Construction Design for Super-large Section Tunnels in Fault Zone with High Geotress
(1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 2. China Railway 19th Bureau Group Coporation limited,Beijing 100176)
Download: PDF (8181KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The excavation area of the transition section of combined and separate construction in the Shiziyuan Tunnel is 345 m2, and this transition section passes through Wangjiaping No.1 fault with high geostress. In order to solve construction problems faced by super-large section tunnel crossing the fault zone with high geostress, such as primary support deformation and secondary lining cracking, a combination of numerical simulation and engineering analogy is used based on geological conditions to compare and select the tunnel section form, determine structural support parameters, and propose a new construction method. Practice shows that this construction method can solve problems such as difficulty in tunnel construction and difficulty in controlling deformation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Xiwu1 QING Weichen1 LIU Guoqiang2
KeywordsRailway tunnel   Transition section of combined construction and separate construction   Super-large sec? tion   High geostress   Fault fracture zone   Deformation     
Abstract: The excavation area of the transition section of combined and separate construction in the Shiziyuan Tunnel is 345 m2, and this transition section passes through Wangjiaping No.1 fault with high geostress. In order to solve construction problems faced by super-large section tunnel crossing the fault zone with high geostress, such as primary support deformation and secondary lining cracking, a combination of numerical simulation and engineering analogy is used based on geological conditions to compare and select the tunnel section form, determine structural support parameters, and propose a new construction method. Practice shows that this construction method can solve problems such as difficulty in tunnel construction and difficulty in controlling deformation.
KeywordsRailway tunnel,   Transition section of combined construction and separate construction,   Super-large sec? tion,   High geostress,   Fault fracture zone,   Deformation     
Cite this article:   
CHEN Xiwu1 QING Weichen1 LIU Guoqiang2 .Construction Design for Super-large Section Tunnels in Fault Zone with High Geotress[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(4): 204-212
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I4/204
 
No references of article
[1] GE Zhenghui ZHENG Jianguo1 LI Xinzhi CHEN Peng3 NING Zhiwei WANG Pengcheng2.Field Measurement and Numerical Study on Deformation Behavior of Initial Supports with Different Arch Types[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 40-49
[2] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[3] LIU Shangguo1 CI Naiquan1 LIU Rufei1 CHENG Kun2 WANG Fei1 MA Xinjiang3.Tunnel Crown Deformation Monitoring Method Based on Vehicle-mounted Laser Point Clouds[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 209-216
[4] ZHANG Huan1, 2 ZHANG Shishu3 LI Tianbin1, 2 YANG Gang1, 2 LI Shisen1, 2 XIAO Huabo3 CHEN Weidong3.GAPSO-LightGBM-based Intelligent Prediction Method of Surrounding Rock Grade in TBM Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 98-109
[5] ZHANG Shan MENG Lubo QU Xiaoqi LI Tianbin ZHANG Yu.Experimental Study on the Deformation and Failure Mechanism of Red Sandstone under Groundwater Softening[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 201-211
[6] WANG Mingfa1 LIU Guoshan1 YAN Jianquan2 MAN Xinjie1 LI Hongze2 ZHOU Yangyang1 LI Weiteng2GUO Guangming1 SHAO Xing3 JIANG Weiliang1.Analysis of the Stress Characteristics at the Dome Type Metro Tunnel Intersection[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 157-169
[7] CHEN Wang1 PENG Yanfeng1 LIU Weizheng2 ZHANG Siyu2 CHEN Changhui1.Analysis of the Impact of the Three Pipe Jacking Over-crossing Construction on Existing Tunnel and Surface Deformation[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 170-182
[8] JIN Zhengxing1 GUO Ping2 ZHOU Wenpeng1 HU Qiao? SU Dong3 ZHAO Jiaxin1 SUN Bo?.Research on Construction Posture Control Technology for Shallow Buried Extra-large Section Combined Rectangular Pipe Jacking with Tight Gaps[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 259-266
[9] KUANG Liang1 SU Wei1 TAO Weiming1 TIAN Siming2 SHEN Yusheng3 LI Xu2 WANG Huiwu1.Study on the Impact Zoning and Fortification Range of Tunnel Structures Crossing Strike-slip Faults[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 45-54
[10] ZHANG Mingshu1 YAO Chen1 WU Xianguo2 CHEN Hongyu3 FENG Zongbao2 YANG Sai2.Deformation Prediction and Control for Shield Tunnelling Passing under Existing Tunnels Based on BO-Adam-Bi-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 92-99
[11] XUE Qingsong.Deformation Distribution Characteristics and Control Measures of Large-section Rectangular Pipe Jacking Over-crossing Metro Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 148-161
[12] LIU Zhaoyang1 JIANG Kai2 LIANG Yu2,3,4.Settlement Analysis of Existing Prefabricated Subway Stations Induced by Overburden Backfill Load Based on Kerr Foundation Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 71-78
[13] WEI Ronghua1,2 ZHANG Kangjian1,2 ZHANG Zhiqiang1,2.Optimization Study of Waterproof and Drainage Technology Parameters for Deep-buried Ditches in Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 183-192
[14] LI Lijun.Analysis of the Impact of Excavation on Ground Settlement and Adjacent Pipeline Deformation Considering Spatial Variability of Soil[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 193-199
[15] SONG Yuepeng1 FAN Xiaofeng2 LIANG Yu2,3,4 PENG Hongguo5 ZHANG Hanwei5.Deformation Monitoring and Analysis during the Excavation of Deep Circular Shafts in Intercity Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 219-226
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY