Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (2) :200-209    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Key Design Technologies for Mechanized Construction of Railway Tunnels by Drilling and Blasting Method
(1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 2. CREEC (Chengdu) Survey, Design and Research Co. Ltd., Chengdu 610031)
Download: PDF (4948KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As a technical method, the mechanized construction of D&B tunnels, which is based on the matching of high-efficiency large-scale machinery in full process, is intended to solve various construction problems of long and large mountain tunnels in complex mountainous areas with the goal of safety, quality, efficiency and economy. This paper discusses the two key challenges faced by mechanized construction of tunnels by drilling and blasting method,i.e. safety control of the tunnel face and deformation control of the tunnel body from the perspective of the design,and summarizes the key design technologies for mechanized construction of tunnels by drilling and blasting method,including the full-face mechanized construction technology in various geological conditions, the assessment method of tunnel face stability, the active advance support technology of tunnel face, the "quantified" accurate design technology of active advance support, the active support technology with low prestressed anchor bolts, the active support technology with early high-strength shotcrete, the fast-closing technology of primary support ring, and the calcula? tion method for deformation pressure of surrounding rocks, which can provide technical supports for the promotion and application of mechanized construction method in D&B tunnels.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Guodong1 GAN Mufei2 LIU Ke2
KeywordsTunnel   Drilling and blasting method   Mechanization   Stability of tunnel face   Advance support   Active support   Deformation pressure     
Abstract: As a technical method, the mechanized construction of D&B tunnels, which is based on the matching of high-efficiency large-scale machinery in full process, is intended to solve various construction problems of long and large mountain tunnels in complex mountainous areas with the goal of safety, quality, efficiency and economy. This paper discusses the two key challenges faced by mechanized construction of tunnels by drilling and blasting method,i.e. safety control of the tunnel face and deformation control of the tunnel body from the perspective of the design,and summarizes the key design technologies for mechanized construction of tunnels by drilling and blasting method,including the full-face mechanized construction technology in various geological conditions, the assessment method of tunnel face stability, the active advance support technology of tunnel face, the "quantified" accurate design technology of active advance support, the active support technology with low prestressed anchor bolts, the active support technology with early high-strength shotcrete, the fast-closing technology of primary support ring, and the calcula? tion method for deformation pressure of surrounding rocks, which can provide technical supports for the promotion and application of mechanized construction method in D&B tunnels.
KeywordsTunnel,   Drilling and blasting method,   Mechanization,   Stability of tunnel face,   Advance support,   Active support,   Deformation pressure     
Cite this article:   
CHEN Guodong1 GAN Mufei2 LIU Ke2 .Key Design Technologies for Mechanized Construction of Railway Tunnels by Drilling and Blasting Method[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 200-209
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/200
 
No references of article
[1] QIN Tiange 1, 2 WU Li CHEN Qian1 XIA Zhen1 LIU Shiya1, 2 CAI Xin1.Research Status and Development Trends of Intelligent Construction System for Drill and Blast Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 1-10
[2] TANG Xie LIN Guojin1, 2 ZHANG Hang2.Adaptive Strategies for Mechanized Drill-and-Blast Construction in Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 217-228
[3] WANG Zhilong1,2,3,4 WANG Mingnian2,3,4 ZHANG Xiao2,3,4 TONG Jianjun2,3,4 LIU Dagang2,3,4.Study on Mechanical Behaviors and Spatiotemporal Effects in Mechanized Large-section Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 229-239
[4] ZHANG Huan1, 2 ZHANG Shishu3 LI Tianbin1, 2 YANG Gang1, 2 LI Shisen1, 2 XIAO Huabo3 CHEN Weidong3.GAPSO-LightGBM-based Intelligent Prediction Method of Surrounding Rock Grade in TBM Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 98-109
[5] WU Wenfei1,2 ZHU Yanfei1 ZHU Yeting1,2 ZHAI Yixin1,2 TU Lei1,2 PAN Weiqiang1,2.Active-controlled Prefabricated and Mechanized Open-caisson Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 274-282
[6] WANG Mingfa1 LIU Guoshan1 YAN Jianquan2 MAN Xinjie1 LI Hongze2 ZHOU Yangyang1 LI Weiteng2GUO Guangming1 SHAO Xing3 JIANG Weiliang1.Analysis of the Stress Characteristics at the Dome Type Metro Tunnel Intersection[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 157-169
[7] ZHANG Chengyou1 WANG Bo1 DU Zehao1 GAO Junhan1 TAN Lihao2.Analysis of the Suitability of Different Anchor Bolt Support Systems for Rockburst Mitigation and Optimization of Anchor Bolt Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 64-73
[8] KUANG Liang1 SU Wei1 TAO Weiming1 TIAN Siming2 SHEN Yusheng3 LI Xu2 WANG Huiwu1.Study on the Impact Zoning and Fortification Range of Tunnel Structures Crossing Strike-slip Faults[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 45-54
[9] WEI Ronghua1,2 ZHANG Kangjian1,2 ZHANG Zhiqiang1,2.Optimization Study of Waterproof and Drainage Technology Parameters for Deep-buried Ditches in Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 183-192
[10] SONG Yuepeng1 FAN Xiaofeng2 LIANG Yu2,3,4 PENG Hongguo5 ZHANG Hanwei5.Deformation Monitoring and Analysis during the Excavation of Deep Circular Shafts in Intercity Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 219-226
[11] HUANG Dengxia1 LUO Yanbin2 ZHAO Zhiqiang2 CHEN Jianxun2 LIU Weiwei2 FENG Rubing1 WU Teligen1.Measurement and Analysis of Dust Concentration in Service Tunnel during Construction of Tianshan Shengli Tunnel with "TBM Method + Drill and Blast Method"[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 77-85
[12] ZHOU Xiaojun.On Segmenting Design Method of Prefabricated Assembled Secondary Lining for High-speed Railway Tunnels Based on Cross-section Geometric Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 232-243
[13] YANG Zhaofeng1 WANG Bo2 DU Yongquan1 HUANG Changkuan1 FAN Yong1.Application of Active Support Technology for Large Deformation in Haidong Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 245-252
[14] HONG Kairong LIU Yongsheng PAN Yue.Development and Prospects of Construction Technology in Drill-and-Blast Mountain Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 67-79
[15] ZHU Hehua1,2 LING Jiaxin1 ZHU Mengqi1 LI Xiaojun1,2 WU Wei1,2.Intelligent Construction for Drill-and-Blast Tunnels: Latest Technologies and Future Prospects[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 18-27
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY