Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (5) :154-159    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Prediction of TBM Driving Parameters Based on Deep Learning
(1 School of Civil Engineering,Tongji University,Shanghai 200092;2 School of Electronics and Information Engineering,Tongji University,Shanghai 200092)
Download: PDF (2122KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With continuous application of the full face tunnel boring machine (TBM) in tunnelling, the adaptive ad? justment of TBM driving parameters becomes more and more important. Because it is difficult to accurately predict the geological conditions before excavation, it is important to predict some important driving parameters such as cutter head torque and total thrust based on the field monitoring data for the adaptive adjustment of TBM driving parameters. Taking the TBM3 lot of Jilin Water Supply Project as the research object, it introduces the long short-term memory network (LSTM) which can consider the data time correlation, and puts forward a model which can accurately predict the total thrust and cutter head torque of the stable section according to the driving parameters of first 30 s of the rising section of TBM driving cycle. The prediction results show that the prediction accuracy of the total thrust and the cutter head torque in the stable section is high, up to 91% and 89%, respectively. Compared with the ran? dom forest, LSTM can make full use of a large number of TBM driving parameters, reflecting a better prediction ability. The research in this paper has a certain reference value for the real-time adjustment of TBM driving parameters.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Gang1 LI Xiaojun1 YANG Wenxiang2 HAN Dong1
KeywordsFull face tunnel boring machine (TBM)   Driving parameters prediction   LSTM(Long short-term memo? ry)   Deep learning     
Abstract: With continuous application of the full face tunnel boring machine (TBM) in tunnelling, the adaptive ad? justment of TBM driving parameters becomes more and more important. Because it is difficult to accurately predict the geological conditions before excavation, it is important to predict some important driving parameters such as cutter head torque and total thrust based on the field monitoring data for the adaptive adjustment of TBM driving parameters. Taking the TBM3 lot of Jilin Water Supply Project as the research object, it introduces the long short-term memory network (LSTM) which can consider the data time correlation, and puts forward a model which can accurately predict the total thrust and cutter head torque of the stable section according to the driving parameters of first 30 s of the rising section of TBM driving cycle. The prediction results show that the prediction accuracy of the total thrust and the cutter head torque in the stable section is high, up to 91% and 89%, respectively. Compared with the ran? dom forest, LSTM can make full use of a large number of TBM driving parameters, reflecting a better prediction ability. The research in this paper has a certain reference value for the real-time adjustment of TBM driving parameters.
KeywordsFull face tunnel boring machine (TBM),   Driving parameters prediction,   LSTM(Long short-term memo? ry),   Deep learning     
Cite this article:   
LI Gang1 LI Xiaojun1 YANG Wenxiang2 HAN Dong1 .Research on Prediction of TBM Driving Parameters Based on Deep Learning[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(5): 154-159
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I5/154
 
No references of article
[1] YAN Jian1,2 WEI Yanqing3 HE Chuan1 ZHOU Zihan1 GOU Hao1.Hot-freeze Link Technology and Its Application in Snow Melting and Deicing of Tunnel Portal Section of Sichuan-Tibet Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 1-9
[2] YAN Xidong1 GAO Jun1 HAN Fei2 LI Zheng1.Risk Evaluation of the Tunnel Passing through Active Fault Zone and Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 10-22
[3] WANG Shuaishuai1,2 CHEN Guizhou2 GUO Chun2 BAI Yonghou3.On Power Performances of Tunnel Construction Machinery at High-altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 23-29
[4] GONG Chenjie1 YANG Junsheng1 FU Jinyang1, 2.Characteristics and Influencing Factors of Segment Cracking of LargeDiameter River-Crossing Shield Tunnelling in Composite Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 30-42
[5] ZHANG Xin.Research on Application of Random Source Model Based New Microtremor Survey Technology to Shield Tunnelling in Upper Soft and Lower Hard Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 43-50
[6] HUANG Zhongkai1 ZHANG Dongmei1,2.Seismic Vulnerability Analysis of the Shallow-buried Shield Tunnel in Soft Soil Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 51-60
[7] JIANG Heng1 LIU Xuezeng2 ZHU Hehua1.Research on Crack Identification of Highway Tunnel Linings Based on Data Obtained from the Testing Vehicle[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 61-65
[8] TIAN Chongming1 YE Fei1 SONG Guifeng2 WANG Qinglong2 ZHAO Meng1.On Mechanism of Crystal Blockage of Tunnel Drainage System and Preventive Countermeasures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 66-76
[9] LIU Sicong1 ZHAO Chengqiao2 MA Chenxiao1 PENG Fangle.Discussion on Connection Problems of Underground Space in Early CBD from the Perspective of Urban Renewal ——A Case of Lujiazui CBD[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 77-83
[10] WANG Zhilong1,2 ZHOU Renqiang3 YANG Nie1,2 WANG Mingnian1,2 LIU Dagang1,2.Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 84-90
[11] SUN Yulong YAN Zhiguo.Study on Computation of Surrounding Rock Pressure of Super Large Span and Flat Underground Cavern Based on Process Load Concept[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 91-98
[12] ZHOU Zhong CHEN Yun MIAO Linwu. Study of Equivalent Layered Method Based Prediction Model for Deformations Caused by Construction of New Tunnels Undercrossing Existing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 99-103
[13] LV Xilin1,2 ZHAO Yucheng1,2 CAI Jiantao3.Numerical Simulation of Ground Subsidence Induced by Shield Tunnel Construction Disturbance in Water-rich Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 104-109
[14] CHEN Weijie1 SU Dong1,2 CHEN Xiangsheng1,2 PANG Xiaochao2,3 LEI Guoping1,2.Study on the Influence of Coefficients of Subgrade Reaction and Lateral Pressure on Deformation of the Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 110-115
[15] LV Jingfu1 DU Jiangmei1 LUO Zejun2,3 ZHANG Jinjiang1 MIU Yabiao1.Research on the Stability and Supporting Parameters of High-Steep Slope of Yankou Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 116-124
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY