超大直径浅埋盾构隧道施工期管片结构力学响应研究
(1.杭州富阳城市建设投资集团有限公司,杭州 311400;2.中铁第四勘察设计院集团有限公司,武汉 430063; 3.浙江大学建筑工程学院,杭州 310058)
Study on the Mechanical Response of Tunnel Segment Structures in Ultra-large Diameter Shallow-buried Shield Tunnels during Construction
(1. Hangzhou Fuyang Urban Construction Investment Group Co., Ltd., Hangzhou 311400; 2. China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063; 3. College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058)
Download: PDF (8862KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为探明超大直径浅埋盾构隧道在施工期复杂荷载作用下管片结构的力学响应,以秦望通道为工程背景,综合考虑施工荷载组合情况和边界条件,建立三维精细化计算模型,对不同注浆压力和不同浆液凝固时间条件下施工期隧道管片的纵向上浮、环间错台、横向变形、纵向内力和损伤情况进行对比分析。研究结果表明:管片拱顶和拱底上浮量均随注浆压力的增大和浆液凝固时间的延长而增大,浆液凝固时间对管片上浮的影响更显著;管片错台变化可分为上错台段、过渡段、下错台段和平稳段;管片最大错台量出现在盾构段与流体段连接处和流体段与成型段连接处;与流体段管片相比,盾构段和成型段前半段管片更容易发生横向变形,且随注浆压力增大而增大;管片拉损伤集中于流体段隧道外侧拱肩处以及隧道内侧拱腰以下45°处。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
万东兴1 张 迪2 孙 峰2 潘辰昕3 朱振伟1 徐晓峰1 何 超1 申屠琪1
关键词超大直径   盾构隧道   管片上浮   环间错台   数值模拟     
Abstract: To explore the mechanical response of tunnel segment structures under complex loads during the con? struction of ultra-large diameter shallow-buried shield tunnels, this study uses the Qinwang River-crossing project as the engineering background. A three-dimensional refined calculation model was established considering the construction load combinations and boundary conditions. The model was used to analyze and compare the longitudinal uplift, circumferential misalignment, lateral deformation, longitudinal internal forces, and damage conditions of the tunnel segments under different grouting pressure and grout setting time conditions. The results show that: (1) The uplift of both the crown and the invert arch of the tunnel segment lining ring increases with the increase in grouting pressure and the extension of the grout setting time, with the grout setting time having a more significant impact on the uplift. (2) The misalignment of the segment can be divided into the upper misalignment section, transition section, lower misalignment section, and the stable section. The maximum misalignment occurs at the junction between the segments in shield shell section and in the fluid grout section, and between the segments in the fluid grout section and in the set grout section. (3) Compared to the segments in the fluid grout section, the segments in the shield shell section and the front half of segments in the set gout section are more prone to lateral deformation, which increases with the grouting pressure. (4) The tensile damage in the segments concentrates on the outer spandrel of segments in the fluid grout section and at 45° below the inner waist of the tunnel.
KeywordsUltra-large diameter,   Shield tunnel,   Segment uplift,   Circumferential misalignment,   Numerical simula? tion     
作者简介: 万东兴(1967-),男,高级工程师,主要从事工程地质及结构抗震方面的工作,E-mail: 188920601@qq.com. 通讯作者:潘辰昕(2000-),男,硕士研究生,主要从事隧道工程方面的研究工作,E-mail:1216793184@qq.com.
引用本文:   
万东兴1 张 迪2 孙 峰2 潘辰昕3 朱振伟1 徐晓峰1 何 超1 申屠琪1 .超大直径浅埋盾构隧道施工期管片结构力学响应研究[J]  现代隧道技术, 2025,V62(1): 135-146
WAN Dongxing1 ZHANG Di2 SUN Feng2 PAN Chenxin3 ZHU Zhenwei1 XU Xiaofeng1 HE Chao1 SHEN Tuqi1 .Study on the Mechanical Response of Tunnel Segment Structures in Ultra-large Diameter Shallow-buried Shield Tunnels during Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 135-146
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I1/135
 
没有本文参考文献
[1] 蔡浩明.基岩爆破预处理对盾构掘进状态及岩体破碎机理的影响[J]. 现代隧道技术, 2025,62(1): 192-200
[2] 周 斌1,2,3,4 奉建军1,2,3,4 温晓凯3,4 冉 弥5.基于点云数据的盾构隧道错台量自动检测技术研究[J]. 现代隧道技术, 2025,62(1): 83-91
[3] 易壮鹏 王申奥 唐新超 陈志威.基于CFD的多车道宽幅悬浮隧道管体涡激振动特性研究[J]. 现代隧道技术, 2025,62(1): 92-102
[4] 沐海星1 封 坤1 郭文琦1 杨绍毅1 张亮亮2.超大直径盾构隧道管片结构力学行为与破坏特征研究[J]. 现代隧道技术, 2025,62(1): 125-134
[5] 陈 旺1 彭焱锋1 刘维正2 张思宇2 陈常辉1.三孔顶管上穿施工对既有隧道与地表变形影响分析[J]. 现代隧道技术, 2025,62(1): 170-182
[6] 张成友1 汪 波1 杜泽昊1 高筠涵1 谭力豪2.不同锚杆支护体系防岩爆适宜性分析与锚杆参数优化研究[J]. 现代隧道技术, 2024,61(6): 64-73
[7] 匡 亮1 粟 威1 陶伟明1 田四明2 申玉生3 黎 旭2 汪辉武1.跨走滑断层隧道结构影响分区及设防范围研究[J]. 现代隧道技术, 2024,61(6): 45-54
[8] 吴贝钰1 谢渭平2 林星涛1,3,4 高 晨2 苏 栋1,3,4 陈湘生1,3,4.并行盾构下穿CFG桩加固高铁路基的沉降规律研究[J]. 现代隧道技术, 2024,61(6): 139-147
[9] 邱 伟1 曾庆成1 欧阳剑1 沐海星2 郭文琦2 封 坤2 胡大伟3.盾构隧道凹凸榫-斜螺栓构造环缝抗剪力学性能研究[J]. 现代隧道技术, 2024,61(6): 129-138
[10] 王圣涛1 张俊儒2 彭 波1 燕 波3.拱隧一体结构跨越巨型溶洞段处治技术研究[J]. 现代隧道技术, 2024,61(5): 263-273
[11] 陈湘生1,2,3 陈伟杰2 李荣康2 顾问天1 卢 院1 李 强2,3 苏 栋2,3.盾构隧道足尺试验装配式加载平台的设计与应用[J]. 现代隧道技术, 2024,61(5): 1-9
[12] 魏立新1 杨春山1 刘力英1 宋棋龙2,3 苏 栋2,3.上硬下软复合地层大直径盾构掌子面稳定性研究[J]. 现代隧道技术, 2024,61(5): 21-28
[13] 祁 军1 王忠杰2,3,4 陈子君1 林存刚2,3,4 谢稳江1 梁 禹2,3,4.盾构隧道开挖引起的深层土体沉降槽宽度参数取值分析[J]. 现代隧道技术, 2024,61(5): 29-41
[14] 李 栋1 周 岳2 王 峰3 李伟鹏4 叶皆显5 曹 雄1 白振超5 党文刚5.隧道围岩节理裂隙变频渗流数值模拟研究[J]. 现代隧道技术, 2024,61(5): 146-155
[15] 马建军1,4 唐 荣1 刘 聪2 黄伟真1 林越翔3.蠕变-渗流耦合下的砂岩力学特性及穿江隧道 稳定性研究[J]. 现代隧道技术, 2024,61(5): 156-166
Copyright 2010 by 现代隧道技术