明暗挖施工地铁车站下部暗挖隧道围岩压力计算方法研究
(1西南交通大学土木工程学院,成都 610031;2西南交通大学唐山研究生院,唐山 063000;3中铁隧道局集团建设有限公司,南宁 530000)
Calculation Method for the Surrounding Rock Pressure of Mined Lower Tunnel Structure of a Metro Station Built by Combination of Open Cut and Mined Method
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Tangshan Graduate School, Southwest Jiaotong University, Tangshan 063000; 3 China Railway Tunnel Group Co., Ltd, Nanning 530000)
Download: PDF (1532KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 南宁轨道3号线青秀山地铁车站受地形限制采用上明挖下暗挖法施工。下部暗挖隧道根据埋深介于深浅埋之间,进行结构设计时,先施工的上部明挖站厅结构等效处理恰当与否,对于保证暗挖隧道结构安全至关重要。通过理论推导表明,当上部站厅结构等效为土体时,其下部暗挖隧道竖向围岩压力为150.69 kN/m,水平围岩压力为95.28 kN/m;当等效为附加荷载时,其下部暗挖隧道竖向围岩压力为439.83 kN/m,水平围岩压力为103.28 kN/m。通过数值计算表明,当上部站厅结构等效为土体时,最大安全系数为60.29,其部位在拱腰处,最小安全系数为7.39,其部位在拱底处;当等效为附加荷载时,最大安全系数为21.558,其部位在拱脚处,最小安全系数为2.529,其部位在拱底处。因此,建议暗挖隧道围岩压力计算时,上部站厅结构按照附加荷载处理较为合适。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
严 涛 1 李坤杰 1 秦鹏程 1 陈劲宇 1
2 林 锐 3 左 强 3
关键词:   
Abstract: Restricted by the topography, the Qingxiushan metro station of Nanning rail transit line 3 is built by open cut method for the upper part and mined method for the lower part. The lower mined tunnel is classified as the one in the transition zone from the shallow overburden to the deep overburden, and it′s significant for proper equivalent calculation of the upper open-cut excavated station hall to ensure structure safety of mined tunnel regarding structure design. The vertical pressure of surrounding rocks of the lower mined tunnel is 150.69 kN/m and the horizontal pressure of surrounding rock is 95.28 kN/m when the upper station hall structure is equivalent to soil body;the vertical pressure of surrounding rocks of the lower mined tunnel is 439.83 kN/m and the horizontal pressure of surrounding rock is 103.28 kN/m when the upper station hall structure is equivalent to additional load. The numerical calculation shows that the maximum safety factor is 60.29 (at haunch) and the minimum safety factor is 7.39(at bottom) when the upper station hall structure is equivalent to soil body; the maximum safety factor is 21.558 (at arch spring) and the minimum safety factor is 2.529 (at bottom) when the upper station hall structure is equivalent to additional load. It is suggested that it is proper for the upper station hall structure to be equivalent to additional load regarding the pressure calculation of surrounding rocks of the mined tunnel.
KeywordsMetro station,   Open cut and mined construction,   Equivalent treatment of open cut structure,   Pressure of surrounding rocks,   Structure safety     
基金资助:基金项目:西藏自治区重点研发与转化计划项目(XZ201801-GB-07);中铁隧道局集团有限公司科技项目(2015-21);云南省交通运输厅科技计划项目(云交科教便(2019) 6号);陕西省交通运输科技项目(2015-11K);国家自然科学基金资助项目(51508475); 四川省科技厅科技创新创业项目(2018RZ0109).
作者简介: 作者简介:严 涛(1982-),男,博士,硕士生导师,讲师,主要从事隧道及地下工程教学与科研工作,E-mail: yantao228@163.com.
引用本文:   
严 涛 1 李坤杰 1 秦鹏程 1 陈劲宇 1, 2 林 锐 3 左 强 3 .明暗挖施工地铁车站下部暗挖隧道围岩压力计算方法研究[J]  现代隧道技术, 2020,V57(1): 76-82
YAN Tao1 LI Kunjie1 QIN Pengcheng1 CHEN Jingyu1, 2 LIN Rui3 ZUO Qiang3 .Calculation Method for the Surrounding Rock Pressure of Mined Lower Tunnel Structure of a Metro Station Built by Combination of Open Cut and Mined Method[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(1): 76-82
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I1/76
 
没有本文参考文献
[1] 魏新江 1,2 陈涛涛 2 王 霄 2 虞兴福 1 周联英 1.岩爆灾害研究与进展[J]. 现代隧道技术, 2020,57(2): 1-12
[2] 覃 晖 1 唐 玉 2 谢雄耀 3,4 王峥峥 1.基于支持向量机的隧道衬砌空洞机器识别方法[J]. 现代隧道技术, 2020,57(2): 13-19
[3] 朱宝合 郑邦友 戴亦军 刘 灿.基于非线性支持向量机的隧道煤与瓦斯突出危险性预测[J]. 现代隧道技术, 2020,57(2): 20-25
[4] 闫长斌 姜晓迪.基于岩体指标和掘进参数的TBM净掘进速率预测模型[J]. 现代隧道技术, 2020,57(2): 26-33
[5] 章龙管 1 段文军 1 庄元顺 1 张中华 1 刘绥美 1 章 峰 2.盾构大数据预处理方法研究[J]. 现代隧道技术, 2020,57(2): 34-41
[6] 廖 凯 1 李 林 2 吴 剑 1.隧道超欠挖检测信息系统设计与实现[J]. 现代隧道技术, 2020,57(2): 42-48
[7] 张 军 1 王明慧 1,2 向道银 1 张 桥 1 蒋树平 1 刘伟帮.郑万高铁重庆段隧道二次衬砌施工质量管理实践[J]. 现代隧道技术, 2020,57(2): 49-54
[8] 秦鹏飞.地下工程注浆技术研究新进展[J]. 现代隧道技术, 2020,57(2): 55-60
[9] 张金龙 1 苟长飞 2 叶 飞 3.大断面跨海盾构隧道结构设计与参数分析[J]. 现代隧道技术, 2020,57(2): 61-67
[10] 郑邦友 1 陈富东 2 雷明锋 2 吴治刚 1 彭 成 1 姚 宇 1.考虑生态环境效应的止水帷幕设计方法初探[J]. 现代隧道技术, 2020,57(2): 68-72
[11] 郭志杰 1,2 张灿程 1,2.静电除尘在天山胜利隧道通风中的应用研究[J]. 现代隧道技术, 2020,57(2): 73-79
[12] 闫 肃 1,2.采用平导超前和无轨运输方式的长大瓦斯隧道施工六阶段通风技术[J]. 现代隧道技术, 2020,57(2): 80-85
[13] 单 超 1,2 甘 露 2,3 王亚东 2 曹校勇 1,2 赖金星 2.灰土挤密桩加固黄土隧道受力与变形性状分析[J]. 现代隧道技术, 2020,57(2): 86-95
[14] 赵 伟 1,2 雷升祥 1,2,3 肖清华 1,2 刘纪峰 4 陈桥枫 1,2.基于结构特征曲线的软岩隧道钢拱架力学效应研究[J]. 现代隧道技术, 2020,57(2): 96-103
[15] 于 丽 1,2 汪主洪 1,2 张艺腾 1,2 江勇涛 1,2 王明年.浅埋黄土隧道土石分界高度对初期支护结构安全性的影响分析[J]. 现代隧道技术, 2020,57(2): 104-109
Copyright 2010 by 现代隧道技术