[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2020, Vol. 57 Issue (3) :1-8    DOI:
特约稿 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于系统工程方法论的川藏铁路隧道工程建设管理探讨
(1中铁二局集团有限公司,成都 610032;2 深圳大学广东省深地科学与地热能开发利用重点实验室 深地科学与绿色能源研究院 土木与交通工程学院,深圳 518060)
Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology
(1 China Railway No.2 Engineering Group Co.,Ltd, Chengdu 610032;2 Guangdong Provincial Key Laboratory of Deep Earth Sciences and Geothermal Energy Exploitation and Utilization, Institute of Deep Earth Sciences and Green Energy, College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060)
Download: PDF (2004KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为全面提升应对川藏铁路隧道工程建设中复杂问题的能力和手段,以时间维、逻辑维、知识维以及环境维为基础结构,建立了基于系统工程方法论的川藏铁路雅安至林芝段隧道工程建设管理体系。结合川藏铁路隧道工程面临的主要挑战,根据时间维的不同阶段和逻辑维的目标实现,通过知识维的技术积累和研究攻关,系统总结了针对工程勘察与设计、特殊不良地质、施工组织和建设管理等重点问题的对策措施,以期为川藏铁路雅安至林芝段隧道工程的建设管理提供参考。研究表明:(1)隧道工程在川藏铁路全线占据主导地位,应建立基于系统工程方法论的全周期建设管理体系;(2)川藏铁路隧道工程的技术挑战主要是特殊复杂的地质环境,相关解决方案应在可研和设计阶段提出,在实施阶段深化应用研究,以确保对策措施的有效可靠;(3)鉴于川藏铁路隧道工程严酷的环境条件、极端的地质挑战和超长的建设周期,需要更高水平的“四化”支撑和突破性管理新;(4)鉴于川藏铁路隧道工程建设管理问题的复杂性,任何一个参建方都不可能独立应对这一巨大系统工程的管理风险,需要建立更高层次的全周期一体化管理机制,实行更严格的生态环境保护,组织更有力的科技创新支撑。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
马 辉 1 高明忠 2
关键词:   
Abstract: In order to comprehensively improve the ability and means to deal with the complex problems in the con? struction of the Sichuan-Tibet railway tunnel project, a tunnel construction management system for the Ya ′an-Linzhi section of the Sichuan-Tibet Railway is established based on system engineering methodology by taking time dimension, logical dimension, knowledge dimension and environmental dimension as the basic structure. Aiming at the main challenges faced by the Sichuan-Tibet railway tunnel project, it systematically summarizes the countermeasures for the key issues of engineering survey and design, special unfavorable geological condition, construction organization and management in view of the different stages of time dimension, goals of logical dimension and through technology accumulation and research of knowledge dimension,providing a reference for the construction and management of tunnel project of Ya′an-Linzhi section. The research indicates:(1) the tunnel project is critical for the entire Sichuan-Tibet Railway, and so a system engineering methodology based full-cycle construction management system should be established; (2) the main technical challenge of the Sichuan-Tibet railway tunnel is the special complex geological condition, related solutions should be put forward in the feasibility study and design stages and further application research should be conducted in implementation stage to guarantee effectiveness and reliability of the countermeasures; (3) in light of the harsh environmental conditions, extreme geological challenges and super-long construction period of the Sichuan-Tibet Railway tunnel, a higher level of“Four Modernizations”and breakthrough in management innovation are required; (4) aiming at the complexity of the construction and management of the SichuanTibet railway tunnel, no participant can independently handle the management risks of this huge system project and it is necessary to establish a higher-level full-cycle integrated management mechanism, implementing stricter ecological environmental protection and organizing stronger scientific and technological innovation support.
