地表超载作用下大直径全预制装配盾构隧道受力变形规律研究
(1.中交隧道工程局有限公司,北京 100102;2.同济大学土木工程学院地下建筑与工程系,上海 200092; 3.青海大学土木水利学院,西宁 810016)
Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge
(1. CCCC Tunnel Engineering Co., Ltd., Beijing 100102; 2. Department of Geotechnical Engineering College of Civil Engineering,Tongji University, Shanghai 200092; 3. Collegeof Civil Engineering and Water Resources, Qinghai University, Xining 810016)
Download: PDF (6693KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为满足结构设计要求,大直径全预制装配盾构隧道中隔墙与管片之间会预留一定的变形空间,但是在超载作用下运营期隧道管片与中隔墙可能发生接触,改变隧道结构体系的受力模式,给隧道结构安全运维带来巨大的挑战。鉴于此,依托上海机场联络线隧道工程实例,建立大直径全预制装配盾构隧道三维精细化有限元分析模型,分析地表超载作用下大直径全预制装配盾构隧道管片与中隔墙协同受力和变形规律。研究表明,超载作用下大直径全预制装配盾构隧道管片与中隔墙会发生接触,接触后隧道结构刚度和承载能力提高,但超载作用会引起管片与隧道内部构件损伤,其中弧形构件板底、弧形构件柱帽上方板顶、弧形构件柱帽外侧和中隔墙底部均处于受拉状态,为内部构件易损节点;隧道结构损伤及破坏模式受中隔墙顶部预留间隙影响,为提高隧道承载能力,建议将中隔墙顶部间隙控制在90 mm左右。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
朱美恒1 陈思睿2 黄忠凯2 李永波1 张吾渝3 张冬梅2
关键词大直径盾构隧道   全预制装配   地表超载   结构变形   数值模拟     
Abstract: To meet structural design requirements, a certain deformation space is reserved between the mid-parti? tion wall and the segment lining in large-diameter fully prefabricated assembled shield tunnels. However, during the operation period, the segments and mid-partition wall of the tunnel may come into contact under the ground surcharge conditions, changing the stress modes of the tunnel structure and posing significant challenges to the safe operation and maintenance of the tunnel structure. In view of this, based on the Shanghai Airport Link Line Tunnel project,a three-dimensional refined finite element analysis model of a large-diameter fully prefabricated assembled shield tunnel was established to analyze the cooperative load bearing and deformation law of the segments and mid-partition wall under the ground surcharge conditions. The study shows that under the ground surcharge conditions, the segments and mid-partition wall of the large-diameter fully prefabricated assembled shield tunnel will come into contact, which will improve the stiffness and bearing capacity of the tunnel structure, but the surcharge can cause damage to the segments and internal components of the tunnel. The bottom of the plate of the arc component, the top of the column cap of the arc component, the outer side of column cap of the arc component, and the bottom of the mid-partition wall are all in a tensile state and are the vulnerable nodes. The damage and failure modes of the tunnel structure are affected by the reserved gap at the top of the mid-partition wall. To improve the bearing capacity of the tunnel, it is recommended to control the gap at the top of the mid-partition wall at about 90 mm.
KeywordsLarge-diameter shield tunnel,   Fully prefabricated assembly,   Ground surcharge,   Structural deformation,   Numerical simulation     
基金资助:国家重点研发计划课题(2022YFC3800905);上海市“科技创新行动计划”优秀学术/技术带头人计划项目(22XD1430200);同济大学学科交叉联合攻关项目(2022-3-ZD-07).
作者简介: 朱美恒(1985-),男,工程师,主要从事盾构施工管理、盾构维修及推进方面的研究工作,E-mail:250891644@qq.com. 通讯作者:陈思睿(2000-),男,博士研究生,主要从事盾构隧道安全评价方面的研究工作,E-mail:dancychen@tongji.edu.cn.
引用本文:   
朱美恒1 陈思睿2 黄忠凯2 李永波1 张吾渝3 张冬梅2 .地表超载作用下大直径全预制装配盾构隧道受力变形规律研究[J]  现代隧道技术, 2024,V61(4): 161-171
ZHU Meiheng1 CHEN Sirui2 HUANG Zhongkai2 LI Yongbo1 ZHANG Wuyu3 ZHANG Dongmei2 .Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(4): 161-171
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I4/161
 
没有本文参考文献
[1] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[2] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[3] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[4] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[5] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[6] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[7] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[8] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[9] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[10] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[11] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
[12] 王帅帅1 傅一帆2,3 徐 勇1 史经峰1 郭 春2,3.通过接力风机进行风量分配的隧道施工风仓式通风参数研究[J]. 现代隧道技术, 2025,62(3): 240-248
[13] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[14] 李 敬1 罗禄森1 张柏林2 胡浩然2.辅助隧道封闭后隧道内瓦斯运移富集规律研究[J]. 现代隧道技术, 2025,62(2): 201-211
[15] 郭 盈 彭文庆 陈世强 张 琼 王佳伟.隧道行车道通风模型试验当量长度计算方法与验证[J]. 现代隧道技术, 2025,62(2): 230-240
Copyright 2010 by 现代隧道技术