[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2022, Vol. 59 Issue (3) :118-127    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
浅埋暗挖隧道近距离平行上跨对既有盾构隧道的变形影响分析
(1.内蒙古科技大学土木工程学院,包头 014010;2.内蒙古科技大学矿山安全与地下工程院士工作站,包头 014010;3.内蒙古自治区高校城市地下工程技术研究中心,包头 014010;4.北京城建设计发展集团股份有限公司,北京 100371)
Analysis of Deformation Impact of the Adjacent Over-crossing Parallel Tunnel Excavated by the Shallow Mining Method on the Existing Shield Tunnels
(1. School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2. Academicians Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 3. Technical Research Center for Urban Underground Engineering of Colleges and Universities in the Inner Mongolia Autonomous Region,Baotou 014010; 4. Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100371)
Download: PDF (5790KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 依托呼和浩特市浅埋暗挖隧道近距离平行上跨既有地铁2号线工程,通过有限元数值模拟和现场监测,对不同的开挖工法和反压措施进行方案比选,研究上穿施工引起盾构隧道结构上浮的变形规律。结果表明:在施工中采用砂袋反压可有效控制盾构隧道的变形,通过对比发现,第二次砂袋反压的竖向位移控制率明显低于第一次反压,故现场施工中应尽早对隧道进行砂袋反压,避免因反压时间较迟导致竖向位移控制率过小而无法达到良好的反压效果;上穿工程引起既有地铁2号线隧道的变形曲线呈“半抛物线”形,且随着新建隧道开挖卸荷而产生左右变换的现象;由于土体卸荷、覆土埋深较浅等因素,盾构管片发生不均匀变形,最终既有盾构隧道管片整体变形呈“竖鸭蛋”状;综合经济、效率等因素,最终确定的方案为CD法+双侧反压。该工程采用优化方案后,最终将盾构隧道道床最大上浮变形控制在2.51 mm,满足规范控制值4.0 mm要求。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
许有俊 1
2
3 秦浩斌 1 李文博 4 张 旭 1
2
3 张 朝 1
2
3 李泽升 4
关键词浅埋暗挖   上跨   盾构隧道   上浮控制   竖向位移控制率   施工方案优化     
Abstract: Given that the tunnel excavated by the shallow mining method adjacently crossed over the existing Metro Line No.2 in a parallel way in Hohhot, the scheme comparison was carried out for different excavation methods and counter-pressure measures by means of finite element numerical simulation and on-site monitoring, and the study was conducted on the floating deformation pattern of shield tunnel structure caused by over-crossing construction.The results showed that the use of sandbags for counterpressure during construction could effectively control the deformation of shield tunnels, and through comparison, it has been found that the vertical displacement control rate of the second sandbag counterpressure was significantly lower than that of the first sandbag counterpressure. So, sandbag counterpressure for tunnels should be conducted during on-site construction as early as possible to avoid a smaller vertical displacement control rate caused by delayed counterpressure, which would further lead to a failure to realize a good effect of counterpressure. It has also been found that the curve of tunnel deformation of Metro Line No. 2 caused by the over-crossing works was of a "semi-parabolic" shape, and the phenomenon of left-right conversion occurred with the excavation and unloading of the new tunnel. Besides, unhomogeneous deformation occurred in shield tunnel segments due to various factors, such as soil unloading, shallow depth of overburden, etc. and the overall deformation of the existing shield tunnel segments was of a "vertical duck egg" shape. The finalized scheme of the Works was CD method + two-sided counterpressure based on economical factor, efficiency and other factors.After the optimization scheme was adopted in the Works, the maximum floating deformation of the shield tunnel roadbed was finally controlled at 2.51 mm, which complied with the specified control value, i.e. 4.0 mm.
KeywordsShallow mining method,   Overcrossing,   Shield tunnel,   Floating control,   Vertical displacement control rate,   Optimization of construction option     
基金资助:呼和浩特市交通投资建设集团有限公司横向项目(2021073)
作者简介: 许有俊(1979-),男,博士,教授,主要从事隧道与地下工程方面的研究工作,E-mail: 876086409@qq.com. 通讯作者:秦浩斌(1998-),男,硕士研究生,主要从事隧道与地下工程方面的研究工作,E-mail:1136346869@qq.com.
引用本文:   
许有俊 1, 2, 3 秦浩斌 1 李文博 4 张 旭 1等 .浅埋暗挖隧道近距离平行上跨对既有盾构隧道的变形影响分析[J]  现代隧道技术, 2022,V59(3): 118-127
XU Youjun1, 2, 3 QIN Haobin1 LI Wenbo4 ZHANG Xu1 etc .Analysis of Deformation Impact of the Adjacent Over-crossing Parallel Tunnel Excavated by the Shallow Mining Method on the Existing Shield Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(3): 118-127
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I3/118
 
没有本文参考文献
[1] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[2] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[3] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[4] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[5] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[6] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[7] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[8] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[9] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[10] 张昕阳1,2 申玉生1,2 常铭宇1,2 刘 童1,2 孙天赦3,4 胡 帅3,4.克泥效工法对泥岩地层盾构隧道地表变形控制规律研究[J]. 现代隧道技术, 2025,62(2): 283-290
[11] 于同生1,2 官林星3 闫治国1,2.地铁盾构隧道多灾害场景及结构多灾害响应研究综述[J]. 现代隧道技术, 2025,62(2): 16-26
[12] 朱叶艇1,2 朱雁飞1 王志华1,3 王帅峰4 王 浩1 马志刚1 龚 卫1,2 秦 元1.推力矢量智控盾构的理论创新、方法实现与工程验证[J]. 现代隧道技术, 2025,62(2): 71-78
[13] 肖明清1 封 坤2 薛光桥1 王运超2 鲁志鹏1 陈 龙2.软土地层盾构姿态偏移引起的附加土压力影响因素研究[J]. 现代隧道技术, 2025,62(2): 141-150
[14] 姚占虎1 杨 琴2 李 辉2 魏代伟2 孟 佳2.盾构隧道同步双液注浆技术研究与应用[J]. 现代隧道技术, 2025,62(2): 265-273
[15] 蔡浩明.基岩爆破预处理对盾构掘进状态及岩体破碎机理的影响[J]. 现代隧道技术, 2025,62(1): 192-200
Copyright 2010 by 现代隧道技术