无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析
(1.四川省交通建设集团股份有限公司,成都 610000;2.西南交通大学交通隧道工程教育部重点实验室,成都 610031;3.西南交通大学土木工程学院,成都 610031)
Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift
(1. Sichuan Communications Construction Group Co., Ltd., Chengdu 610000; 2. Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3. School of Civil Engineering, Southwest Jiaotong University ,Chengdu 610031 )
Download: PDF (7509KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究无中导洞法双连拱隧道后行洞施工力学行为及支护时机、空间效应的影响,以宜金高速黄角坪隧道工程为依托,采用数值计算方法,对后行洞不同开挖进尺、不同台阶长度和不同左右导洞掌子面错距等参数进行深入研究,进一步分析这些参数对后行洞围岩位移、初期支护受力特征和先行洞二次衬砌受力特征的影响。结果表明:随着开挖进尺、台阶长度和左右导洞掌子面错距的增大,后行洞的围岩位移、初期支护主应力和先行洞二次衬砌主应力均显著增大;台阶长度和左右导洞掌子面错距对后行洞初期支护和先行洞二次衬砌主应力的影响非常显著,在实际施工中应严格控制。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
卢小刚 1 耿建宇 1 庞 雷 1 范金海 1 李良勇 1 方亚彪 2
3 王 峰 2
3
关键词双连拱隧道   无中导洞法   施工参数   力学行为   数值模拟     
Abstract: In order to study the construction mechanical behavior of the subsequent tunnel tube and the influence of the supporting time and spatial effect of double-arch tunnel without middle drift, based on the Huangjiaoping doublearch tunnel project of Yi-Jin Expressway, numerical simulation method is adopted, and the construction parameters such as excavation advance, bench length and different staggered distance of left and right faces of the subsequent tunnel are studied. The influence of these parameters on the displacement of surrounding rock, the mechanical characteristics of the initial support of the subsequent tunnel and the secondary lining of the advanced tunnel is further analyzed. The results show that with the increase of the excavation advance, the bench length and the staggered distance of left and right faces of the subsequent tunnel, the surrounding rock displacement, the principal stress of the initial support of the subsequent tunnel and the principal stress of the secondary lining of the advanced tunnel increase dramatically. Among them, the bench length and the staggered distance of left and right faces of the subsequent tunnel have significant effect on the principal stress of the initial support of the subsequent tunnel and the secondary lining of the advanced tunnel, and both shall be strictly controlled in actual construction.
KeywordsDouble-arch tunnel,   Tunnel construction without middle drift,   Construction parameters,   Mechanical be? havior,   Numerical analysis     
作者简介: 卢小刚(1981-),男,高级工程师,主要从事土木工程施工技术管理工作,E-mail: luxiaogang0521@163.com.
引用本文:   
卢小刚 1 耿建宇 1 庞 雷 1 范金海 1 李良勇 1 方亚彪 2, 3 王 峰 2, 3 .无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析[J]  现代隧道技术, 2022,V59(5): 80-90
LU Xiaogang1 GENG Jianyu1 PANG Lei1 FAN Jinhai1 LI Liangyong1 FANG Yabiao2, 3 WANG Feng2, 3 .Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(5): 80-90
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I5/80
 
没有本文参考文献
[1] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[2] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[3] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[4] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[5] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[6] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[7] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[8] 杨绍玉1 王啸天2 张培元1 刘胜臣1 李树忱2 李洛宁2.钻爆法隧道喷膜防水技术研究综述[J]. 现代隧道技术, 2025,62(4): 1-14
[9] 王帅帅1 傅一帆2,3 徐 勇1 史经峰1 郭 春2,3.通过接力风机进行风量分配的隧道施工风仓式通风参数研究[J]. 现代隧道技术, 2025,62(3): 240-248
[10] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[11] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[12] 郑腾跃1 王树英1,2 袁 潇1.基于数值模拟与机器学习的盾构下穿既有线施工参数优化[J]. 现代隧道技术, 2025,62(3): 100-107
[13] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[14] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[15] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
Copyright 2010 by 现代隧道技术