[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2022, Vol. 59 Issue (2) :86-95    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
地铁隧道基底饱水风化软岩动力响应及长期沉降研究
(1.华东交通大学江西省岩土工程基础设施安全与控制重点实验室,南昌 330013;2.江西省地下空间技术开发工程研究中心,南昌 330013;3.江西省建筑设计研究总院集团有限公司,南昌 330006;4.浙江大学滨海和城市岩土工程研究中心,杭州 310058;5.江西省港航建设投资集团有限公司石虎塘航电枢纽分公司,南昌 330008)
Study on Dynamic Response and Long-term Settlement of Water-saturated Weathered Soft Rocks at the Base of Subway Tunnels
(1. Jiangxi Key Laboratory of Geotechnical Infrastructure Safety and Control, East China Jiaotong University, Nanchang 330013;2. Jiangxi Research Center for Underground Space Technology Development and Engineering, Nanchang 330013; 3. Jiangxi Province Architectural Design and Research Institute Group Co., Ltd., Nanchang 330006; 4. Coastal and Urban Geotechnical Engineering Research Center, Zhejiang University, Hangzhou 310058; 5. Shihutang Navigation and Hydropower Hub Branch of Jiangxi Port and Maritime Construction Investment Group Co., Ltd., Nanchang 330008)
Download: PDF (4308KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为探究列车循环荷载作用下地铁隧道基底饱水风化软岩动力响应及长期沉降,选取南昌地铁基底不同风化程度泥质粉砂岩为研究对象,开展了室内动三轴试验,提出了考虑加载次数、动应力比、偏应力比等因素的全、中风化泥质粉砂岩的累积塑性应变数学模型,结合动力有限元软件进行动力响应分析。结果表明:在不同风化程度组合地层中,地铁隧道基底位于全风化软岩时,列车荷载产生的动应力、加速度竖向影响范围分别为16.0 m、7.0 m,位于中风化软岩时动应力、竖向影响范围分别为11.0 m、6.0 m;全风化软岩层的动应力和加速度峰值均大于中风化软岩层的;结合累积塑性应变数学模型,当地铁运营100 a,列车速度为110 km/h情况下,隧道基底位于全、中风化软岩累积沉降预测值分别为25.68 mm、17.98 mm;列车速度的改变对隧道底部风化软岩的长期沉降影响较小。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
石钰锋 1
2 曹成威 1
2 谈亦帆 3 徐长节 1
2
4 章立辰 5 黄 勇 5
关键词地铁隧道   风化泥质粉砂岩   室内试验   数值模拟   长期沉降     
Abstract: In order to investigate the dynamic response and long-term settlement of water-saturated weathered soft rocks at the base of subway tunnels under the cyclic loading of trains, this paper takes argillaceous siltstones with different degrees of weathering at the tunnel base of the Nanchang Metro as the research subject to carry out indoor dynamic triaxial tests. The paper proposes a mathematical model of cumulative plastic strain of fully-and moderately weathered argillaceous siltstones considering the number of loading, the dynamic stress ratio and the deviatoric stress ratio etc., and conducts a dynamic response analysis through dynamic finite element software. The results show that in combined strata with different degrees of weathering, the vertical influence ranges of dynamic stress and acceleration caused by the train loading are 16.0 m and 7.0 m respectively when the subway tunnel base is located in fully weathered soft rocks, and 11.0 m and 6.0 m respectively when located in moderately weathered soft rocks; also,the peak values of the dynamic stress and the acceleration in fully weathered soft rocks are both greater than those in moderately weathered soft rocks; furthermore, combined with the mathematical model of cumulative plastic strain,the predicted cumulative settlements of the tunnel base located in fully- and moderately weathered soft rocks are 25.68 mm and 17.98 mm, respectively, when the subway has been in operation for 100 years and the train is running at a speed of 110 km/h; and the variation in train running speed has less impact on the long-term settlement of the weathered soft rocks at the base of the tunnel.
