TBM裂隙岩体隧洞涌水机制及注浆堵水研究
(1.中南大学土木工程学院,长沙 410075;2. 中铁十八局集团有限公司,天津 300222; 3.中铁十八局集团隧道工程有限公司,重庆 400700;4. 山东大学齐鲁交通学院,济南 250061; 5.南京工业大学材料科学与工程学院,南京 211816;⒍ 中铁西南科学研究院有限公司,成都 611731)
Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses
(1. School of Civil Engineering, Central South University, Changsha 410075; 2. China Railway 18th Bureau Group Co.,Ltd., Tianjin 300222; 3. China Railway No.18 Bureau Group Tunnel Engineering Co., Ltd., Chongqing, 400700; 4. School of Qilu Transportation,Shandong University, Jinan 250061; 5. School of Materials Science and Engineering, Nanjing Tech University, Nanjing 211816; 6. China Railway Southwest Research Institude Co. Ltd., Chengdu 611731)
Download: PDF (7058KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究富水裂隙岩体隧洞涌水治理问题,依托引绰济辽输水隧洞工程,统计了岩体裂隙特征,基于现 场涌水情况建立了等效岩体裂隙数值模型,研究全断面注浆堵水效果,开展全断面注浆堵水工程应用研究。研究结 果表明,贯通隧洞的大裂隙为优势涌水通道,单点聚氨酯注浆对贯通裂隙涌水的整体封堵作用有限;等效三维数值 模型可反映隧洞实际涌水情况,通过提高注浆圈厚度、降低注浆圈渗透系数,可显著降低隧洞段涌水量,当注浆圈厚 度为2.5~4.0 m,注浆圈渗透系数为2.07×10-6 ~4.14×10-6 ㎝·s-1 时,堵水率可达83.27%~93.25%;水泥-水玻璃双液全 断面注浆应用效果良好,注浆后由股状涌水及大面积线状流水转变为局部滴水和少量线状流水,堵水率为96.9%~ 98.3%。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
罗志洋1 张春瑜2
3 王立川1
2
4
5 徐 烁1 李利平4 王倩倩5 刘志强6
关键词TBM隧洞   裂隙岩体   隧洞涌水   全断面注浆   数值模拟     
Abstract: To address water inrush control in water-rich fractured rock tunnels, this study is focused on the Chaor River to the Western Liaohe River Water Diversion Tunnel Project. Statistical analysis of rock mass fracture characteristics was conducted, and an equivalent fractured rock numerical model was developed based on field observations of water inrush to assess full-face grouting and sealing performance. The results reveal that interconnected fractures penetrating the tunnel serve as dominant pathways for water inrush, with single-point polyurethane grouting showing limited effectiveness in sealing continuous fracture flow paths. The established 3D equivalent numerical model accurately simulates actual water inrush conditions, demonstrating that increasing the grouting ring thickness to 2.5-4.0 m while reducing permeability to 2.07×10??-4.14×10?? cm/s can reduce water inrush by 83.27-93.25%.Field application of full-face cement-sodium silicate double-liquid grouting proved highly effective, achieving 96.9-98.3% sealing efficiency and transforming gushing water and large-area linear flow into localized dripping and a small linear flow.
KeywordsTBM tunnel,   Fractured rock mass,   Tunnel water inrush,   Full-face grouting,   Numerical simulation     
基金资助:中铁十八局集团有限公司科技研发项目(G21-11);中铁十八局集团隧道工程有限公司科技研发项目(11-JF-2023-引绰济辽-0-001).
作者简介: 罗志洋(2000-),男,硕士研究生,主要从事隧道与地下工程方面的研究工作,E-mail:224812338@csu.edu.cn. 通讯作者:王立川(1965-),男,博士,正高级工程师,主要从事隧道及地下工程的建设技术、管理方面的研究与教学工作,E-mail:wlc773747@126.com.
引用本文:   
罗志洋1 张春瑜2, 3 王立川1, 2等 .TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]  现代隧道技术, 2025,V62(4): 145-154
LUO Zhiyang1 ZHANG Chunyu2, 3 WANG Lichuan1, 2 etc .Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(4): 145-154
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I4/145
 
没有本文参考文献
[1] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[2] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[3] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[4] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[5] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[6] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[7] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[8] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[9] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[10] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
[11] 王帅帅1 傅一帆2,3 徐 勇1 史经峰1 郭 春2,3.通过接力风机进行风量分配的隧道施工风仓式通风参数研究[J]. 现代隧道技术, 2025,62(3): 240-248
[12] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[13] 李 敬1 罗禄森1 张柏林2 胡浩然2.辅助隧道封闭后隧道内瓦斯运移富集规律研究[J]. 现代隧道技术, 2025,62(2): 201-211
[14] 郭 盈 彭文庆 陈世强 张 琼 王佳伟.隧道行车道通风模型试验当量长度计算方法与验证[J]. 现代隧道技术, 2025,62(2): 230-240
[15] 易壮鹏 王申奥 唐新超 陈志威.基于CFD的多车道宽幅悬浮隧道管体涡激振动特性研究[J]. 现代隧道技术, 2025,62(1): 92-102