天山胜利隧道施工关键技术创新与应用
(1.中国交通建设集团有限公司,北京100088;2.中交集团山区长大桥隧建设技术研发中心,西安710100; 3.中交二公局东萌工程有限责任公司,西安710119;4.中交第二公路工程局有限公司,西安710065)
Key Technological Innovation and Application in the Construction of Tianshan Shengli Tunnel
(1.China Communications Construction Co., Ltd., Beijing 100088; 2. Research and Development Center on Construction Technology of Long Bridges & Tunnels in Mountainous Areas, CCCC, Xi′an 710100; 3. CCCC-SHE Dong Meng Engineering Co., Ltd., Xi′an 710119;4. CCCC Second Highway Engineering Co., Ltd., Xi′an 710065)
Download: PDF (9513KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 新疆乌尉高速天山胜利隧道全长22.13 km,是目前世界在建最长的高速公路隧道,工程建设面临高寒、高海拔等复杂恶劣环境影响下建设20 km级超长大埋深高速公路山岭隧道的多项挑战。作为国内公路行业首次采用TBM辅助施工的三洞隧道模式,文章系统介绍天山胜利隧道在施工组织、物料运输、施工通风、TBM施工、竖井作业等方面的关键创新技术,创新性地提出适用于超特长隧道的“长隧超短打”三洞法施工组织、TBM无轨物料运输、TBM压注式混凝土工艺、洞顶正上方悬挂式连续皮带机、多工作面施工通风、深大竖井地面深部预注浆技术、短掘短衬作业法等新技术、新工艺、新设备,为今后超特长隧道施工提供系统参考,对提升超特长隧道建造水平具有重要意义。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
李宗平1 王帅帅2
4 毛锦波3 李亚隆3 牛晓宇2
4
关键词天山胜利隧道   施工组织   物料运输   TBM仰拱块   悬挂式皮带机   多功能胶轮车     
Abstract: Tianshan Shengli Tunnel on Urumqi-Yuli Expressway in the Xinjiang Uygur Autonomous Region is 22.13 km long, which is the longest highway tunnel under construction in the world, and the project is facing a number of challenges such as construction of 20 km super long and deep highway tunnel under the influence of high cold, high altitude and other complex and harsh environments. As the first three-tube tunnel using TBM-assisted construction in the domestic highway industry, this paper systematically introduces innovative key construction technologies in terms of the construction organization, material transportation, construction ventilation, TBM construction, shaft operation, etc. and innovatively proposes new technologies, techniques and equipment including the threetube tunnel construction organization for "long tunnel construction by multi working faces", TBM trackless material transport, TBM pressurized pumping concrete process, suspended continuous belt conveyor on the roof, multi-working face construction ventilation, deep pre-grouting on the ground surface of the deep shaft, short excavation with short lining operation and others, which will provide a systematic reference for the future construction of ultra-long tunnels,and is of great significance for upgrading the construction level of the ultra-long tunnels.
KeywordsTianshan Shengli Tunnel,   Construction organization,   Material transport,   TBM inverted arch block,   Sus? pended belt conveyor,   Multifunctional service vehicle     
作者简介: 李宗平(1971-),男,硕士研究生,教授级高级工程师,主要从事隧道及地下工程研究工作,Li_ZOngping@126.com. 通讯作者:王帅帅(1988-),男,博士,高级工程师,主要从事隧道与地下工程领域的施工及管理工作,E-mail:8366wangshuai@sina.com.
引用本文:   
李宗平1 王帅帅2, 4 毛锦波3 李亚隆3 牛晓宇2, 4 .天山胜利隧道施工关键技术创新与应用[J]  现代隧道技术, 2024,V61(2): 241-253
LI Zongping1 WANG Shuaishuai2, 4 MAO Jinbo3 LI Yalong3 NIU Xiaoyu2, 4 .Key Technological Innovation and Application in the Construction of Tianshan Shengli Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(2): 241-253
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I2/241
 
没有本文参考文献
Copyright 2010 by 现代隧道技术