小断面长陡斜坡隧道短导洞光面爆破技术研究
(1中国十九冶集团有限公司工业建设分公司,成都 610000;2 辽宁工业大学土木建筑工程学院,锦州 121001)
On Smooth Blasting Technology Assisted with Short Heading Cut Blasting for Tunnels with Small Sections and Long Steep Slopes
(1 Industrial Construction Branch of China 19th Metallurgical Corporation, Chengdu 610000; 2 School of Civil and Architectural Engineering, Liaoning University of Technology, Jinzhou 121001)
Download: PDF (6248KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  在工业及矿业工程施工中,矿山隧道因其断面形式非标化,断面尺寸较小,操作空间受限导致其机械化施工程度低,且隧道长陡斜坡的存在使其在“钻爆法”施工过程中极易出现爆破塌孔及冒顶现象,以致增加施工成本,拖延施工工期。为此基于“钻爆法”施工原理,采用隧道掌子面短导洞掏槽爆破技术,并结合掌子面爆破参数及炮眼布设的优化设计,通过电力起爆、非电起爆和毫秒微差起爆组成的特征起爆系统网络进行引爆传爆,实现小断面长陡斜坡矿山隧道全断面一次爆破成孔的光面爆破效果。通过该方法在西藏开投海通水泥项目矿山隧道工程中的实施,不仅能彻底解决隧道角度过大而导致的洞顶塌孔及爆破超挖过大的问题,同时能缩短120 d的施工工期,并节约近896.2万元的施工成本。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
周 涵 1 孙从煌 1 曲艳东 2 黎定忠 1
关键词:   
Abstract: In industrial and mining engineering construction, due to the non-standard cross-section form and small cross-section size of mining tunnels, the working space is restricted and so results in a low degree of mechanized construction. Also, the existence of a long steep slope makes the tunnel easy to encounter blasting hole collapse and roof caving in the "drill and blasting" construction process, which could increase the construction cost and delay the construction period. To this end, based on the "drill and blasting" construction method principle, it proposes to adopt the cut blasting technology for the short heading on the tunnel face in combination with the design optimization of face blasting parameters and hole patterns. Furthermore, by means of the characteristic initiation system network composed of electric initiation, non-electric initiation and millisecond delay initiation, the full-section smooth blasting effect in one blasting process is realized for mining tunnels with a small section and long steep slope. The implementation of this method in the mining tunnel engineering of the Haitong cement project of Tibet Development and Investment Group Co., Ltd. could not only solve the problems of hole collapsing at the top of the tunnel and over-break due to excessive blasting angles, but also shorten the construction period by 120 days and save nearly RMB 8,962,000 in construction cost.
KeywordsTunnel with small cross-section,   Short heading cut blasting,   Smooth blasting,   Blasting parameters,   Blast? hole design     
作者简介: 作者简介:周 涵(1981-),男,高级工程师,主要从事机械设备安装工程项目管理等工作,E-mail:15885137@qq.com. 通讯作者:孙从煌(1990 -),男,硕士研究生,助理工程师,主要从事工程爆破和爆炸力学研究工作,E-mail:sunconghuang@163.com.
引用本文:   
周 涵 1 孙从煌 1 曲艳东 2 黎定忠 1 .小断面长陡斜坡隧道短导洞光面爆破技术研究[J]  现代隧道技术, 2021,V58(2): 228-237
ZHOU Han1 SUN Conghuang1 QU Yandong2 LI Dingzhong1 .On Smooth Blasting Technology Assisted with Short Heading Cut Blasting for Tunnels with Small Sections and Long Steep Slopes[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 228-237
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I2/228
 
没有本文参考文献
[1] 于 介.红粘土与砂岩夹泥岩接触带隧道合理施工工法研究[J]. 现代隧道技术, 2021,58(2): 174-181
[2] 吴建成.长距离复杂航线下沉管管节拖航研究[J]. 现代隧道技术, 2021,58(2): 145-150
[3] 雷升祥 1 王 飞 2 于 介 2 邵生俊 3 梁庆国 4.浅谈黄土隧道未来技术发展[J]. 现代隧道技术, 2021,58(2): 1-7
[4] 张俊锋 1 李 强 2 史永跃 2 吴 磊 2.西南某隧道岩溶水发育规律及涌水量预测[J]. 现代隧道技术, 2021,58(2): 14-21
[5] 周文俊.天平线关山隧道涌水量预测技术研究[J]. 现代隧道技术, 2021,58(2): 22-30
[6] 龚秋明 1 王庆欢 1 王杜娟 2 邱海峰 3 吴 帆 1.盾构隧道施工刀盘状态实时监测系统研制[J]. 现代隧道技术, 2021,58(2): 41-50
[7] 许学良 1,2 马伟斌 1,2 蔡德钩 1,2 安哲立 1,2 柴金飞 1,2.铁路隧道全生命周期检测监测体系研究[J]. 现代隧道技术, 2021,58(2): 31-40
[8] 黄基富 肖功夷.悬臂掘进机在交通隧道施工中的实践应用与适应性研究[J]. 现代隧道技术, 2021,58(2): 51-62
[9] 王春河 1,2 朱福强 3 罗 兴 4 张传奎 1,2 田军令 3 李贺朋 2 郭翼飞 4.隧道改扩建工程施工风险评估研究[J]. 现代隧道技术, 2021,58(2): 63-70
[10] 张自光 1,2 曹广勇 1,2 李建立 3 翟朝娇 1,.上软下硬地层地铁隧道安全覆岩厚度研究[J]. 现代隧道技术, 2021,58(2): 71-77
[11] 文 旭 1 裴向军 1 裴 钻 1 杨海龙 1 陈臻林 1 张以晨 2.长白山景区棚洞结构设计及安全性研究[J]. 现代隧道技术, 2021,58(2): 151-157
[12] 吴 波 1,2 彭逸勇 1,2 蒙国往 1,2 濮松权 3.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J]. 现代隧道技术, 2021,58(2): 86-92
[13] 胡长明 1,2 李 靓 1 梅 源 1,2 袁一力 1 王志宇 1.盾构竖向姿态预测模型参数的全局敏感性分析[J]. 现代隧道技术, 2021,58(2): 127-134
[14] 高 鑫 王文娟.远场静水压力作用下深埋隧道双层叠合衬砌合理组合形式及力学变形特性研究[J]. 现代隧道技术, 2021,58(2): 93-102
[15] 喻洪平 1 苏培东 2 赵天彪 3 陈德君 1 徐学渊 1 杜宇本 1.西成客专黄家梁隧道原油和有害气体来源及危害研究[J]. 现代隧道技术, 2021,58(2): 182-187
Copyright 2010 by 现代隧道技术