无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析
(1.四川省交通建设集团股份有限公司,成都 610000;2.西南交通大学交通隧道工程教育部重点实验室,成都 610031;3.西南交通大学土木工程学院,成都 610031)
Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift
(1. Sichuan Communications Construction Group Co., Ltd., Chengdu 610000; 2. Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3. School of Civil Engineering, Southwest Jiaotong University ,Chengdu 610031 )
Download: PDF (7509KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究无中导洞法双连拱隧道后行洞施工力学行为及支护时机、空间效应的影响,以宜金高速黄角坪隧道工程为依托,采用数值计算方法,对后行洞不同开挖进尺、不同台阶长度和不同左右导洞掌子面错距等参数进行深入研究,进一步分析这些参数对后行洞围岩位移、初期支护受力特征和先行洞二次衬砌受力特征的影响。结果表明:随着开挖进尺、台阶长度和左右导洞掌子面错距的增大,后行洞的围岩位移、初期支护主应力和先行洞二次衬砌主应力均显著增大;台阶长度和左右导洞掌子面错距对后行洞初期支护和先行洞二次衬砌主应力的影响非常显著,在实际施工中应严格控制。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
卢小刚 1 耿建宇 1 庞 雷 1 范金海 1 李良勇 1 方亚彪 2
3 王 峰 2
3
关键词双连拱隧道   无中导洞法   施工参数   力学行为   数值模拟     
Abstract: In order to study the construction mechanical behavior of the subsequent tunnel tube and the influence of the supporting time and spatial effect of double-arch tunnel without middle drift, based on the Huangjiaoping doublearch tunnel project of Yi-Jin Expressway, numerical simulation method is adopted, and the construction parameters such as excavation advance, bench length and different staggered distance of left and right faces of the subsequent tunnel are studied. The influence of these parameters on the displacement of surrounding rock, the mechanical characteristics of the initial support of the subsequent tunnel and the secondary lining of the advanced tunnel is further analyzed. The results show that with the increase of the excavation advance, the bench length and the staggered distance of left and right faces of the subsequent tunnel, the surrounding rock displacement, the principal stress of the initial support of the subsequent tunnel and the principal stress of the secondary lining of the advanced tunnel increase dramatically. Among them, the bench length and the staggered distance of left and right faces of the subsequent tunnel have significant effect on the principal stress of the initial support of the subsequent tunnel and the secondary lining of the advanced tunnel, and both shall be strictly controlled in actual construction.
KeywordsDouble-arch tunnel,   Tunnel construction without middle drift,   Construction parameters,   Mechanical be? havior,   Numerical analysis     
作者简介: 卢小刚(1981-),男,高级工程师,主要从事土木工程施工技术管理工作,E-mail: luxiaogang0521@163.com.
引用本文:   
卢小刚 1 耿建宇 1 庞 雷 1 范金海 1 李良勇 1 方亚彪 2, 3 王 峰 2, 3 .无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析[J]  现代隧道技术, 2022,V59(5): 80-90
LU Xiaogang1 GENG Jianyu1 PANG Lei1 FAN Jinhai1 LI Liangyong1 FANG Yabiao2, 3 WANG Feng2, 3 .Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(5): 80-90
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I5/80
 
没有本文参考文献
[1] 徐 宏 1 叶 飞 2 刘 奇 1 田黎明 1 安 欢 1.大断面矩形顶管施工地层变形及顶进参数控制研究[J]. 现代隧道技术, 2022,59(6): 97-105
[2] 宋战平 1,2,3 裴佳锋 1,3 潘红伟 2,4 孙 泽 1,3 丁立波 5.浅埋偏压隧道洞口段超前大管棚支护效果分析[J]. 现代隧道技术, 2022,59(6): 86-96
[3] 汪 微 1,2 李献民 1 孙新海 1,2.互层软质岩隧道系统锚杆支护效用数值模拟研究[J]. 现代隧道技术, 2022,59(5): 99-107
[4] 雷中岱 1,2 孔新立 3 王文烨 3 闫治国 1,2.大跨度扁平隧洞围岩松动圈数值模拟研究[J]. 现代隧道技术, 2022,59(5): 41-46
[5] 赵森森 张冬梅 黄忠凯.大直径盾构隧道分布式凹凸榫受力特性[J]. 现代隧道技术, 2022,59(5): 54-62
[6] 刘招伟.卵石-漂石地层盾构隧道穿越铁路编组工程技术研究[J]. 现代隧道技术, 2022,59(4): 226-233
[7] 于建游 1 姜逸帆 2 林 铭 2 刘建其 1 蔡李斌 2 蒋新政 2 王志杰 2 周 平 2.考虑渗流与裂隙作用的寒区隧道保温层厚度计算方法[J]. 现代隧道技术, 2022,59(4): 108-117
[8] 李伟林 1 章 光 1 朱应伟 1 胡少华 1,2.不同分岔角的卜型隧道施工通风三维数值模拟研究[J]. 现代隧道技术, 2022,59(4): 158-166
[9] 文彦鑫 1 霍永鹏 2 吴 悦 2 常 鑫 1 张 天 2 晏启祥 2.高水压盾构隧道管片密封垫装配力与防水性能研究[J]. 现代隧道技术, 2022,59(4): 273-
[10] 唐 艳.铁路隧道下穿高速公路工程风险评估管理方法研究[J]. 现代隧道技术, 2022,59(3): 220-226
[11] 苗晨阳 1 黄强兵 1,2 苟玉轩 1 滕宏泉 3 贾少春 4.地裂缝场地盾构隧道下穿施工对既有管廊的影响研究[J]. 现代隧道技术, 2022,59(3): 155-165
[12] 朱牧原 1 魏力峰 1 方 勇 1 付 强 2 高腾达 2 蒲 松 1.超大直径盾构隧道下穿黄河大堤沉降分析与控制研究[J]. 现代隧道技术, 2022,59(3): 211-219
[13] 隗志远 1 冯冀蒙 2 虞龙平 2.地铁车站双层初期支护拱盖法施工过程力学行为研究[J]. 现代隧道技术, 2022,59(3): 265-274
[14] 喻凌峰.山岭隧道不同埋深的结构动力响应特征及震害机理研究[J]. 现代隧道技术, 2022,59(3): 227-235
[15] 石钰锋 1,2 曹成威 1,2 谈亦帆 3 徐长节 1,2,4 章立辰 5 黄 勇 5.地铁隧道基底饱水风化软岩动力响应及长期沉降研究[J]. 现代隧道技术, 2022,59(2): 86-95