KeywordsSystem engineering methodology,   Sichuan-Tibet railway,   Tunnel engineering,   Construction management,   Construction organization,   Full-cycle integrated management mechanism     
基金资助:基金项目:四川省科技计划重点研发项目-川藏铁路建设重大关键技术难题创新研究(2019YFG0001)
作者简介: 作者简介:马 辉(1971-),男,教授级高级工程师,主要从事地下工程与隧道工程方面的研究工作,E-mail:329439972@qq.com.
引用本文:   
马 辉 1 高明忠 2 .基于系统工程方法论的川藏铁路隧道工程建设管理探讨[J]  现代隧道技术, 2020,V57(3): 1-8
MA Hui1 GAO Mingzhong2 .Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 1-8
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I3/1
 
没有本文参考文献
[1] 王明年 1,2 郭晓晗 1,2 于 丽 1,2 李春荟 1,2 陈树汪 3.高海拔特长铁路隧道紧急救援站位置选型研究[J]. 现代隧道技术, 2020,57(3): 9-14
[2] 李 畅 1,2,3 王 刚 1,2 仇文革 1,2,3 龚 伦 1,2 赵迎春 4 王秋会 4.限阻器在高水平地应力隧道支护中的研究与应用[J]. 现代隧道技术, 2020,57(3): 15-29
[3] 廖 军 1 董 谦 1 梁洪永 2 简 波 2 石豫川 1,3 龚洪苇 1.近水平红层公路隧道围岩分级指标初探[J]. 现代隧道技术, 2020,57(3): 25-29
[4] 卢 松 1,2 汪 旭 1,2 李苍松 1,2 孟 露 1,2.应用HSP法的TBM隧道施工地质预报技术研究[J]. 现代隧道技术, 2020,57(3): 30-35
[5] 钟祖良 1,2 高国富 1,2 陈 鹏 1 严 如 1.重庆两江船舶观光隧道设计方案探讨[J]. 现代隧道技术, 2020,57(3): 36-42
[6] 黄福杰 何则干 张为民 刘珊珊.BIM技术在沉管隧道工程设计中的应用研究[J]. 现代隧道技术, 2020,57(3): 43-48
[7] 唐晓松 1,2 郑颖人 3 王永甫 1.有限元强度折减法在隧道施工稳定分析与控制中的应用[J]. 现代隧道技术, 2020,57(3): 49-55
[8] 吴 波 1, 2 兰扬斌 1,2 杨仕升 1,2 杨建新 3 庞晓瑜 3.基于强度折减动力分析法的围岩稳定性研究[J]. 现代隧道技术, 2020,57(3): 56-64
[9] 周翠英 1, 2 李 昂 2,3 刘 镇 1,2.平行褶皱构造对隧道围岩变形的影响研究[J]. 现代隧道技术, 2020,57(3): 65-74
[10] 马 莉 1 刘亚朋 2 李 盛 3,4 吕文达 5 谢 超 3,4 代金鹏 3,4.不同减载措施下高填黄土拱形明洞结构受力研究[J]. 现代隧道技术, 2020,57(3): 75-84
[11] 张丙武 1 张 鹏 1 戴振华 2 吴银河 2 罗 卫 2.河底地铁盾构隧道管片受力特征分析[J]. 现代隧道技术, 2020,57(3): 85-90
[12] 隋 心 1 张正维 1 闵 绚 2 DOWNIE Steven 3 PADHANI Shahid3 赵丽博 4.超长GIL综合管廊SF6气体泄露模拟研究[J]. 现代隧道技术, 2020,57(3): 91-98
[13] 张珂峰.前伏溶洞巷道开挖突水数值模拟研究[J]. 现代隧道技术, 2020,57(3): 99-107
[14] 张 研 1, 2 王 伟 2 邓雪沁 2.基于相关向量机的TBM掘进速度预测模型[J]. 现代隧道技术, 2020,57(3): 108-114
[15] 吴 波.层状砂岩层城市大断面公路隧道爆破施工优化研究[J]. 现代隧道技术, 2020,57(3): 115-121
Copyright 2010 by 现代隧道技术