Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (2) :73-83    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
A Study on the Rock-breaking Mechanism of Disc Cutters on Cone Cutterhead of Full-face Tunnel Boring Machines
(1.Central Design and Research Institute, China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016;2.School of Construction Machinery, Chang′an University, Xi′an 710064)
Download: PDF (6854KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To reveal the rock-breaking mechanism of disc cutters on cone cuttehead of full-face tunnel boring ma? chines (TBM) and verify the influence pattern of the installation arrangement of the disc cutters on the rock-breaking effect, this paper constructs a numerical model of disc cutters on cone cutterhead based on the particle discrete element method, carries out experiments for verification, and conducts a numerical simulation study of the rock-breaking process of disc cutters on cone cutterhead "flat-conical" transition area, based on the analysis of the multi-stage suspension cutting and rock breaking mode of the cone cutterhead. The results show that the rock-breaking of the disc cutters in the conical area is in nature the free-face supported rock-breaking, with the breaking effect jointly influenced by the conical angle of the cutter head, the cutter spacing, and the cutter inclination angle. To improve the rock-breaking efficiency of the cutters, it is advisable to increase the conical angle of the cutter head, reduce the spacing between the cutters in the conical area, and raise the installed angle of the cutters to achieve the "erect in? stallation of oblique cutters" in the conical area. For extremely hard granite with a compressive strength of 180 MPa,the study suggests that the conical angle of the cutter head should be 25°, with the spacing between the cutters in the conical area no more than 70 mm, and the installed inclination of the cutters close to the conical angle of the cutter head.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
NING Xiangke1 GENG Qi2 LU Zhiyong2 YU Qingzeng1
KeywordsFull-face tunnel boring machine   Conical cutterhead   Disc cutter   Rock-breaking mechanism   Particlebased discrete element method     
Abstract: To reveal the rock-breaking mechanism of disc cutters on cone cuttehead of full-face tunnel boring ma? chines (TBM) and verify the influence pattern of the installation arrangement of the disc cutters on the rock-breaking effect, this paper constructs a numerical model of disc cutters on cone cutterhead based on the particle discrete element method, carries out experiments for verification, and conducts a numerical simulation study of the rock-breaking process of disc cutters on cone cutterhead "flat-conical" transition area, based on the analysis of the multi-stage suspension cutting and rock breaking mode of the cone cutterhead. The results show that the rock-breaking of the disc cutters in the conical area is in nature the free-face supported rock-breaking, with the breaking effect jointly influenced by the conical angle of the cutter head, the cutter spacing, and the cutter inclination angle. To improve the rock-breaking efficiency of the cutters, it is advisable to increase the conical angle of the cutter head, reduce the spacing between the cutters in the conical area, and raise the installed angle of the cutters to achieve the "erect in? stallation of oblique cutters" in the conical area. For extremely hard granite with a compressive strength of 180 MPa,the study suggests that the conical angle of the cutter head should be 25°, with the spacing between the cutters in the conical area no more than 70 mm, and the installed inclination of the cutters close to the conical angle of the cutter head.
KeywordsFull-face tunnel boring machine,   Conical cutterhead,   Disc cutter,   Rock-breaking mechanism,   Particlebased discrete element method     
Cite this article:   
NING Xiangke1 GENG Qi2 LU Zhiyong2 YU Qingzeng1 .A Study on the Rock-breaking Mechanism of Disc Cutters on Cone Cutterhead of Full-face Tunnel Boring Machines[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(2): 73-83
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I2/73
 
No references of article
[1] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[2] GENG Qi XIE Weifeng YANG Mulin WANG Xuebin HUANG Yufeng LI Lei LI Xiaobin LI Zhibiao.Development of a Scaled Multifunctional TBM Rock-breaking Test Platform[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 208-218
[3] HE Boning.Review of Guidance and Positioning Technologies for Full-face Tunnel Boring Machines[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 1-9
[4] LIU Shaoqiang1 XU Jianshu2 YANG Xiu2 TANG Qisheng1 XIE Xingfei1 GONG Qiuming1 ZHOU Xiaoxiong3.TBM Cutter Edge Tip Wear Phenomenon and Wear Evolution Characteristics[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 20-27
[5] MU Zheng LI Fulin.Study on the Effect of Shield Tunnelling Parameters on Cutting Performance of Reinforced Concrete Based on FEM-DEM Coupling Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 147-156
[6] GENG Qi1 HUANG Dengxia2 CHEN Jianxun3 LIU Weiwei3 LUO Yanbin3 MA Maoxun1 LI Xiaobin1.Study on Cutting Performance of New Wedge-flat Combined TBM Cutters in Extreme Hard Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 114-124
[7] WANG Defu.Study on Interaction Mechanism and Key Parameters of Shield Cutter Cutting the Pile Foundation—Case Study of Haizhu Bay Shield Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 216-228
[8] ZHANG Qin1 SU Jinhua2 LI Aijun1 XU Binbin1 YAN Xiaolei1 LIU Ding1 YANG Junqi1TANG Jintao1 LI Hongsheng3.Study on Rock Breaking Mechanism of Undercutting Cutter at Precut Slot on Free Surface[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 192-198
[9] ZHAI Shufang1,2 DU Hongkun1 YUE Qichao1 WU Fan3 GONG Qiuming4.Analysis of the Optimal Penetration of Disc Cutter in Rock Breaking Based on Characteristic Particle Size[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 147-152
[10] WANG Lichuan1,2 FU Boyi2 ZHANG Huijian2 JI Guodong1 GENG Qi3 WANG Zhengzheng4.Differences in Mechanical Responses of Granite and Limestone when Cut by TBM Disc Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 81-89
[11] XU Gongyun1 XU Wanghao1,2 YAO Zhigang1 FANG Yong1 LIU Sijin3.Analysis on Influence of Penetration Angle on Disc Cutter Impact Based on Three-dimensional RBD-DEM Coupling Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 77-84
[12] CHEN Yukun1 GUAN Huisheng1 ZHOU Lei2 LIU Cheng1.Research on the Wear Prediction of Disc Cutters Based on BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 78-84
[13] GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan.Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 41-50
[14] LI Gang1 LI Xiaojun1 YANG Wenxiang2 HAN Dong1.Research on Prediction of TBM Driving Parameters Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 154-159
[15] SUN Jiacheng1 LIAO Shaoming1 SUN Lianyong2 MEN Yanqing2 LIU Mengbo1.Analysis of Impact Load and Vibration Response of Shield Disc Cutters in Soil-rock Composite Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 167-176
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY