现代隧道技术 2024, Vol. 61 Issue (4) :161-171    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
地表超载作用下大直径全预制装配盾构隧道受力变形规律研究
(1.中交隧道工程局有限公司,北京 100102;2.同济大学土木工程学院地下建筑与工程系,上海 200092; 3.青海大学土木水利学院,西宁 810016)
Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge
(1. CCCC Tunnel Engineering Co., Ltd., Beijing 100102; 2. Department of Geotechnical Engineering College of Civil Engineering,Tongji University, Shanghai 200092; 3. Collegeof Civil Engineering and Water Resources, Qinghai University, Xining 810016)
Download: PDF (6693KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为满足结构设计要求,大直径全预制装配盾构隧道中隔墙与管片之间会预留一定的变形空间,但是在超载作用下运营期隧道管片与中隔墙可能发生接触,改变隧道结构体系的受力模式,给隧道结构安全运维带来巨大的挑战。鉴于此,依托上海机场联络线隧道工程实例,建立大直径全预制装配盾构隧道三维精细化有限元分析模型,分析地表超载作用下大直径全预制装配盾构隧道管片与中隔墙协同受力和变形规律。研究表明,超载作用下大直径全预制装配盾构隧道管片与中隔墙会发生接触,接触后隧道结构刚度和承载能力提高,但超载作用会引起管片与隧道内部构件损伤,其中弧形构件板底、弧形构件柱帽上方板顶、弧形构件柱帽外侧和中隔墙底部均处于受拉状态,为内部构件易损节点;隧道结构损伤及破坏模式受中隔墙顶部预留间隙影响,为提高隧道承载能力,建议将中隔墙顶部间隙控制在90 mm左右。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
朱美恒1 陈思睿2 黄忠凯2 李永波1 张吾渝3 张冬梅2
关键词大直径盾构隧道   全预制装配   地表超载   结构变形   数值模拟     
Abstract: To meet structural design requirements, a certain deformation space is reserved between the mid-parti? tion wall and the segment lining in large-diameter fully prefabricated assembled shield tunnels. However, during the operation period, the segments and mid-partition wall of the tunnel may come into contact under the ground surcharge conditions, changing the stress modes of the tunnel structure and posing significant challenges to the safe operation and maintenance of the tunnel structure. In view of this, based on the Shanghai Airport Link Line Tunnel project,a three-dimensional refined finite element analysis model of a large-diameter fully prefabricated assembled shield tunnel was established to analyze the cooperative load bearing and deformation law of the segments and mid-partition wall under the ground surcharge conditions. The study shows that under the ground surcharge conditions, the segments and mid-partition wall of the large-diameter fully prefabricated assembled shield tunnel will come into contact, which will improve the stiffness and bearing capacity of the tunnel structure, but the surcharge can cause damage to the segments and internal components of the tunnel. The bottom of the plate of the arc component, the top of the column cap of the arc component, the outer side of column cap of the arc component, and the bottom of the mid-partition wall are all in a tensile state and are the vulnerable nodes. The damage and failure modes of the tunnel structure are affected by the reserved gap at the top of the mid-partition wall. To improve the bearing capacity of the tunnel, it is recommended to control the gap at the top of the mid-partition wall at about 90 mm.
KeywordsLarge-diameter shield tunnel,   Fully prefabricated assembly,   Ground surcharge,   Structural deformation,   Numerical simulation     
基金资助:国家重点研发计划课题(2022YFC3800905);上海市“科技创新行动计划”优秀学术/技术带头人计划项目(22XD1430200);同济大学学科交叉联合攻关项目(2022-3-ZD-07).
作者简介: 朱美恒(1985-),男,工程师,主要从事盾构施工管理、盾构维修及推进方面的研究工作,E-mail:250891644@qq.com. 通讯作者:陈思睿(2000-),男,博士研究生,主要从事盾构隧道安全评价方面的研究工作,E-mail:dancychen@tongji.edu.cn.
