Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (6) :46-54    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Numerical Simulation Analysis of the Rockburst Mechanism in the Tunnel with High Geostress
(Beijing Third Construction Engineering Quality Test Institute Co.,Ltd,Beijing 100037)
Download: PDF (3774KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In the excavation process of tunnels with high geostress, the original stress equilibrium state is destroyed causing the stress concentration phenomenon and occurrence of serious geologic hazards such as rockburst, wall caving and so on. Based on the Tingzhou tunnel on Ganzhou-Longyan railway in Fujian province, it uses 3D-Sigma software to establish a 3D three-dimensional tunnel excavation numerical model. Taking the stress data obtained by hydraulic fracturing as boundary conditions and estimating the input parameters of the rock mass on the basis of Hoek-Brown strength criterion, the distribution and variation of stress field in the process of tunnel excavation is explored. The results show that in the process of tunnel excavation, the maximum horizontal principal stress, shear stress will form stress concentration area at the top of the arch and arch shoulder, which will lead to brittle failure of rocks. Through simulation monitoring of 7 typical positions on the same cross section of the tunnel, it is found that the changes of the stress field at the top of the arch, the arch shoulder and the bottom of the tunnel are obviously sensitive to the excavation of the tunnel, the rockburst will be more easily occur at these positions. The predicted rockburst locations by the numerical simulation tally with the practical rockburst occurrence locations in the project case. Therefore, the numerical simulation results can be used to explain the regularity of the rockburst, providing some guiding values for the prevention of the engineering rockburst.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WEI Yinghua LIU Fei
KeywordsRailway tunnel   Rockburst mechanism   Numerical simulation   High geostress     
Abstract: In the excavation process of tunnels with high geostress, the original stress equilibrium state is destroyed causing the stress concentration phenomenon and occurrence of serious geologic hazards such as rockburst, wall caving and so on. Based on the Tingzhou tunnel on Ganzhou-Longyan railway in Fujian province, it uses 3D-Sigma software to establish a 3D three-dimensional tunnel excavation numerical model. Taking the stress data obtained by hydraulic fracturing as boundary conditions and estimating the input parameters of the rock mass on the basis of Hoek-Brown strength criterion, the distribution and variation of stress field in the process of tunnel excavation is explored. The results show that in the process of tunnel excavation, the maximum horizontal principal stress, shear stress will form stress concentration area at the top of the arch and arch shoulder, which will lead to brittle failure of rocks. Through simulation monitoring of 7 typical positions on the same cross section of the tunnel, it is found that the changes of the stress field at the top of the arch, the arch shoulder and the bottom of the tunnel are obviously sensitive to the excavation of the tunnel, the rockburst will be more easily occur at these positions. The predicted rockburst locations by the numerical simulation tally with the practical rockburst occurrence locations in the project case. Therefore, the numerical simulation results can be used to explain the regularity of the rockburst, providing some guiding values for the prevention of the engineering rockburst.
KeywordsRailway tunnel,   Rockburst mechanism,   Numerical simulation,   High geostress     
Cite this article:   
WEI Yinghua LIU Fei .Numerical Simulation Analysis of the Rockburst Mechanism in the Tunnel with High Geostress[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(6): 46-54
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I6/46
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] YANG Shaoyu1 WANG Xiaotian2 ZHANG Peiyuan1 LIU Shengchen1 LI Shuchen2 LI Luoning2.A Review of Spray-applied Waterproofing Membrane Technology for Drill-and-Blast Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 1-14
[4] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[5] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[6] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[7] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[8] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[9] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[10] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[11] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[12] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[13] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[14] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[15] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY