[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2025, Vol. 62 Issue (2) :162-171    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
预应力作用下管片-型钢-混凝土组合梁承载性能数值模拟研究
(1.深圳大学土木与交通工程学院,深圳 518060;2.中铁工程装备集团有限公司,郑州 450016; 3.深圳大学未来地下城市研究院,深圳 518060;4.深圳市地铁集团有限公司,深圳 518026)
Numerical Simulation Study on the Load Bearing Performance of Segment-steel-concrete Composite Beams under Prestress
(1. College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060; 2. China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016; 3. Underground Polis Academy, Shenzhen University, Shenzhen 518060;4. Shenzhen Metro Group Co., Ltd., Shenzhen 518026)
Download: PDF (7550KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对大断面机械法建造的地铁车站结构中管片-型钢-混凝土组合梁(SSC组合梁)的协同受力问题,建立SSC组合梁三维精细化数值模型,研究预应力对SSC组合梁承载性能的影响,并通过SSC组合梁试验验证数值模型的准确性,进而分析预应力大小、钢绞线截面面积和钢绞线位置对SSC组合梁承载性能的影响。研究结果表明,在不同受力条件下,施加预应力对SSC组合梁极限承载力的提升效果存在明显差异,其中负弯矩工况下(管片处于受拉区)极限承载力提升47.2%,而正弯矩工况下(管片处于受压区)仅提升3.3%。在正弯矩工况下,预应力大小、钢绞线截面面积和钢绞线位置均对SSC组合梁的受力性能影响较小;在负弯矩工况下,调整预应力大小、钢绞线截面面积和钢绞线位置均可优化SSC组合梁的受力性能,有效提升其抵抗变形的刚度和承载能力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词地铁车站   管片-型钢-混凝土组合梁   预应力   承载性能   三维精细化数值模型     
Abstract: This study addresses the synergistic force issue of segment-steel-concrete composite beams (SSC com? posite beams) in metro station structures built by the large-section mechanical construction method. A three-dimensional refined numerical model of the SSC composite beam is established to investigate the effect of prestress on the load-bearing performance of the SSC composite beam. The accuracy of the numerical model is verified through experimental tests on SSC composite beams, followed by an analysis of the influence of prestress magnitude, steel strand cross-sectional area, and steel strand position on the load-bearing performance. The results indicate that the contribution of the steel strand connected between the segments to the ultimate load-bearing capacity of the SSC composite beam varies significantly under different loading conditions. Under negative bending moment conditions(where segments are in the tension zone), the ultimate load-bearing capacity increases by 47.2%, while under positive bending moment conditions (where segments are in the compression zone), it only increases by 3.3%. Under positive bending moment conditions, the effects of prestress magnitude, steel strand cross-sectional area, and steel strand position on the load-bearing performance of the SSC composite beam are relatively small. However, under negative bending moment conditions, adjusting the prestress magnitude, steel strand cross-sectional area, and steel strand position can optimize the load-bearing performance of the SSC composite beam, effectively enhancing its stiffness against deformation and load-bearing capacity.
KeywordsMetro station,   Segment-steel-concrete composite beam,   Prestress,   Load-bearing performance,   Threedimensional refined numerical model     
基金资助:广东省重点领域研发计划(2019B111105001);深圳市科技计划(20220808143139001);深圳大学2035追求卓越研究计划(2022B007).
作者简介: 陈伟杰(1995-),男,博士研究生,主要从事地下装配式结构方面的研究,E-mail: 2250471016@email.szu.edu.cn. 通讯作者:苏 栋(1978-),男,博士,教授,主要从事岩土工程以及地下韧性结构方面的研究,E-mail:sudong@szu.edu.cn.
引用本文:   
.预应力作用下管片-型钢-混凝土组合梁承载性能数值模拟研究[J]  现代隧道技术, 2025,V62(2): 162-171
.Numerical Simulation Study on the Load Bearing Performance of Segment-steel-concrete Composite Beams under Prestress[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(2): 162-171
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I2/162
 
没有本文参考文献
[1] 宋战平1,2,3 李雪莉1 张玉伟1,2,3 钟仕明1 石 卫4.我国地铁车站暗挖工法综述与展望[J]. 现代隧道技术, 2025,62(2): 1-15
[2] 郭成祥1 张燕丽4 黄林冲2,4 韩 冰1 吕文华1 梁 禹2,3,4.装配式地铁车站CHC型钢-混凝土组合接头的力学行为分析[J]. 现代隧道技术, 2024,61(5): 62-70
[3] 刘朝阳1 蒋 凯2 梁 禹2,3,4.基于Kerr地基模型的覆土荷载引起既有装配式地铁车站沉降分析[J]. 现代隧道技术, 2024,61(5): 71-78
[4] 张 羽1 周 鲁1 孙晓贺2 李 俊1 施成华2 刘胜利1.滨海地区地铁隧道渗漏成因与治理对策研究[J]. 现代隧道技术, 2024,61(5): 234-424
[5] 肖明清1,2 徐 晨1,2 谢壁婷1,2.基于总安全系数法的隧道主动支护体系计算方法研究[J]. 现代隧道技术, 2024,61(2): 43-51
[6] 刘兵科1 吴 瑞2 麻建飞2 贺少辉2 白守兴1 苗朋勃1.基于DBN模型的长久运营地铁车站改扩建施工风险评估[J]. 现代隧道技术, 2024,61(1): 75-83
[7] 王 茹 逯同洋 程 凯.地铁车站施工信息模型应用标准化研究[J]. 现代隧道技术, 2023,60(1): 47-55
[8] 李 虎 1,2 韩 刚 1 黄永亮 1 宋 勰 1 李大勇 1.基于地铁车站目标的结构战损快速毁伤评估研究[J]. 现代隧道技术, 2022,59(6): 51-60
[9] 毕湘利 1 王秀志 1 张中杰 2 潘伟强 3 焦伯昌 4 柳 献 4.束合管幕结构侧部卸载工况下受力性能足尺试验研究[J]. 现代隧道技术, 2022,59(5): 163-169
[10] 隗志远 1 冯冀蒙 2 虞龙平 2.地铁车站双层初期支护拱盖法施工过程力学行为研究[J]. 现代隧道技术, 2022,59(3): 265-274
[11] 黄 鹏 1,2 韦良文 1,2 张学富 1,2.城市轨道交通重叠换乘大拱脚暗挖车站拱脚加固研究[J]. 现代隧道技术, 2021,58(6): 137-147
[12] 周稳弟 1,2 梁庆国 1,2 张晋东 3.某地铁车站洞桩法施工变形和结构受力分析[J]. 现代隧道技术, 2021,58(6): 121-128
[13] 张子龙 1 姜谙男 1 于 海 2 王 锋 2.大跨度暗挖地铁车站拱盖法施工力学响应分析[J]. 现代隧道技术, 2021,58(3): 139-146
[14] 陈 梁.盖挖逆作法地铁车站中间桩基础选型研究[J]. 现代隧道技术, 2021,58(2): 166-173
[15] 蒋 频 李远富.基于主成分分析的地铁车站施工风险评估研究[J]. 现代隧道技术, 2021,58(1): 67-74
Copyright 2010 by 现代隧道技术