇 5.地铁隧道基底饱水风化软岩动力响应及长期沉降研究[J]. 现代隧道技术, 2022,59(2): 86-95
[2] 张付军 1 胡 俊 2,3 段 宇 4 朱才辉 4.某富水断层隧道涌水治理方案优化分析及工程应用[J]. 现代隧道技术, 2022,59(2): 122-131
[3] 赵 威 1,2 张 科 1,2 郭 春 1,2.特长高速公路隧道通风斜井钢波纹板式中隔墙技术研究[J]. 现代隧道技术, 2022,59(2): 132-140
[4] 冯慧君.新建地铁隧道近距离下穿运营地铁线路施工及安全管控[J]. 现代隧道技术, 2022,59(2): 220-226
[5] 包逸帆 1,2 王明年 1,2 秦鹏程 1,2 陈湛文 1,2 韩常领 3 严 涛 1,2 陈劲宇 1,4.遮阳棚对隧道进出口明暗适应的影响规律研究[J]. 现代隧道技术, 2022,59(1): 111-117
[6] 丁小彬 韩东霖.运营盾构隧道不同椭圆度变形情况下受力性能分析[J]. 现代隧道技术, 2022,59(1): 141-148
[7] 崔光耀 1 蒋梦新 1 王明胜 2.高烈度地震区隧道洞口段纤维混凝土衬砌抗震效果分析[J]. 现代隧道技术, 2022,59(1): 207-213
[8] 唐浪洲 1,2 于 丽 1,2 王玉锁 1,2 汪主洪 1,2 王明年 1,2.走滑断层错动量大小对铁路隧道结构安全性影响的数值分析[J]. 现代隧道技术, 2022,59(1): 214-224
[9] 陈绍华.秦岭马白山隧道新型紧急救援站结构型式研究[J]. 现代隧道技术, 2022,59(1): 35-41
[10] 吴铭芳 春军伟.富水软岩隧道仰拱病害的综合处治与设计反思[J]. 现代隧道技术, 2021,58(6): 233-243
[11] 卢冠楠 1 王 鹏 1 杨 蕴 2 毛成君 3 吴咏敬 4 吴剑锋 3 董 平 3, 4 吴吉春 3.岩溶区隧道排水系统地下水渗流结晶堵塞机理及阻垢技术研究综述[J]. 现代隧道技术, 2021,58(6): 11-20
[12] 徐公允 1 徐汪豪 1,2 姚志刚 1 方 勇 1 刘四进 3.基于三维RBD-DEM耦合方法的贯入角度对滚刀冲击影响分析[J]. 现代隧道技术, 2021,58(6): 77-84
[13] 王英学 1 骆 阳 1 张子为 1 王国义 2 宋相帅 1.圆弧刀盘土压平衡盾构施工沉降影响分析[J]. 现代隧道技术, 2021,58(6): 155-162
[14] 周稳弟 1,2 梁庆国 1,2 张晋东 3.某地铁车站洞桩法施工变形和结构受力分析[J]. 现代隧道技术, 2021,58(6): 121-128
[15] 刘夏临 张 军 陈必光 刘尚各 舒 恒.盾构隧道下穿城市高架桥桩基预加固方案研究[J]. 现代隧道技术, 2021,58(6): 218-224
Copyright 2010 by 现代隧道技术