KeywordsSubway tunnel,   Weathered argillaceous siltstone,   Indoor test,   Numerical simulation,   Long-term settle? ment     
基金资助:国家地区科学基金项目(51768020);国家自然科学基金面上项目(42177162);江西省交通运输厅重点工程科技项目(2019C0010, 2019C0011, 2020Z0001)
作者简介: 石钰锋(1985-),男,博士,副教授,主要从事隧道与地下工程方面的教学与科研工作,E?mail:s074811156@126.com.
引用本文:   
石钰锋 1, 2 曹成威 1, 2 谈亦帆 3 徐长节 1等 .地铁隧道基底饱水风化软岩动力响应及长期沉降研究[J]  现代隧道技术, 2022,V59(2): 86-95
SHI Yufeng1, 2 CAO Chengwei1, 2 TAN Yifan3 XU Changjie1 etc .Study on Dynamic Response and Long-term Settlement of Water-saturated Weathered Soft Rocks at the Base of Subway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 86-95
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I2/86
 
没有本文参考文献
[1] 张付军 1 胡 俊 2,3 段 宇 4 朱才辉 4.某富水断层隧道涌水治理方案优化分析及工程应用[J]. 现代隧道技术, 2022,59(2): 122-131
[2] 程咏春 1 曾祥纪 1 王振佳 1 王 栋 1 杨 蕴 2 吴咏敬 3 董 平 3, 4.岩溶隧道排水管结晶堵塞试验与数值模拟研究[J]. 现代隧道技术, 2022,59(2): 159-166
[3] 冯慧君.新建地铁隧道近距离下穿运营地铁线路施工及安全管控[J]. 现代隧道技术, 2022,59(2): 220-226
[4] 丁小彬 韩东霖.运营盾构隧道不同椭圆度变形情况下受力性能分析[J]. 现代隧道技术, 2022,59(1): 141-148
[5] 唐浪洲 1,2 于 丽 1,2 王玉锁 1,2 汪主洪 1,2 王明年 1,2.走滑断层错动量大小对铁路隧道结构安全性影响的数值分析[J]. 现代隧道技术, 2022,59(1): 214-224
[6] 陈绍华.秦岭马白山隧道新型紧急救援站结构型式研究[J]. 现代隧道技术, 2022,59(1): 35-41
[7] 徐公允 1 徐汪豪 1,2 姚志刚 1 方 勇 1 刘四进 3.基于三维RBD-DEM耦合方法的贯入角度对滚刀冲击影响分析[J]. 现代隧道技术, 2021,58(6): 77-84
[8] 王英学 1 骆 阳 1 张子为 1 王国义 2 宋相帅 1.圆弧刀盘土压平衡盾构施工沉降影响分析[J]. 现代隧道技术, 2021,58(6): 155-162
[9] 周稳弟 1,2 梁庆国 1,2 张晋东 3.某地铁车站洞桩法施工变形和结构受力分析[J]. 现代隧道技术, 2021,58(6): 121-128
[10] 刘夏临 张 军 陈必光 刘尚各 舒 恒.盾构隧道下穿城市高架桥桩基预加固方案研究[J]. 现代隧道技术, 2021,58(6): 218-224
[11] 宋 洋 1 王韦颐 2 杜春生 3.富水圆砾与泥岩复合地层泥水盾构超近接下穿既有地铁隧道掘进参数优化研究[J]. 现代隧道技术, 2021,58(5): 85-95
[12] 潘旭东 1 白云龙 1 白云飞 2 张志强 2 廖 霖 1.富水地层冻结法施工渗流场对温度场的影响规律研究[J]. 现代隧道技术, 2021,58(5): 122-128
[13] 冯敬辉 朱 颖.CRD法扩挖盾构隧道地层加固措施及周边环境变形影响分析[J]. 现代隧道技术, 2021,58(5): 204-212
[14] 王伟强 罗勇欢 孔令俊 张银喜 陈彦北.GINA止水带力学性能数值模拟与试验研究[J]. 现代隧道技术, 2021,58(5): 237-243
[15] 仇文革 万世付 高刚刚 赵海霖 戚幸鑫.砂卵石地层盾构隧道下穿铁路咽喉区地表沉降控制研究[J]. 现代隧道技术, 2021,58(5): 37-45
Copyright 2010 by 现代隧道技术