Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2024, Vol. 61 Issue (6) :269-277    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Construction Methods of Longitudinal Synchronous Grouting for Tunnel Crown Secondary Lining Voids
(1. China Railway 18th Bureau Group Co. Ltd., Tianjin 300222; 2. College of Transportation Engineering, Nanjing Tech University, Nanjing 211816; 3. The Second Engineering Co., LTD., China Railway 18th Bureau Group, Tangshan 063000;4. Civil Engineering and Architecture ,Southwest University of Science and Technology Civil ,Mianyang 621010)
Download: PDF (5200KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Conventional void prevention technologies for the crown of secondary tunnel linings struggle to signifi? cantly reduce void formation and often result in layering between cast-in-place concrete and grouts. To address these issues, a study was conducted based on the Qu'ao Tunnel on the Lanzhou-Hezuo Railway. Using numerical simulation, the impact of crown voids and asynchronous grouting on the stress behaviors of the lining structure was analyzed. A longitudinal synchronous grouting technology for the crown of secondary linings was proposed, and its effectiveness was verified through field applications and cross- detection using various specifications of ground-penetrating radar. The findings are as follows: (1) Compared to a dense state, crown voids and asynchronous grouting increase the minimum principal stress of the crown by 86% and 39%, respectively. This indicates that crown voids pose the greatest safety risk to secondary linings, and layering between grouts and concrete is also a weak point in the structure. Grouting must be synchronized with concrete casting to ensure the integrity of secondary lining; (2)The proposed longitudinal synchronous grouting technology involves arranging grouting pipes with vent openings along the longitudinal direction within the inner edge of the waterproof board at the crown. Grouting is performed immediately after concrete placement and compaction, eliminating blind spots in radial grouting and avoiding cavities or density defects. This also eliminates the composite beam effect in the lining structure and enhances its overall load-bearing capacity; (3) The construction method for longitudinal synchronous grouting is simple to operate and significantly reduces costs compared to radial grouting with mold.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Lichuan1
2 GE Lihui3 WANG Haiyan2 KONG Chao4 LI Qingbin1 WANG Yuntao3 LIU Yufei1
KeywordsTunnel engineering   Lining construction   Crown voids   Longitudinal synchronous grouting     
Abstract: Conventional void prevention technologies for the crown of secondary tunnel linings struggle to signifi? cantly reduce void formation and often result in layering between cast-in-place concrete and grouts. To address these issues, a study was conducted based on the Qu'ao Tunnel on the Lanzhou-Hezuo Railway. Using numerical simulation, the impact of crown voids and asynchronous grouting on the stress behaviors of the lining structure was analyzed. A longitudinal synchronous grouting technology for the crown of secondary linings was proposed, and its effectiveness was verified through field applications and cross- detection using various specifications of ground-penetrating radar. The findings are as follows: (1) Compared to a dense state, crown voids and asynchronous grouting increase the minimum principal stress of the crown by 86% and 39%, respectively. This indicates that crown voids pose the greatest safety risk to secondary linings, and layering between grouts and concrete is also a weak point in the structure. Grouting must be synchronized with concrete casting to ensure the integrity of secondary lining; (2)The proposed longitudinal synchronous grouting technology involves arranging grouting pipes with vent openings along the longitudinal direction within the inner edge of the waterproof board at the crown. Grouting is performed immediately after concrete placement and compaction, eliminating blind spots in radial grouting and avoiding cavities or density defects. This also eliminates the composite beam effect in the lining structure and enhances its overall load-bearing capacity; (3) The construction method for longitudinal synchronous grouting is simple to operate and significantly reduces costs compared to radial grouting with mold.
