[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2021, Vol. 58 Issue (1) :117-126    DOI:
分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
富水地层盾构管廊工程岩土体参数反演与掌子面稳定性分析
(1 沈阳工业大学建筑与土木工程学院,沈阳 110870;2 兰州理工大学甘肃省土木工程防灾减灾重点实验室,兰州 730050;3 中铁十九局集团第五工程有限公司,大连 116100)
Soil Parameters Inversion and Working Face Stability Analysis for a Shielddriven Utility Tunnel in Water-rich Strata
(1 School of Architecture and Civil Engineering, Shenyang University of Technology, Shenyang 110870; 2 Key Laboratory of Disaster Prevention and Mitigation in Civil Engineering of Gansu Province, Lanzhou University of Technology, Lanzhou 730050; 3 The Fifth Engineering Co., Ltd, China Railway 19th Bureau Group, Dalian 116100)
Download: PDF (4477KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章以沈阳富水地层盾构管廊工程为研究背景,对土压平衡盾构开挖引起的地表竖向位移和水平位移进行监测,并分析位移的变化规律。以现场测量得到的位移监测值为基础,基于粒子群优化的BP神经网络算法建立PSO-BP参数反演分析方法,利用Fortran语言编制位移反分析程序,并采用正交设计和ABAQUS数值计算进行参数反演。考虑静止土压力、主动土压力和被动土压力对掌子面稳定性的影响,根据反演的参数对盾构廊道掌子面的支护压力进行分析。研究结果表明:所建立的PSO-BP参数反演分析方法是一种可行、有效的反分析方法。当支护压力比λ =0.4时,掌子面处于极限状态;随着支护压力比的减小,地表沉降呈增大趋势。当考虑地下水作用时,为了保证掌子面的稳定需要增加支护压力;当支护压力比λ =0.6时,掌子面处于极限状态。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王军祥 1 徐晨晖 1 董建华 2 陈四利 1 寇海军 3 王 鑫 1
关键词:   
Abstract: Taking the Shenyang utility tunnel project in water-rich strata as the research background, which is ex? cavated by a EPB shield machine, the vertical displacement and horizontal displacement of the ground surface caused by the EPB shield tunnelling are monitored, and the displacement development law is analyzed. According to the actual measured displacement data, the PSO-BP parameter inversion analysis method is established based on the particle swarm optimization algorithm. The displacement inverse analysis program is compiled using Fortran language, and the parameter inversion is performed using orthogonal design and ABAQUS numerical calculation method. Considering the effects of static earth pressure, active earth pressure and passive earth pressure on the working face stability, the limit supporting pressure on the shield-driven utility tunnel face is analyzed according to the inversed soil parameters. The results show that the PSO-BP parameter inversion analysis method is a feasible and effective method. When the supporting pressure ratio is 0.4, the working face is in the limit state; and with the decrease of the supporting pressure ratio, the ground surface settlement maintains an increase trend. When the effect of groundwater is considered, larger supporting pressure should be needed to ensure the stability of the working face;and the working face is in the limit stat when the supporting pressure ratio is 0.6.
KeywordsUtility tunnel,   EPB shield,   PSO-BP algorithm,   Parameter inversion,   Back analysis of displacement,   Support pressure     
基金资助:基金项目:国家自然科学基金项目(51608332,51774066);辽宁省自然科学基金项目(2019-MS-242);辽宁省教育厅重点攻关项目(LZGD2020004);中国博士后科学基金(2018M630293).
作者简介: 作者简介:王军祥(1985-),男,博士,副教授,博士生导师,主要从事隧道及地下工程灾害预警及防治机理方面的研究工作,E-mail: w.j.xgood@163.com.
引用本文:   
王军祥 1 徐晨晖 1 董建华 2 陈四利 1 寇海军 3 王 鑫 1 .富水地层盾构管廊工程岩土体参数反演与掌子面稳定性分析[J]  现代隧道技术, 2021,V58(1): 117-126
WANG Junxiang1 XU Chenhui1 DONG Jianhua2 CHEN Sili1 KOU Haijun3 WANG Xin1 .Soil Parameters Inversion and Working Face Stability Analysis for a Shielddriven Utility Tunnel in Water-rich Strata[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(1): 117-126
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I1/117
 
没有本文参考文献
[1] 王明年 1,2 胡萧越 1,2 唐雄俊 3 董宇苍 1,2 于 丽 1,2.大直径盾构铁路隧道火灾温度荷载及结构内力特性研究[J]. 现代隧道技术, 2021,58(1): 1-9
[2] 霍梦喆 1 刘夕奇 1 吝曼卿 2.完整围岩剪切型岩爆发生的力学机制[J]. 现代隧道技术, 2021,58(1): 10-18
[3] 于远祥 姚 尧 王京滨 王赋宇 柯 达.杆岩耦合作用下深埋隧洞围岩稳定性主控因素及支护优化研究[J]. 现代隧道技术, 2021,58(1): 19-26
[4] 李林毅 1 阳军生 1 王立川 1,2 王树英 1 方星桦 1 谢亦朋 1.强降雨作用下高速铁路隧道仰拱隆起原因分析及整治[J]. 现代隧道技术, 2021,58(1): 27-36
[5] 黄 斐 1 高 鑫 2.基于拱部CD法修筑的土岩复合地层双层初期支护拱盖法隧道结构稳定性研究[J]. 现代隧道技术, 2021,58(1): 37-45
[6] 孟 龑 1,2 程棋锋 1,3 陈 茜 1,2 吴晚霞 1,2 黄乙纯 1,2.多孔介质注浆模拟试验研究进展[J]. 现代隧道技术, 2021,58(1): 46-53
[7] 杨继华 1 郭卫新 1 闫长斌 2 苗 栋 1.基于掘进能耗的TBM掘进参数优化研究[J]. 现代隧道技术, 2021,58(1): 54-60
[8] 陈富东 1 雷明锋 1 郑邦友 2 吴治刚 2 姚 宇 2.基于正交试验的单侧止水帷幕设计参数优化研究[J]. 现代隧道技术, 2021,58(1): 61-66
[9] 蒋 频 李远富.基于主成分分析的地铁车站施工风险评估研究[J]. 现代隧道技术, 2021,58(1): 67-74
[10] 周盛世 张 宁 张晓娟.基于PPC-D-S证据理论的地铁施工风险评价[J]. 现代隧道技术, 2021,58(1): 75-83
[11] 韩兴博 1,2 夏永旭 1 汪文兵 3 柴伦磊 1 王 星 1.生命值与伤害值概念下的公路隧道火灾人员逃生安全风险研究[J]. 现代隧道技术, 2021,58(1): 84-91
[12] 房有亮 1 宋上明 1 尚海松 2 周济兵 2.建设工程数字化项目管控平台研究[J]. 现代隧道技术, 2021,58(1): 92-98
[13] 文 明 1,2 张顶立 2 方黄城 2 于富才 1 刘 艳 1.基于约束随机场理论的隧道围岩参数空间变异性优化分析[J]. 现代隧道技术, 2021,58(1): 99-108
[14] 张峰瑞 1 姜谙男 1 赵 亮 2 陈 维 2 郭 阔 2.基于多变量GP-DE模型的隧道变形时间序列预测研究[J]. 现代隧道技术, 2021,58(1): 109-116
[15] 伍宏宇 1,2 路军富 1 裴起帆 1.球墨铸铁-钢筋混凝土组合隧道壁板加载试验分析[J]. 现代隧道技术, 2021,58(1): 127-133
Copyright 2010 by 现代隧道技术