砂卵石地层新建通道施工对上覆既有地铁车站的变形影响研究
(1 广州地铁设计研究院股份有限公司,广州 510010;2 西南交通大学交通隧道工程教育部重点实验室,成都 610031;3 西南交通大学土木工程学院,成都 610031)
Study on Influence of New Transfer Channel Construction on Deformation of Overlying Existing Metro Station in Sandy Pebble Stratum
(1 Guangzhou Metro Design Institute Co., Ltd., Guangzhou 510010; 2 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031)
Download: PDF (5167KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 文章以成都地铁8号线换乘通道密贴下穿既有地铁车站工程为依托,采用现场监测与数值模拟相结合的方法分析暗挖施工对既有地铁车站的轨道沉降、影响范围、横断面变形等的影响。研究表明:暗挖施工完成后,既有地铁车站右线轨道沉降大于左线轨道沉降,数值模拟最大沉降为4.82 mm,与实测值误差为1.8%;随着导洞的开挖,在影响范围内既有地铁车站底板纵梁呈现下缘受拉,上缘受压的状态,暗挖施工对既有地铁车站的影响边界到开挖边界的距离约为16 m,对既有地铁车站的影响范围为55.5 m;在暗挖施工过程中,既有地铁车站横断面变形存在“扭转”现象,既有地铁车站横断面沉降最终表现为出口侧略大于进口侧,总体沉降均匀。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王 睿 1 苗龙刚 2
3 章慧健 2
3 农兴中 1 郭宏博 1
关键词:   
Abstract: Based on the transfer channel project of Chengdu Metro Line 8, which is closely passes under the exist? ing metro station, the influence of mined excavation of the transfer channel on the track settlement, influence range and cross-section deformation of the existing metro station is analyzed by combining on-site monitoring and numerical simulation methods. It is concluded that: the settlement of the right track of the existing metro station is greater than that of the left track after completion of the mined excavation, the maximum settlement obtained by the numerical simulation is 4.82 mm and the error between the numerical simulation result and the measured value is 1.8%;along with the excavation of the pilot tunnel, the longitudinal beam of the existing metro station bottom slab is in a state of tension at the lower edge and compression at the upper edge within the influence range, the distance from the influence boundary of the existing metro station affected by the mined excavation to the excavation boundary is about 16 m and the influence range of the existing metro station is 55.5 m; in the process of mined excavation, a "tor? sion" phenomenon would occur in the cross-section deformation of the existing metro station, while the final crosssection settlement of the existing metro station at the exit side is slightly greater than that at the entrance side, with uniformity of the overall settlement.
KeywordsTransfer channel,   Influence range,   Numerical calculation,   Track settlement,   Cross-section deformation     
基金资助:基金项目:国家重点研发计划(2017YFC0806006);国家自然科学基金(51578459,52178395)
作者简介: 作者简介:王 睿(1979-),男,高级工程师,主要从事隧道、地铁结构设计工作,E-mail: 78118185@qq.com. 通讯作者:章慧健(1982-),男,博士,副教授,主要从事地下工程近接施工影响机理和对策研究,E-mail: huijianz@163.com.
引用本文:   
王 睿 1 苗龙刚 2, 3 章慧健 2, 3 农兴中 1 郭宏博 1 .砂卵石地层新建通道施工对上覆既有地铁车站的变形影响研究[J]  现代隧道技术, 2021,V58(6): 129-136
WANG Rui1 MIAO Longgang2, 3 ZHANG Huijian2, 3 NONG Xingzhong1 GUO Hongbo1 .Study on Influence of New Transfer Channel Construction on Deformation of Overlying Existing Metro Station in Sandy Pebble Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 129-136
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2021/V58/I6/129
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术