软弱泥岩大直径盾构姿态失稳与处理措施研究
(中铁十四局集团大盾构工程有限公司,南京 210000)
Posture Destabilization and Treatment Measures of Large Diameter Shield in Soft Mudstone
(China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 210000)
Download: PDF (5068KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为解决某大直径盾构在软弱泥岩复合地层曲线段掘进过程中遇到的“滚动”和“栽头”问题,通过分析盾构掘进中姿态失稳的原因和纠偏中常用的方法及对应的纠偏原理,并结合现场实际纠偏过程分析了各纠偏措施的效果,总结了适用于盾构滚动失稳的姿态纠偏技术。结果表明:(1)盾构在软硬复合地层掘进时,地层环境变化复杂容易导致盾构姿态失稳,长曲线段掘进将加剧盾构姿态失稳;(2)增设径向油缸、盾构刀盘单向转动、增添钢楔子等纠偏措施有助于改善盾构滚动。调节油缸压力、增设纵向油缸以及壁后二次注浆有助于盾构“栽头”的调整;(3)注入油脂和膨润土、换刀以及涂抹黄油等辅助方案,有利于降低盾构在姿态调整时的约束;(4)类似于盾构“栽头”与“滚动”同时发生的失稳情况,纠偏过程中建议先解决盾构滚动纠偏后,再解决轴线偏移问题。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
周胜利
关键词软岩掘进   盾构隧道   姿态失稳   盾构纠偏     
Abstract: In order to solve the "rolling" and "cutterhead pitch" problems encountered by a large diameter shield machine in the process of tunnelling in the curved section of the soft mudstone composite stratum, by analyzing the causes for the attitude destabilization of the shield tunnelling, the commonly used methods in the deviation correction and the corresponding correction principles, the effects of various correction measures are analyzed in combination with the actual correction process on site, and the posture correction technology applicable to the rolling destabilization of the shield. The results show that: (1) When the shield tunnelling is implemented in the soft and hard composite stratum, the complex changes of the stratum environment will easily lead to the instability of the shield posture, and the tunnelling in the long curve section will aggravate the instability; (2) Such corrective measures as adding radial oil cylinder, one-way rotation of shield cutterhead, and adding steel wedge are helpful to improve shield rolling. Adjusting the pressure of the oil cylinder, adding longitudinal oil cylinder and secondary grouting behind the wall are helpful to the adjustment of the shield from "cutterhead pitch"; (3) Auxiliary schemes such as grease and bentonite injection, tool change and butter application are conducive to reducing the constraint of the shield during posture adjustment; (4) For the case similar to the simultaneous instability of "cutterhead pitch" and "rolling" of the shield, it is recommended to first solve the rolling correction of the shield before the problem of axis shifting.
KeywordsSoft rock tunnelling,   Shield tunnel,   Posture destabilization,   Deviation correction of shield     
基金资助:国家自然科学基金(51878569).
作者简介: 周胜利(1984-),男,高级工程师,主要从事盾构施工技术研究工作,E-mail:1094922771@qq.com.
引用本文:   
周胜利 .软弱泥岩大直径盾构姿态失稳与处理措施研究[J]  现代隧道技术, 2022,V59(6): 208-215
ZHOU Shengli .Posture Destabilization and Treatment Measures of Large Diameter Shield in Soft Mudstone[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 208-215
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I6/208
 
没有本文参考文献
[1] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[2] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[3] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[4] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[5] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[6] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[7] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[8] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[9] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[10] 张昕阳1,2 申玉生1,2 常铭宇1,2 刘 童1,2 孙天赦3,4 胡 帅3,4.克泥效工法对泥岩地层盾构隧道地表变形控制规律研究[J]. 现代隧道技术, 2025,62(2): 283-290
[11] 于同生1,2 官林星3 闫治国1,2.地铁盾构隧道多灾害场景及结构多灾害响应研究综述[J]. 现代隧道技术, 2025,62(2): 16-26
[12] 朱叶艇1,2 朱雁飞1 王志华1,3 王帅峰4 王 浩1 马志刚1 龚 卫1,2 秦 元1.推力矢量智控盾构的理论创新、方法实现与工程验证[J]. 现代隧道技术, 2025,62(2): 71-78
[13] 肖明清1 封 坤2 薛光桥1 王运超2 鲁志鹏1 陈 龙2.软土地层盾构姿态偏移引起的附加土压力影响因素研究[J]. 现代隧道技术, 2025,62(2): 141-150
[14] 姚占虎1 杨 琴2 李 辉2 魏代伟2 孟 佳2.盾构隧道同步双液注浆技术研究与应用[J]. 现代隧道技术, 2025,62(2): 265-273
[15] 蔡浩明.基岩爆破预处理对盾构掘进状态及岩体破碎机理的影响[J]. 现代隧道技术, 2025,62(1): 192-200
Copyright 2010 by 现代隧道技术