引用本文:   
朱美恒1 陈思睿2 黄忠凯2 李永波1 张吾渝3 张冬梅2 .地表超载作用下大直径全预制装配盾构隧道受力变形规律研究[J]  现代隧道技术, 2024,V61(4): 161-171
ZHU Meiheng1 CHEN Sirui2 HUANG Zhongkai2 LI Yongbo1 ZHANG Wuyu3 ZHANG Dongmei2 .Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(4): 161-171
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I4/161
 
没有本文参考文献
[1] 刘肖汇1 封 坤1 郭文琦1 鲁选一1 彭长胜2 李姣阳2.内部结构施作方式对盾构隧道纵向力学特性的影响研究[J]. 现代隧道技术, 2024,61(4): 151-160
[2] 苏培东 陆星好 李有贵 邱 鹏 安兴玲.亭子口灌区瓦斯水工隧洞施工通风影响因素研究[J]. 现代隧道技术, 2024,61(4): 180-191
[3] 赵海松 魏安辉 邵 江 向 波 邬 凯 李世琦 周仁强 柳 松.浅埋顺层偏压洞口边坡失稳机制及防治研究[J]. 现代隧道技术, 2024,61(3): 253-265
[4] 葛照国.大直径盾构隧道近接高架桩基群施工影响分区方法与分区控制技术研究[J]. 现代隧道技术, 2024,61(3): 276-289
[5] 屈建荣1 敬雅文2 任兆丹1 熊 颖2 陈雪锋1 冯冀蒙2.基于围岩破坏特征的单洞四车道公路隧道围岩分级修正研究[J]. 现代隧道技术, 2024,61(1): 48-55
[6] 郝鹏飞.预制整体式弧形件施工质量控制指标研究[J]. 现代隧道技术, 2024,61(1): 245-251
[7] 郑镇跡1 黄书华2 陈湘生1 张 良2 刘皓铭1 盛 健2 苏 栋1.超大直径盾构主隧道机械法联络通道特殊衬砌管片受力特性分析[J]. 现代隧道技术, 2024,61(1): 117-124
[8] 魏传文1 王相龙1 杨旭旭2 赵玉棣1 邵 行3 满新杰1张长安3 周洋洋1 张作顺2.薄层状岩体隧道冒顶机制及支护方案优化研究[J]. 现代隧道技术, 2024,61(1): 252-259
[9] 王德福.盾构滚刀切削桩基相互作用机理及关键参数分析研究——以海珠湾盾构隧道为例[J]. 现代隧道技术, 2024,61(1): 216-228
[10] 郇昊霖1 李培楠2 刘 俊1 宋兴宝3 秦 元3 寇晓勇3 翟一欣3.大直径盾构隧道内部装配式预制结构安装路径优化及应用[J]. 现代隧道技术, 2024,61(1): 236-244
[11] 杨春山1 杨雪强2 王雅甜2 林永贵1.建筑敏感区隧道破除抗滑桩进洞转换体系设计与施工方案优选[J]. 现代隧道技术, 2023,60(6): 220-227
[12] 薛光桥1,2 肖明清1,2 封 坤3 王少锋1,2 薛皓匀3 郭文琦3.特大直径双层公路盾构隧道管片-内部结构复合体系横向抗震性能研究[J]. 现代隧道技术, 2023,60(5): 67-77
[13] 于建新 刘文金 王金星 刘焕春 周志彬.层状岩体隧道爆破对支护体系的振动影响研究[J]. 现代隧道技术, 2023,60(5): 99-110
[14] 苗回归1 黄 飞1,2 李树清1,2 罗亚飞1,2 苗德华1 焦杨洋1.基于数值模拟-多元线性回归的大断面隧道平均瓦斯浓度检测位置研究[J]. 现代隧道技术, 2023,60(5): 128-135
[15] 马亚丽娜1, 2 陈雅琪1, 2 刘继国1, 2 崔 臻3 周光新4.跨走滑断层铰接式隧洞衬砌错断破坏机制研究[J]. 现代隧道技术, 2023,60(5): 136-147
Copyright 2010 by 现代隧道技术