[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2014, Vol. 51 Issue (6) :50-57    DOI:
分析与试验 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
扩底抗拔桩极限承载力半经验半理论计算方法与试验验证
(1 同济大学土木工程学院地下建筑与工程系,上海 200092;2 上海地固岩土工程有限公司,上海200092)
An Empirical-Theoretical Calculation Method and Full-Scale Verification Test for the Ultimate Bearing Capacity of an Expanded Pedestal Uplift Pile
(1 Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2 Shanghai Geo-anchor Co. Ltd., Shanghai 200092)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  文章考虑了土体力学特性, 以及桩身材料性质、桩长与桩径(含扩底直径)、桩顶埋深、桩顶卸载与加载、群桩效应等诸多因素的影响,结合工程经验给出了计算扩底抗拔桩极限承载力的半经验半理论方法;根据扩底抗拔桩破坏面位置不同,将扩底抗拔桩破坏模式分为三类(即破坏面延伸至地表的整体剪切破坏、破坏面介于地表与扩孔段之间的局部剪切破坏与破坏面位于扩孔段附近的冲剪破坏),推导出了整体剪切破坏模式的极限平衡状态方程;并依据扩底抗拔桩轴对称条件与土体抗拉强度小的力学特征,给出了求解整体破坏面的微分筒数值解法;利用经验法估算了局部剪切破坏、冲剪破坏模式下的端阻力,进而给出了任意土层中扩底抗拔桩承载力计算步骤与方法;最后,结合一足尺试验的计算分析与承载力测试比较,验证了计算方法的可靠性与精确度。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张继红1
2
朱合华1
关键词:   
Abstract: Considering the influences of such factors as soil mechanical characteristics, pile material properties, pile length and pile diameter (including the expanded pedestal diameter), depth of the pile top, and unloading and loading around the pile top and pile group effect, combined with engineering practices, an empirical-theoretical calculation method for the ultimate bearing capacity of an expanded pedestal uplift pile is proposed in this paper. Based on different positions of the failure surface of the expanded pedestal uplift pile, the failure mode of the expanded pedestal uplift pile is divided into three types: entire shearing failure from the failure surface extending to the ground surface, local shearing failure of the failure surface between the ground surface and borehole-expanded section, and punching shear failure of the failure surface near the borehole-expanded section. An ultimate equilibrium state equation under the entire shearing failure mode is derived. According to the axial symmetry conditions of the expanded pedestal uplift pile and the mechanical characteristics of the lower soil tensile strength, a differential cylinder numerical solution is given regarding the entire failure surface. By using the empirical method to estimate the end resistances under the local shearing failure mode or punching shear failure mode, the calculating procedure and method for the ultimate bearing capacity of the expanded pedestal uplift pile in any soil layer is put forward. Finally, the reliability and accuracy of the calculating method is verified through a comparison between the calculated ultimate bearing capacity and the measured one in a full-scale test.
Keywords Expanded pedestal uplift pile,   Ultimate bearing capacity,   Ultimate equilibrium equation,   Differential     
出版日期: 2014-09-21
作者简介: 作者简介: 张继红(1975- ),男,高级工程师,博士,主要从事岩土工程与环境岩土工程领域的科研、咨询、设计与施工工作, E-mail: digusky@163.com.
引用本文:   
张继红1, 2, 朱合华1 .扩底抗拔桩极限承载力半经验半理论计算方法与试验验证 [J]  现代隧道技术, 2014,V51(6): 50-57
ZHANG Ji-Hong-1, 2 , Zhu-He-Hua-1 .An Empirical-Theoretical Calculation Method and Full-Scale Verification Test for the Ultimate Bearing Capacity of an Expanded Pedestal Uplift Pile[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(6): 50-57
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2014/V51/I6/50
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术