砂卵石地层新建通道施工对上覆既有地铁车站的变形影响研究
(1 广州地铁设计研究院股份有限公司,广州 510010;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031;3 西南交通大学土木工程学院,成都 610031)
Study on Influence of New Transfer Channel Construction on Deformation of Overlying Existing Metro Station in Sandy Pebble Stratum
(1 Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031)
Download: PDF (5167KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章以成都地铁8号线换乘通道密贴下穿既有地铁车站工程为依托,采用现场监测与数值模拟相结合的方法分析暗挖施工对既有地铁车站的轨道沉降、影响范围、横断面变形等的影响。研究表明:暗挖施工完成后,既有地铁车站右线轨道沉降大于左线轨道沉降,数值模拟最大沉降为4.82 mm,与实测值误差为1.8%;随着导洞的开挖,在影响范围内既有地铁车站底板纵梁呈现下缘受拉,上缘受压的状态,暗挖施工对既有地铁车站的影响边界到开挖边界的距离约为16 m,对既有地铁车站的影响范围为55.5 m;在暗挖施工过程中,既有地铁车站横断面变形存在“扭转”现象,既有地铁车站横断面沉降最终表现为出口侧略大于进口侧,总体沉降均匀。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王 睿 1 苗龙刚 2
3 章慧健 2
3 农兴中 1 郭宏博 1
关键词:   
Abstract: Based on the transfer channel project of Chengdu Metro Line 8, which is closely passes under the exist? ing metro station, the influence of mined excavation of the transfer channel on the track settlement, influence range and cross-section deformation of the existing metro station is analyzed by combining on-site monitoring and numerical simulation methods. It is concluded that: the settlement of the right track of the existing metro station is greater than that of the left track after completion of the mined excavation, the maximum settlement obtained by the numerical simulation is 4.82 mm and the error between the numerical simulation result and the measured value is 1.8%;along with the excavation of the pilot tunnel, the longitudinal beam of the existing metro station bottom slab is in a state of tension at the lower edge and compression at the upper edge within the influence range, the distance from the influence boundary of the existing metro station affected by the mined excavation to the excavation boundary is about 16 m and the influence range of the existing metro station is 55.5 m; in the process of mined excavation, a "tor? sion" phenomenon would occur in the cross-section deformation of the existing metro station, while the final crosssection settlement of the existing metro station at the exit side is slightly greater than that at the entrance side, with uniformity of the overall settlement.
KeywordsTransfer channel,   Influence range,   Numerical calculation,   Track settlement,   Cross-section deformation     
基金资助:基金项目:国家重点研发计划(2017YFC0806006);国家自然科学基金(51578459,52178395)
作者简介: 作者简介:王 睿(1979-),男,高级工程师,主要从事隧道、地铁结构设计工作,E-mail: 78118185@qq.com. 通讯作者:章慧健(1982-),男,博士,副教授,主要从事地下工程近接施工影响机理和对策研究,E-mail: huijianz@163.com.
引用本文:   
王 睿 1 苗龙刚 2, 3 章慧健 2, 3 农兴中 1 郭宏博 1 .砂卵石地层新建通道施工对上覆既有地铁车站的变形影响研究[J]  现代隧道技术, 2021,V58(6): 129-136
WANG Rui1 MIAO Longgang2, 3 ZHANG Huijian2, 3 NONG Xingzhong1 GUO Hongbo1 .Study on Influence of New Transfer Channel Construction on Deformation of Overlying Existing Metro Station in Sandy Pebble Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 129-136
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/129
 
没有本文参考文献
[1] 冯冀蒙 1,2 蒋 辉 1,2 丁晓琦 1,2 虞龙平 1,2 张俊儒 1,2.并行双洞隧道穿越滑坡工程研究进展与挑战[J]. 现代隧道技术, 2021,58(6): 1-10
[2] 卢冠楠 1 王 鹏 1 杨 蕴 2 毛成君 3 吴咏敬 4 吴剑锋 3 董 平 3, 4 吴吉春 3.岩溶区隧道排水系统地下水渗流结晶堵塞机理及阻垢技术研究综述[J]. 现代隧道技术, 2021,58(6): 11-20
[3] 董建松.厦门海沧海底隧道穿越风化槽施工技术[J]. 现代隧道技术, 2021,58(6): 197-203
[4] 付 雷 马 鑫 邵 炜.冷水混入模式对藏南隧道高温热害预测的影响[J]. 现代隧道技术, 2021,58(6): 21-30
[5] 花晓鸣 罗晨曦 苟晓军 张海超.结合Landsat 8遥感影像的长大深埋隧道地表地热空间分布特征分析——以高黎贡山隧道为例[J]. 现代隧道技术, 2021,58(6): 31-37
[6] 王明年 1,2 崔 鹏 1,2 于 丽 1,2 卢旭东 3 胡萧越 1,2 夏鹏曦 1,2.基于台阶试验的相对最大摄氧量与人员疏散能力关系研究[J]. 现代隧道技术, 2021,58(6): 38-45
[7] 周晓军 1 郭 建 1 杨昌宇 2 卿伟宸 2 熊国兴 2 旷文涛 2 潘英东 1.钻爆法双线铁路隧道预制拼装二次衬砌分块方式研究[J]. 现代隧道技术, 2021,58(6): 46-58
[8] 何乐平 1 徐应东 1 胡启军 1 蔡其杰 2.基于博弈论-云模型的软岩隧道大变形风险评估[J]. 现代隧道技术, 2021,58(6): 85-94
[9] 郝俊锁.复杂地质特长深埋水工隧洞智能化施工关键技术研究[J]. 现代隧道技术, 2021,58(6): 188-196
[10] 魏 纲 1 郝 威 2 魏新江 1 王 霄 2 章书远 2.竖向顶管施工全过程数值模拟研究[J]. 现代隧道技术, 2021,58(6): 59-67
[11] 肖尊群 1,2,3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1.基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法[J]. 现代隧道技术, 2021,58(6): 68-76
[12] 徐公允 1 徐汪豪 1,2 姚志刚 1 方 勇 1 刘四进 3.基于三维RBD-DEM耦合方法的贯入角度对滚刀冲击影响分析[J]. 现代隧道技术, 2021,58(6): 77-84
[13] 来弘鹏 1 王 斌 1 刘禹阳 2.考虑地层开裂的浅埋黄土隧道围岩压力计算方法[J]. 现代隧道技术, 2021,58(6): 95-101
[14] 张冬梅 1,2 陈淙岑 2.管片钢筋和螺栓锈蚀条件下盾构隧道结构时变可靠度分析[J]. 现代隧道技术, 2021,58(6): 111-120
[15] 黄迪文 霍宏斌 陈 东.基于优化神经网络的圆形隧道受剪变形分析[J]. 现代隧道技术, 2021,58(6): 102-110
Copyright 2010 by 现代隧道技术