聚脲喷膜材料在隧道衬砌掉块病害整治中的试验研究
(1.中国铁路成都局集团公司,成都 610081;2.中铁二院工程集团有限责任公司,成都 610031; 3.中铁十一局集团有限公司,襄阳 441199;4.四川昕悦环保科技有限公司,成都 610094)
An Experimental Study on the Application of Spray-applied Polyurea Membrane in Remediation of Tunnel Lining Spalling
(1. China Railway Chengdu Group Co., Ltd., Chengdu 610081; 2. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 3. China Railway 11th Bureau Group Corporation Limited, Xiangyang 441199; 4. Sichuan Xinyue Environmental Protection Technology Co., Ltd., Chengdu 610094)
Download: PDF (5395KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对传统掉块病害整治工艺施工工序复杂、劳动强度大、施工速度慢、工效低和费用高等缺点,提出采用聚脲喷膜材料对隧道衬砌掉块病害进行整治。通过对聚脲喷膜材料承受掉块自重和空气动力学荷载的理论分析,以及现场建立隧道衬砌模型的实测试验,重点研究了聚脲喷膜材料的粘结强度和拉伸强度。试验表明,在试块自重和空气动力学效应约14 t荷载的共同作用下,厚度为5 mm的聚脲喷膜材料未发生拉伸断裂破坏,能够承托住衬砌掉块;加载过程中试块周边一定范围内的喷膜材料发生了剥离,表明剥离范围内喷膜聚脲材料与隧道衬砌混凝土表面之间粘结强度逐步降低。为防止隧道衬砌拱部掉块,可采取增加喷膜材料与混凝土之间的粘结强度或增加喷膜材料厚度等措施。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王 嵩 1 杨昌宇 2 许兴伍 1 李传富 1 王聚山 1 袁 勋 2 王 芳 2 陈 昂 等
关键词隧道   衬砌掉块   聚脲材料   空气动力学荷载   粘结强度     
Abstract: In view of the shortcomings of the traditional remediation process of spalling failures, such as complex construction process, high labor intensity, slow construction speed, low efficiency, and high cost etc., this paper proposes to use spray-applied polyurea membrane to remediate spalling failures of tunnel lining. The study carries out a theoretical analysis of the spalling block weight and aerodynamic load accommodated by the spray-applied polyurea membrane and establishes an on-site tunnel lining model for an actual measurement test, with a focus on the bonding strength and tensile strength of the spray-applied polyurea membrane. The test shows that the spray-applied polyurea membrane with a thickness of 5 mm does not break in tension under the joint action of the weight of the test blocks and the aerodynamic effect with a load of about 14 t, and is able to support the spalling of the lining.During the loading process, the spray-applied membrane peels within a certain range around the test blocks, indicating that the bonding strength between the spray-applied polyurea membrane and the concrete surface of the tunnel lining within the peeling range gradually decreases. It is recommended to take different measures to prevent the spalling of the tunnel vault lining, such as increasing the bonding strength between the spray-applied membrane and concrete or raising the thickness of the spray-applied membrane.
KeywordsTunnel,   Lining spalling,   Polyurea material,   Aerodynamic load,   Bonding strength     
作者简介: 王 嵩(1970-),男,高级工程师,主要从事铁路隧道方面的工作,E-mail:15283042700@163.com. 通讯作者:袁 勋(1993-),男,博士,工程师,主要从事隧道变形及岩层控制方面的研究工作,E-mail:xunyuan@stu.scu.edu.cn.
引用本文:   
王 嵩 1 杨昌宇 2 许兴伍 1 李传富 1 王聚山 1 袁 勋 2 王 芳 2 陈 昂 等 .聚脲喷膜材料在隧道衬砌掉块病害整治中的试验研究[J]  现代隧道技术, 2023,V60(2): 282-292
WANG Song1 YANG Changyu2 XU Xingwu1 LI Chuanfu1 WANG Jushan1 YUAN Xun2 WANG Fang2CHEN Ang2 YANG Yi1 WANG Hui1 GUO Jijun1 GUAN Qiang3 WANG Fuhai3 LIU Qiang1SUN Cheng4 ZHANG Yongqin4 .An Experimental Study on the Application of Spray-applied Polyurea Membrane in Remediation of Tunnel Lining Spalling[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(2): 282-292
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I2/282
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[3] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[4] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[5] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[6] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[7] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[8] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[9] 钟武霖1 韩兴博1 叶 飞1 王 涵1 曹校勇2 奚魏征2.隧道竖井钢波纹板支护风阻及优化设计研究[J]. 现代隧道技术, 2025,62(4): 197-207
[10] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[11] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[12] 刘力英1 魏立新1 喻志远2 杨旭东3 叶婷婷1.如意坊沉管隧道建造关键技术[J]. 现代隧道技术, 2025,62(4): 259-272
[13] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[14] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[15] 巴 金1 唐 刚2.白云质灰岩地层岩溶隧道支护结构受力特征及控制技术[J]. 现代隧道技术, 2025,62(4): 283-290
Copyright 2010 by 现代隧道技术