现代隧道技术 2021, Vol. 58 Issue (2) :220-227    DOI:
施工技术 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
黄土大断面隧道高陡边坡进出洞施工方案比选及临建布置
(中铁隧道集团二处有限公司,廊坊 065201)
Comparison of Construction Schemes and Layout of Temporary Facilities for the Entrance/Exit Section of a Large-section Loess Tunnel on High and Steep Slope
(Erchu Co.,Ltd. of China Railway Tunnel Group, Langfang 065201)
Download: PDF (4916KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  在黄土高原沟壑梁峁区修建隧道,洞口通常位于“Ⅴ”形冲沟半山腰黄土陡壁上,其高差大,洞口场地狭窄、进洞困难、施工场地布置困难,大断面黄土隧道洞口施工不当易造成病害、引发工程事故,尤其是隧道独头施工,由于洞口外未施工大管棚,又不容易掌握洞口段埋深情况,极容易引起塌方事故。①为确保进出洞安全,以宝兰客专兰山隧道进口为例,拟定了回填洞口场地进洞、修筑临时道路进洞、横洞进洞三台阶出洞及先横洞进洞再单侧壁导坑出洞四种方案,并对四种方案从安全、环境影响、工期、费用、可实施性等方面进行了分析和评估,选定了最优方案,在兰山隧道进出洞施工中得到成功运用;②通过设置分离式拌合站、梯道连接半山腰平台生活区与沟底施工场地的方案解决了场地狭窄、施工场地布置困难问题。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
李东顺
关键词:   
Abstract: When a tunnel is built in the gully and hilly area of the Loess Plateau, the portal is usually located on the loess steep wall in the halfway of the "V"-shaped gully. Due to great height difference, narrow portal site, uneasy accessing and difficult layout on the construction site, improper construction at the portal of a large-section loess tunnel may easily cause hazards and engineering accidents. Especially, the blind heading may cause collapse accidents very easily, for no large pipe roofs are installed form the outside of the tunnel and it is not easy to understand the buried depth conditions at the portal section. In order to ensure the construction safety of tunnel entrance/exit section, taking the entrance of the Lanshan tunnel on Baoji-Lanzhou passenger dedicated line as an example, four construction schemes are drawn up, namely excavating the tunnel entrance by backfilling portal site, excavating the tunnel entrance by building the temporary road, excavating the tunnel entrance by transverse adit and excavating the tunnel exit by three-bench method, as well as excavating the tunnel entrance by transverse adit and then excavating the tunnel ex? it by single-side drift method. The four schemes are analyzed and evaluated in terms of safety,environmental impact,construction period, cost, feasibility, etc. to select the best one, which is successfully applied in the entrance/exit construction of the Lanshan Tunnel. By installing a separate batching plant and a stairway to connect the living area on the half-mountain platform and the construction site at the bottom of the gully, the problems of narrow area and difficult layout on the construction site are solved.
KeywordsSteep wall,   Loess tunnel,   Single-side drift method,   Entrance/exit construction scheme     
作者简介: 作者简介:李东顺(1982-),男,高级工程师,主要从事项目施工技术管理工作,E-mail:lds419@163.com.
引用本文:   
李东顺 .黄土大断面隧道高陡边坡进出洞施工方案比选及临建布置[J]  现代隧道技术, 2021,V58(2): 220-227
LI Dongshun .Comparison of Construction Schemes and Layout of Temporary Facilities for the Entrance/Exit Section of a Large-section Loess Tunnel on High and Steep Slope[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 220-227
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I2/220
 
没有本文参考文献
[1] 于 介.红粘土与砂岩夹泥岩接触带隧道合理施工工法研究[J]. 现代隧道技术, 2021,58(2): 174-181
[2] 吴建成.长距离复杂航线下沉管管节拖航研究[J]. 现代隧道技术, 2021,58(2): 145-150
[3] 雷升祥 1 王 飞 2 于 介 2 邵生俊 3 梁庆国 4.浅谈黄土隧道未来技术发展[J]. 现代隧道技术, 2021,58(2): 1-7
[4] 张俊锋 1 李 强 2 史永跃 2 吴 磊 2.西南某隧道岩溶水发育规律及涌水量预测[J]. 现代隧道技术, 2021,58(2): 14-21
[5] 周文俊.天平线关山隧道涌水量预测技术研究[J]. 现代隧道技术, 2021,58(2): 22-30
[6] 龚秋明 1 王庆欢 1 王杜娟 2 邱海峰 3 吴 帆 1.盾构隧道施工刀盘状态实时监测系统研制[J]. 现代隧道技术, 2021,58(2): 41-50
[7] 许学良 1,2 马伟斌 1,2 蔡德钩 1,2 安哲立 1,2 柴金飞 1,2.铁路隧道全生命周期检测监测体系研究[J]. 现代隧道技术, 2021,58(2): 31-40
[8] 黄基富 肖功夷.悬臂掘进机在交通隧道施工中的实践应用与适应性研究[J]. 现代隧道技术, 2021,58(2): 51-62
[9] 王春河 1,2 朱福强 3 罗 兴 4 张传奎 1,2 田军令 3 李贺朋 2 郭翼飞 4.隧道改扩建工程施工风险评估研究[J]. 现代隧道技术, 2021,58(2): 63-70
[10] 张自光 1,2 曹广勇 1,2 李建立 3 翟朝娇 1,.上软下硬地层地铁隧道安全覆岩厚度研究[J]. 现代隧道技术, 2021,58(2): 71-77
[11] 文 旭 1 裴向军 1 裴 钻 1 杨海龙 1 陈臻林 1 张以晨 2.长白山景区棚洞结构设计及安全性研究[J]. 现代隧道技术, 2021,58(2): 151-157
[12] 吴 波 1,2 彭逸勇 1,2 蒙国往 1,2 濮松权 3.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J]. 现代隧道技术, 2021,58(2): 86-92
[13] 胡长明 1,2 李 靓 1 梅 源 1,2 袁一力 1 王志宇 1.盾构竖向姿态预测模型参数的全局敏感性分析[J]. 现代隧道技术, 2021,58(2): 127-134
[14] 高 鑫 王文娟.远场静水压力作用下深埋隧道双层叠合衬砌合理组合形式及力学变形特性研究[J]. 现代隧道技术, 2021,58(2): 93-102
[15] 喻洪平 1 苏培东 2 赵天彪 3 陈德君 1 徐学渊 1 杜宇本 1.西成客专黄家梁隧道原油和有害气体来源及危害研究[J]. 现代隧道技术, 2021,58(2): 182-187
Copyright 2010 by 现代隧道技术