KeywordsTunnel engineering,   Lining construction,   Crown voids,   Longitudinal synchronous grouting     
Cite this article:   
WANG Lichuan1, 2 GE Lihui3 WANG Haiyan2 KONG Chao4 LI Qingbin1 WANG Yuntao3 LIU Yufei1 .Construction Methods of Longitudinal Synchronous Grouting for Tunnel Crown Secondary Lining Voids[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(6): 269-277
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I6/269
 
No references of article
[1] WANG Sheng1,2,3,4 WEI Qin1,2 LI Liping3.Catastrophic Mechanisms and Research Development Trends of Water and Mud Inrushes in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 15-25
[2] ZOU Yulin1, 2 LIU Jing1 WANG Bo2 CHENG Ziquan2 XIE Zuodong2 GU Hao3 WANG Kaiyue.Study on the Causes and Prevention Measures of Water and Mud Inrush Disasters in Sichuan Yanjiang Expressway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 259-269
[3] QIN Tiange 1, 2 WU Li CHEN Qian1 XIA Zhen1 LIU Shiya1, 2 CAI Xin1.Research Status and Development Trends of Intelligent Construction System for Drill and Blast Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 1-10
[4] WANG JingYong1,2 WANG Ping2 YANG Jin2 JI Feng3.Optimization Study on the Support Structure of a Tunnel in Carbonaceous Phyllite Using Physical Model Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 160-169
[5] WANG Shuaishuai FU Yifan2,3 XU Yong1 SHI Jingfeng1 GUO Chun2,3.Parametric Study on Air Chamber Ventilation in Tunnelling Using Relay Fans for Airflow Distribution[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 240-248
[6] ZHANG Meining1,2 SONG Zhanping1,2,3 YUE Bo4 LI Xu1,2,3 ZHAO Yirui2 TAO Lei5.Research on Construction and Application of a Rapid Tunnel Surrounding Rock Classification Model Based on Real-time Images and Advanced Geological Information[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 87-97
[7] YANG Cunbin1,2 REN Yang,1,2 WU Yuehua1,2 HE Wanchao1,2 LI Tianbin1,2.Dynamic Intelligent Prediction of Tunnel Surrounding Rock Geological Information Based on M-LSTM Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 74-82
[8] WANG Haokang1,2 SHEN Yusheng1,2 PAN Xiaohai1,2 CHANG Mingyu1,2 ZHANG Xinyang1,2 SU Wei3.Experimental Study on Dynamic Characteristics of Tunnels Crossing Multi-fault Fracture Zones in Strong Earthquake Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 212-220
[9] ZHANG Chengyou1 WANG Bo1 DU Zehao1 GAO Junhan1 TAN Lihao2.Analysis of the Suitability of Different Anchor Bolt Support Systems for Rockburst Mitigation and Optimization of Anchor Bolt Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 64-73
[10] ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1, 2 WANG Haokang1, 2 PAN Xiaohai1, 2 WANG Yanyan1, 2.Mix Proportion Design of Similar Materials for Tunnel Surrounding Rocks Based on GA-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 82-91
[11] HUI Qiang1 GAO Feng1,2 TAN Xukai1 YOU Dongmei1.Study on Structural Damage Characteristics of Tunnels Crossing Active Faults Based on Layered Dislocation Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 35-44
[12] XU Xiaojing1,2 SONG Zhanping1,2,3 TIAN Xiaoxu1,2 DING Libo? SUN Yinhao? ZHAO Junbo1,2.Analysis of the Support Effect of Micro Steel Pipe Pile-Anchor Bolt at Tunnel Portal Slope Based on the Incremental Method[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 118-128
[13] CHEN Zhimin WANG Hong CHEN Jun ZHAI Wenhao WANG Duobin LI Wenhao CAI Yunchen.Study on Gradation Characteristics and Arching Effect of Talus in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 172-181
[14] ZHANG Xiao1, 2 WANG Mingnian1, 2 YU Li1, 2 WANG Zhilong1, 4 LIU Dagang1, 3 MA Zhizhong5.Theoretical Calculation Model for Stability of Tunnel Excavation Face with Pre-grouting Reinforcement[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 42-51
[15] XU Jianfeng1 ZHANG Xiangchuan1 QIN Guifang1 KUANG Huajiang1 LIU Guanghui1 DENG Xingxing1.Intelligent Identification Method of Surrounding Rock Grades of Tunnel Face Based on Drilling Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 79-87
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY