[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (1) :146-155    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
富水半成岩隧道综合降排水措施效果及稳定性分析
(1.云南交投集团云岭建设有限公司,昆明 650041;2. 同济大学土木工程学院地下建筑与工程系,上海 200092;3.同济大学 岩土及地下工程教育部重点实验室,上海 200092)
Analysis of the Results of General Dewatering and Drainage Measures and Ground Stability of Tunnel in Water-rich Hypabyssal Rock
(1. YCIC Yunling Construction Co., Ltd., Kunming 650041; 2. Department of Geotechnical Engineering, College of Civil Engineering,Tongji University, Shanghai 200092; 3. Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University, Shanghai 200092)
Download: PDF (6931KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究富水半成岩隧道综合降排水措施效果及对隧道稳定性的影响,依托临清高速公路王家寨隧道工程,结合现场抽水量与地层水位监测数据,建立富水半成岩隧道降排水有限元模型,计算分析综合降排水措施对孔隙水压/含水率分布规律的影响。基于不同含水率的土体剪切修正强度,采用顺序耦合方法对降排水后隧道稳定性进行分析。结果表明:采取综合降排水措施可有效降低掌子面含水率,提高土体强度,降水后现场变形量最大减小80%;地层水压随抽水量增加呈线性降低,含水率以反比例形式降低,左、右地表深井间形成降水漏斗;地表深井在降水中起主要作用,平均单井排水量达到400 m3/d后注浆圈内可出现非饱和状态;在王家寨隧道现场实施综合降排水措施后,半成岩强度提高,隧道左、右洞安全系数分别为1.99、1.62。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
段现彪1 黄煊博2
3 张清照2
3 徐永金1
关键词富水半成岩   隧道   综合降排水措施   含水率   隧道稳定性   数值分析     
Abstract: In order to investigate the results of the general dewatering and drainage measures for a tunnel in waterrich hypabyssal rock stratum and how these measures will affect the tunnel stability, the Wangjiazhai Tunnel of Lincang-Qingshuihe Expressway is used as an example in this study. By using the extracted water quantity on site and the stratum water level monitoring data, the finite element model for dewatering and drainage of tunnel in water-rich hypabyssal rock stratum is created, so as to calculate and analyze how the general dewatering and drainage measures will affect the distribution of pore water pressure/moisture content. Given the shear corrected strength of the soil masses with different moisture contents, the sequential coupling method is used to analyze the tunnel stability after dewatering and drainage. As the results indicate: the general dewatering and drainage measures will effectively reduce the moisture content of the tunnel face and increase the strength of soil mass. After dewatering, the deformation on site is reduced by 80% maximally. The stratum water pressure decreases linearly as the extracted water quantity increases, the moisture content decreases in inverse proportion, and a dewatering funnel is formed between the left and right deep wells. The deep wells play the main role in dewatering. When the average water discharge of single well reaches 400 m3/d, the unsaturation state appears in the grouting circle. After the general dewatering and drainage measures are implemented at the site of Wangjiazhai Tunnel, the strength of hypabyssal rock increases, and the safety factors of the left and right tunnels are 1.99 and 1.62.
KeywordsWater-rich hypabyssal rock,   Tunnel,   General dewatering and drainage measures,   Moisture content,   Tunnel stability,   Numerical analy     
基金资助:云南省交通运输厅科技创新及示范项目(云交科教便[2022]25号).
作者简介: 段现彪(1979-),男,高级工程师,主要从事公路隧道工程管理及设计工作,E-mail: 731348438@qq.com. 通讯作者:黄煊博(1997-),男,博士研究生,主要从事第三系半成岩隧道致灾机理等方面研究工作,E-mail:hxbo@tongji.edu.cn.
引用本文:   
段现彪1 黄煊博2, 3 张清照2, 3 徐永金1 .富水半成岩隧道综合降排水措施效果及稳定性分析[J]  现代隧道技术, 2024,V61(1): 146-155
DUAN Xianbiao1 HUANG Xuanbo2, 3 ZHANG Qingzhao2, 3 XU Yongjin1 .Analysis of the Results of General Dewatering and Drainage Measures and Ground Stability of Tunnel in Water-rich Hypabyssal Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(1): 146-155
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I1/146
 
没有本文参考文献
[1] 王 锋.基于SSA-LSTM模型的软岩隧道变形特征智能预测及应用研究[J]. 现代隧道技术, 2024,61(1): 56-66
[2] 刘学增1,2,3 杨子硕1 丁 爽2,3 房茂柳1.数字隧道[J]. 现代隧道技术, 2024,61(1): 1-15
[3] 李锦航1 宋战平1, 2 杨棚涛3 潘红伟1, 2 田小旭1, 2.隧道光面爆破炮孔优化及控制技术研究进展与展望[J]. 现代隧道技术, 2024,61(1): 36-47
[4] 包小华1,2,3 袁槐岑1,2,3 陈湘生1,2,3 沈 俊1,2,3 郭建波4 沈 翔1,2,3 崔宏志1,2,3.水下盾构隧道建造与运维技术研究现状与展望[J]. 现代隧道技术, 2024,61(1): 16-35
[5] 屈建荣1 敬雅文2 任兆丹1 熊 颖2 陈雪锋1 冯冀蒙2.基于围岩破坏特征的单洞四车道公路隧道围岩分级修正研究[J]. 现代隧道技术, 2024,61(1): 48-55
[6] 王 亮 张 浩.基于新能源车组成的特长水下公路隧道运营通风方案研究[J]. 现代隧道技术, 2024,61(1): 67-74
[7] 张 庆1 甄文战1 封 坤2.大直径盾构隧道下穿既有高速公路桥涵影响分析[J]. 现代隧道技术, 2024,61(1): 137-145
[8] 郝鹏飞.预制整体式弧形件施工质量控制指标研究[J]. 现代隧道技术, 2024,61(1): 245-251
[9] 黄煊博1, 2 丁文其1, 2 张清照1, 2.波纹钢衬砌法兰接头受弯力学性能数值分析[J]. 现代隧道技术, 2024,61(1): 96-106
[10] 靖一峰1 汪 波1 梅 洁1,2 熊文威1 孟庆余3.矿山法海底隧道水压力分布规律及限排设计研究[J]. 现代隧道技术, 2024,61(1): 84-95
[11] 肖明清1, 3 封 坤2 王少锋1, 3 杨 昊2 郭文琦2.内部结构施作方式对公轨合建盾构隧道内爆炸动力响应的影响研究[J]. 现代隧道技术, 2024,61(1): 107-116
[12] 郑镇跡1 黄书华2 陈湘生1 张 良2 刘皓铭1 盛 健2 苏 栋1.超大直径盾构主隧道机械法联络通道特殊衬砌管片受力特性分析[J]. 现代隧道技术, 2024,61(1): 117-124
[13] 周 骥1 王希浩2 康 松2 代镇洋2.海水与高温环境对膨润土泥浆流变特性的影响研究[J]. 现代隧道技术, 2024,61(1): 174-181
[14] 石钰锋1,2 蔡家城1 张 涛3 张晗秋4 李君贤1 顾大均5.冻结法地铁联络通道施工对邻近盾构隧道管片影响的测试分析[J]. 现代隧道技术, 2024,61(1): 190-199
[15] 曾 毅1 高 越2,3 吴沛霖2,3 张小龙1 付艳斌2,3.既有盾构隧道抬升模型试验研究[J]. 现代隧道技术, 2024,61(1): 200-207
Copyright 2010 by 现代隧道技术