[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (6) :251-260    DOI:
安全防灾与病害整治 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
无中墙连拱隧道减振技术及安全控制标准
(1.中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071;2.中国科学院大学,北京 100049;3.攀枝花青杠坪矿业有限公司,攀枝花 617200)
Vibration Reduction Technology and Safety Control Standards for Multi-arch Tunnels without Middle Walls
(1. State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071; 2. University of Chinese Academy of Sciences, Beijing 100049; 3. Panzhihua Qingjiabing Mining Co. Ltd.,Panzhihua 617200)
Download: PDF (4242KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 无中墙连拱隧道先行洞围岩及支护结构易在后行洞爆破时受到损伤与破坏。对此,依托云南勐绿高速公路隧道工程,首先结合现场振动监测和隧道支护结构爆破损伤模拟,对先行洞衬砌的振动响应及损伤分布进行分析,然后对预留隔振岩柱和铺设泡沫混凝土等措施的减振效果进行评价,确定合理的隔振柱厚度及减振层位置,并提出一种可靠的连拱隧道爆破安全控制标准方法。研究结果表明:(1)增加开挖区隔振柱厚度可以有效减小衬砌振动与损伤,考虑到后续针对预留岩柱的二次爆破施工,建议保留1 m宽的岩柱;(2)减振层铺设于初期支护外侧时衬砌振动明显减小,但从减小衬砌损伤和提高隧道整体稳定性角度出发,建议将泡沫混凝土减振层铺设于先行洞二次衬砌外侧;(3)连拱隧道爆破安全控制标准为先行洞迎爆侧拱腰处质点峰值振动速度不超过25 cm/s。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
孟德生1
2 彭小东3 杨光华3
关键词连拱隧道   爆破减振   隔振柱   减振层   混凝土塑性损伤   安全控制     
Abstract: The existing lining and supporting structure of the first excavated tunnel in multi-arch tunnels without middle walls are prone to damage and failure due to blasting in the subsequent excavated tunnel. To address this issue, this study, based on the Mengxing—Lvchun Expressway Tunnel Project in Yunnan, analyzes the vibration response and damage distribution of the lining in the first excavated tunnel through field vibration monitoring and blasting damage simulation of the tunnel support structure. The vibration reduction effects of measures such as reserving isolation rock columns and laying foam concrete layers are evaluated. Reasonable thicknesses for isolation columns and the optimal positions of vibration reduction layers are determined, and a reliable safety control standard for blasting in multi-arch tunnels is proposed. The results show that: (1) Increasing the thickness of the isolation rock column in the excavation area can effectively reduce the lining vibration and damage. Considering subsequent secondary blasting for the reserved rock column, it is recommended to retain a 1 m wide rock column. (2) Placing the vibration reduction layer outside the initial support can significantly reduce the lining vibration. However, to minimize lining damage and enhance the overall tunnel stability, it is recommended to place the foam concrete vibration reduction layer outside the secondary lining of the first excavated tunnel. (3) The safety control standard for blasting in multi-arch tunnels is that the peak particle velocity (PPV) at the arch waist on the blasting side of the first excavated tunnel should not exceed 25 cm/s.
KeywordsMulti-arch tunnel,   Blasting vibration reduction,   Isolation column,   Vibration reduction layer,   Concrete plastic damage,   Safety control     
作者简介: 孟德生(1999-),男,硕士研究生,主要从事岩石动力学与岩体动态响应方面的研究工作,E-mail:mengdesheng21@mails.ucas.ac.cn.
引用本文:   
孟德生1, 2 彭小东3 杨光华3 .无中墙连拱隧道减振技术及安全控制标准[J]  现代隧道技术, 2024,V61(6): 251-260
MENG Desheng1, 2 PENG Xiaodong3 YANG Guanghua3 .Vibration Reduction Technology and Safety Control Standards for Multi-arch Tunnels without Middle Walls[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(6): 251-260
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I6/251
 
没有本文参考文献
[1] 张明书1 姚 琛1 吴贤国2 陈虹宇3 冯宗宝2 杨 赛2.基于BO-Adam-Bi-LSTM的盾构下穿既有隧道变形预测及调控[J]. 现代隧道技术, 2024,61(6): 92-99
[2] 邱 伟1 曾庆成1 欧阳剑1 沐海星2 郭文琦2 封 坤2 胡大伟3.盾构隧道凹凸榫-斜螺栓构造环缝抗剪力学性能研究[J]. 现代隧道技术, 2024,61(6): 129-138
[3] 王明江 1 慈新航 2 陈俊武 3 朱长江 1 杨 峰 2.浅埋大偏压双洞六车道无中导洞连拱隧道进洞施工技术[J]. 现代隧道技术, 2023,60(1): 241-248
[4] 卢小刚 1 耿建宇 1 庞 雷 1 范金海 1 李良勇 1 方亚彪 2,3 王 峰 2,3.无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析[J]. 现代隧道技术, 2022,59(5): 80-90
[5] 张丽丽 1 单 琳 1 郭 飞 1 蔡 振 1 韩瑞林 1 张 旭 2,3,4 王智广 2 许有俊 2,3,4.小曲线半径叠落盾构隧道近接施工安全控制研究[J]. 现代隧道技术, 2022,59(3): 253-264
[6] 贾艳领 1,2,3 周绍文 2,3 王 刚 2,3 周维政 2,3 杨昆光 2,3.既有隧道扩建为双连拱隧道中隔墙受力特征研究[J]. 现代隧道技术, 2021,58(3): 130-138
[7] 钱正富 1 徐金峰 2,3 周应新 1,2,3 周 彪 2,3 谢雄耀 2,3.红层软岩无中导洞连拱隧道爆破振动控制技术研究[J]. 现代隧道技术, 2020,57(3): 167-174
[8] 杨果林 1 胡 敏 1 申宗球 2 杨 杰 2.大跨连拱隧道复合式中墙承载模式研究[J]. 现代隧道技术, 2020,57(1): 136-141
[9] 邱军领 1 赖金星 1,2 郭春霞 2 樊浩博 1 谢永利 1.黄土连拱隧道中墙力学特征现场测试与分析[J]. 现代隧道技术, 2019,56(2): 134-
[10] 赖金星 余德强 冯志华 邱军领 樊浩博.黄土连拱隧道支护结构力学特性现场试验[J]. 现代隧道技术, 2017,54(5): 180-191
[11] 李海军 1 张万斌 1 王明年 2.隐式中墙连拱隧道修建优化设计[J]. 现代隧道技术, 2016,53(5): 183-187
[12] 陈智强.城市连拱隧道下穿挡墙段出洞方案优化与监测分析[J]. 现代隧道技术, 2016,53(3): 157-163
[13] 来弘鹏1, 2, 遆甲峰3, 张宏光1, 谢永利1.浅埋大断面土质隧道下穿明长城施工安全控制技术研究[J]. 现代隧道技术, 2015,52(1): 190-196
[14] 丁智1, 2, 何佳威1, 陈春来1, 魏纲1, 张孟雅2.连拱隧道中隔墙应力实测分析[J]. 现代隧道技术, 2014,51(5): 129-133
[15] 刘学彦1, 2, 袁大军1, 2, 乔国刚3, 王, 飞1, 2, 陈海丰4.盾构长距离穿越房屋安全技术研究[J]. 现代隧道技术, 2014,51(2): 147-151
Copyright 2010 by 现代隧道技术