Optimized Design for the Construction of a Double-Arch Tunnel with a Concealed Mid-Partition
(1 China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031; 2 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (941KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract During the construction of a long and shallow double-arch tunnel with a concealed mid-partition, some technical difficulties are encountered, such as the complicated construction procedure of pipe-roof advance support,stress concentrations at both the haunch and side wall while excavating the pilot tunnel and poor stability of sandwiched rock on top of the mid-partition, etc. Using a specific project as an example, pipe-roof technology without a chamber was adopted to decrease the influence on construction efficiency of the double-arch tunnel. The optimized design and calculation analysis of a double-arch tunnel with a concealed mid-partition was carried out with the three aspects of installing long, meshy non-isoparametric system bolts at the top of mid-partition; utilizing a smooth transition between the mid-partition and preliminary lining of the pilot tunnel; and installing suspended self-drilling rock bolts on both sides of the temporary mid-partition. Analysis results show that the construction safety of a double-arch tunnel with a concealed mid-partition is greatly improved by the above-mentioned optimizations; for a double-arch tunnel with a concealed mid-partition, using optimized structures and pipe-roof technology without a chamber enables rapid and safe construction, indicating a positive prospect for engineering application.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Hai-Jun- 1 Zhang-Wan-Bin- 1 Wang-Ming-Nian- 2
KeywordsDouble-arch tunnel with concealed composite mid-wall   Safe and fast construction   Non-cavern pipeshed   Non-isoparametric rock bolt   Smooth transition of mid-wall   Suspended rock bolt     
Abstract: During the construction of a long and shallow double-arch tunnel with a concealed mid-partition, some technical difficulties are encountered, such as the complicated construction procedure of pipe-roof advance support,stress concentrations at both the haunch and side wall while excavating the pilot tunnel and poor stability of sandwiched rock on top of the mid-partition, etc. Using a specific project as an example, pipe-roof technology without a chamber was adopted to decrease the influence on construction efficiency of the double-arch tunnel. The optimized design and calculation analysis of a double-arch tunnel with a concealed mid-partition was carried out with the three aspects of installing long, meshy non-isoparametric system bolts at the top of mid-partition; utilizing a smooth transition between the mid-partition and preliminary lining of the pilot tunnel; and installing suspended self-drilling rock bolts on both sides of the temporary mid-partition. Analysis results show that the construction safety of a double-arch tunnel with a concealed mid-partition is greatly improved by the above-mentioned optimizations; for a double-arch tunnel with a concealed mid-partition, using optimized structures and pipe-roof technology without a chamber enables rapid and safe construction, indicating a positive prospect for engineering application.
KeywordsDouble-arch tunnel with concealed composite mid-wall,   Safe and fast construction,   Non-cavern pipeshed,   Non-isoparametric rock bolt,   Smooth transition of mid-wall,   Suspended rock bolt     
Cite this article:   
LI Hai-Jun- 1 Zhang-Wan-Bin- 1 Wang-Ming-Nian- 2 .Optimized Design for the Construction of a Double-Arch Tunnel with a Concealed Mid-Partition[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(5): 183-187
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2016/V53/I5/183
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY