Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2024, Vol. 61 Issue (3) :236-244    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Large Deformation Characteristics and Control Measures of Water-rich Phyllite Rock Tunnels
(1. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 741300; 2. Gansu Highway Traffic Construction Group Co., Ltd.,Lanzhou 741300; 3. Department of Railway Engineering and Civil Engineering, Shandong Polytechnic, Jinan 250104;4. Gansu Shunda Road and Bridge Construction Co., Ltd., Lanzhou 741300)
Download: PDF (6449KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the Heimaguan Highway Tunnel in water-rich phyllite rocks, this study delves into the control technology for tunnel rock large deformation. Through analysis of the characteristics and causes of large deformation and failure, it is found that the complex geological tectonism in the tunnel area leads to the development of rock joints in the phyllite, and the migration of mineral components and free oxides in the joints further deteriorate the mechanical properties of the rock mass. Due to the strong sensitivity to water, the phyllite rock softens and disintegrates severely after long-term water immersion, resulting in low surrounding rock strength and susceptibility to large deformations in the tunnel. Field monitoring data analysis shows that the tunnel's large deformations exhibit significant asymmetry, and the deformations worsen after the excavation of the lower heading. Reinforcement measures such as sealing of groundwater, optimization of support parameters, and alternate construction of local double arch have been carried out to deal with the large deformation section in the water-rich phyllite rock tunnel. The results indicate that using the construction technology of discharging and sealing water as well as alternative construction of double-layer arch can effectively control the asymmetric large deformations caused by softening of the phyllite rock by long-term water immersion and it is more convenient and economical.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHANG Weixue1
2 LIANG Qingguo1 LI Qiwei1 FAN Chuntan1
3 WEI Jian4
KeywordsPhyllite rock   Large deformation   Monitoring and measurement   Alternate construction of local double arch (LDA)   Deformation control     
Abstract: Based on the Heimaguan Highway Tunnel in water-rich phyllite rocks, this study delves into the control technology for tunnel rock large deformation. Through analysis of the characteristics and causes of large deformation and failure, it is found that the complex geological tectonism in the tunnel area leads to the development of rock joints in the phyllite, and the migration of mineral components and free oxides in the joints further deteriorate the mechanical properties of the rock mass. Due to the strong sensitivity to water, the phyllite rock softens and disintegrates severely after long-term water immersion, resulting in low surrounding rock strength and susceptibility to large deformations in the tunnel. Field monitoring data analysis shows that the tunnel's large deformations exhibit significant asymmetry, and the deformations worsen after the excavation of the lower heading. Reinforcement measures such as sealing of groundwater, optimization of support parameters, and alternate construction of local double arch have been carried out to deal with the large deformation section in the water-rich phyllite rock tunnel. The results indicate that using the construction technology of discharging and sealing water as well as alternative construction of double-layer arch can effectively control the asymmetric large deformations caused by softening of the phyllite rock by long-term water immersion and it is more convenient and economical.
KeywordsPhyllite rock,   Large deformation,   Monitoring and measurement,   Alternate construction of local double arch (LDA),   Deformation control     
Cite this article:   
CHANG Weixue1, 2 LIANG Qingguo1 LI Qiwei1 FAN Chuntan1, 3 WEI Jian4 .Study on Large Deformation Characteristics and Control Measures of Water-rich Phyllite Rock Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(3): 236-244
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I3/236
 
No references of article
[1] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[2] WANG JingYong1,2 WANG Ping2 YANG Jin2 JI Feng3.Optimization Study on the Support Structure of a Tunnel in Carbonaceous Phyllite Using Physical Model Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 160-169
[3] YANG Yi1,2 SHI Chenghua1,2,3 ZHENG Keyue1,2 PENG Menglong1,4 LOU Yili1,2.Research on Large Deformation Grading Control Technology for High Stress Red Layered Soft Rock Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 252-262
[4] WANG Jianyu.“Resistance”or“Yielding”?Discussion on the Basic Concept for Dealing with Rock Squeezing Problems[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 1-7
[5] HUAN Yuxiang1 TIAN Liyong2 YANG Wenbo1 LI Haoyu1 LIU Yong3 TANG Hao3 YAO Chaofan1.Study on Mechanical Behavior and Spatio-Temporal Deformation during Support Replacement in Soft Rock Large Deformation Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 96-107
[6] ZHU Jianlin1 WANG Lichuan2,3 L IU Zhiqiang1 MA Liyao2,3 LI Qingbin2.Analysis on Action Mechanism of Multi-layer Support in Soft Rock Large Deformation Tunnels with Consideration of Rheological Effects[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 18-24
[7] CHEN Zhimin1 WANG Hong1 GONG Jun2 LI Zengyin2 PENG Yi1.On Surrounding Rock Deformation Characteristics in a High Geostress Soft Rock Tunnel with Double-layer Initial Support[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 85-95
[8] YANG Zhaofeng1 WANG Bo2 DU Yongquan1 HUANG Changkuan1 FAN Yong1.Application of Active Support Technology for Large Deformation in Haidong Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 245-252
[9] HAO Yijie1 LI Gang2 SHEN Dan3 DENG Youwei1 LIU Yiyang1.Study on Automatic Identification and Real-time Measurement Technology for Tunnel Surrounding Rock Settlement Based on Improved YOLOv5[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(5): 58-66
[10] LIU Jiamin1 YANG Feng2 LI Xiaohong2 MA Hongsheng2.Study on Occurrence Characteristics and Risk Prevention Measures of Gas in Non-coal Strata in Zhegushan Tunnel on Wenchuan-Maerkang Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 172-177
[11] SONG Yi1,2.Study on the Structural Design for Tunnels Undercrossing Airport Section in High-speed Railway Throat Area under a Complex Environment[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 213-221
[12] YUAN Chuanbao1 LU Jinlin1 TAO Yujing1 SONG Zhang1 LIU Guoqiang2.Study on Major Engineering Geological Problems of Yuelongmen Tunnel in Mountain Areas Under Complex Strong Earthquake Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 188-195
[13] TAO Yujing1 YUAN Chuanbao1 WANG Maojing1 SONG Zhang1 LIU Guoqiang2.Analysis on Causes of Large Deformation in the Deep-buried Mountain Ridge Section of Yuelongmen Tunnel on Chengdu-Lanzhou Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 229-236
[14] LIU Guoqiang.Study on Two-bench Construction Method with Rapid Ring Closure under the Condition of Large Soft Rock Deformation in Yuelongmen Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 252-258
[15] WEI Lifeng1 TIAN Yang1 ZHU Muyuan1 ZOU Kunmi2 FANG Yong1.Study on the Deformation Control of Non-barrier Launching of Large Diameter Double-mode Shields at Shallow Depth[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 149-158
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY