The Interaction Among Foundation Pits for a Subway Station in Marine Mud Stratum
1 China Railway Southwest Research Institute Co., Ltd 2 China Railway South Investment Development Co., Ltd
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The Qianhaiwan station of the Shenzhen Metro is located in the reclamation area of Qianhai, which consists of a typical marine mud stratum. The excavation of a foundation pit, envelope controlling, and the stability of the rock surrounding the subway station are key in such complex conditions. The station runs parallel to the integrated, key transportation projects in Qianhaiwan, and interaction may occur among the foundation pits of these projects. Based on the numerical simulation of different foundation pit spaces, excavation sequences, and consolidation, the relationship of foundation pit spaces to the excavation sequence was studied and reasonable values concerning this are given.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: The Qianhaiwan station of the Shenzhen Metro is located in the reclamation area of Qianhai, which consists of a typical marine mud stratum. The excavation of a foundation pit, envelope controlling, and the stability of the rock surrounding the subway station are key in such complex conditions. The station runs parallel to the integrated, key transportation projects in Qianhaiwan, and interaction may occur among the foundation pits of these projects. Based on the numerical simulation of different foundation pit spaces, excavation sequences, and consolidation, the relationship of foundation pit spaces to the excavation sequence was studied and reasonable values concerning this are given.
Keywords:   
Cite this article:   
.The Interaction Among Foundation Pits for a Subway Station in Marine Mud Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(5): 66-72
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I5/66
 
No references of article
[1] LI Jidong1,2 YOU Xinhua1.Seismic Response of the Metro Station with Pre-constructed Pipe-roof Integrating Support and Structure under Strong Earthquake Effect[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 72-78
[2] SHANG Youlei1 TAN Zhun2.Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 177-185
[3] HE Qiaomin1 HU Weiguo2.Research on the Calculation Method for Surface Settlements of the Foundation Pit Based on Random Medium Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 65-71
[4] ZHANG Weibiao.Drill-blast Excavation and Vibration Control of the Large-section Metro Station in Urban Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 185-191
[5] TANG Xiaorong1 ZHANG Liqun2 GUO Xi1 SHI Jinhui1 SUN Bole3.Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 205-208
[6] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 115-123
[7] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 124-132
[8] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 166-173
[9] WANG Yongdong ZHANG Ru ZHANG Yilong.Domestic and International Research on the Critical Velocity of Fires in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 14-24
[10] ZENG Shaowu1 LI Changning2 ZHANG Xuegang1.Application of BIM Technology in the Construction Management of a Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 18-27
[11] .Optimization of the Construction Scheme for a PBA Metro Station Adjacent to an Existing Metro Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 176-185
[12] .On Surface Settlement during Subway Station Construction Using the Center Drift Excavation Method[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 189-193
[13] WEI Gang ZHAO Chengli.On Calculation Formula of Existing Metro Tunnel Displacements Induced by Adjacent Foundation Pit Excavation[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(1): 124-132
[14] LIU Jianguo ZHOU Xiaojun XIAO Qinghua WANG Jinghe GAO Bo.On Criterion for Tunnel Rock Mass Slippage along a Structure Surface and Its Impact Factors[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 103-110
[15] ZHANG Xuegang1 ZENG Shaowu1 WANG Peng2.Application of BIM Techniques to the Construction of the Donggang Station of the Lanzhou Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 46-54
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY