[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (1) :146-155    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
富水半成岩隧道综合降排水措施效果及稳定性分析
(1.云南交投集团云岭建设有限公司,昆明 650041;2. 同济大学土木工程学院地下建筑与工程系,上海 200092;3.同济大学 岩土及地下工程教育部重点实验室,上海 200092)
Analysis of the Results of General Dewatering and Drainage Measures and Ground Stability of Tunnel in Water-rich Hypabyssal Rock
(1. YCIC Yunling Construction Co., Ltd., Kunming 650041; 2. Department of Geotechnical Engineering, College of Civil Engineering,Tongji University, Shanghai 200092; 3. Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education,Tongji University, Shanghai 200092)
Download: PDF (6931KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究富水半成岩隧道综合降排水措施效果及对隧道稳定性的影响,依托临清高速公路王家寨隧道工程,结合现场抽水量与地层水位监测数据,建立富水半成岩隧道降排水有限元模型,计算分析综合降排水措施对孔隙水压/含水率分布规律的影响。基于不同含水率的土体剪切修正强度,采用顺序耦合方法对降排水后隧道稳定性进行分析。结果表明:采取综合降排水措施可有效降低掌子面含水率,提高土体强度,降水后现场变形量最大减小80%;地层水压随抽水量增加呈线性降低,含水率以反比例形式降低,左、右地表深井间形成降水漏斗;地表深井在降水中起主要作用,平均单井排水量达到400 m3/d后注浆圈内可出现非饱和状态;在王家寨隧道现场实施综合降排水措施后,半成岩强度提高,隧道左、右洞安全系数分别为1.99、1.62。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
段现彪1 黄煊博2
3 张清照2
3 徐永金1
关键词富水半成岩   隧道   综合降排水措施   含水率   隧道稳定性   数值分析     
Abstract: In order to investigate the results of the general dewatering and drainage measures for a tunnel in waterrich hypabyssal rock stratum and how these measures will affect the tunnel stability, the Wangjiazhai Tunnel of Lincang-Qingshuihe Expressway is used as an example in this study. By using the extracted water quantity on site and the stratum water level monitoring data, the finite element model for dewatering and drainage of tunnel in water-rich hypabyssal rock stratum is created, so as to calculate and analyze how the general dewatering and drainage measures will affect the distribution of pore water pressure/moisture content. Given the shear corrected strength of the soil masses with different moisture contents, the sequential coupling method is used to analyze the tunnel stability after dewatering and drainage. As the results indicate: the general dewatering and drainage measures will effectively reduce the moisture content of the tunnel face and increase the strength of soil mass. After dewatering, the deformation on site is reduced by 80% maximally. The stratum water pressure decreases linearly as the extracted water quantity increases, the moisture content decreases in inverse proportion, and a dewatering funnel is formed between the left and right deep wells. The deep wells play the main role in dewatering. When the average water discharge of single well reaches 400 m3/d, the unsaturation state appears in the grouting circle. After the general dewatering and drainage measures are implemented at the site of Wangjiazhai Tunnel, the strength of hypabyssal rock increases, and the safety factors of the left and right tunnels are 1.99 and 1.62.
KeywordsWater-rich hypabyssal rock,   Tunnel,   General dewatering and drainage measures,   Moisture content,   Tunnel stability,   Numerical analy     
基金资助:云南省交通运输厅科技创新及示范项目(云交科教便[2022]25号).
作者简介: 段现彪(1979-),男,高级工程师,主要从事公路隧道工程管理及设计工作,E-mail: 731348438@qq.com. 通讯作者:黄煊博(1997-),男,博士研究生,主要从事第三系半成岩隧道致灾机理等方面研究工作,E-mail:hxbo@tongji.edu.cn.
引用本文:   
段现彪1 黄煊博2, 3 张清照2, 3 徐永金1 .富水半成岩隧道综合降排水措施效果及稳定性分析[J]  现代隧道技术, 2024,V61(1): 146-155
DUAN Xianbiao1 HUANG Xuanbo2, 3 ZHANG Qingzhao2, 3 XU Yongjin1 .Analysis of the Results of General Dewatering and Drainage Measures and Ground Stability of Tunnel in Water-rich Hypabyssal Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(1): 146-155
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I1/146
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[3] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[4] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[5] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[6] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[7] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[8] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[9] 钟武霖1 韩兴博1 叶 飞1 王 涵1 曹校勇2 奚魏征2.隧道竖井钢波纹板支护风阻及优化设计研究[J]. 现代隧道技术, 2025,62(4): 197-207
[10] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[11] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[12] 刘力英1 魏立新1 喻志远2 杨旭东3 叶婷婷1.如意坊沉管隧道建造关键技术[J]. 现代隧道技术, 2025,62(4): 259-272
[13] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[14] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[15] 巴 金1 唐 刚2.白云质灰岩地层岩溶隧道支护结构受力特征及控制技术[J]. 现代隧道技术, 2025,62(4): 283-290
Copyright 2010 by 现代隧道技术